1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.

Slides:



Advertisements
Similar presentations
Mech Systems Proposed EMI Modifications Marc Campell 9/2/03.
Advertisements

1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
GLAST LAT ProjectLAT Mgr’s meeting July 17-18, LAT Planning Meeting Mechanical Systems Marc Campell.
GLAST LAT ProjectQuarterly Review of the GLAST/LAT Project, August 14, 2001 Martin Nordby1 GLAST Large Area Telescope: Mechanical Systems Martin Nordby.
GLAST LAT ProjectLAT Mgr’s Meeting October 13, LAT Planning Meeting Mechanical/Thermal Systems October 2004 Marc Campell.
GLAST LAT ProjectMonthly Status Meeting, June 30, Cost/Schedule Reports for 4.1 LAT Presentation Presentation May 2005 Month End Gamma-ray Large.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 1.1 Management 1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectLAT Mgr’s Meeting November 17, LAT Planning Meeting Mechanical/Thermal Systems November 2004 Marc Campell.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy1 GLAST Large Area Telescope:
GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 1 GLAST Large Area Telescope: MGSE Status Report Eric Gawehn SU-SLAC I&T MGSE Engineer
GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering.
GLAST LAT Project – Cost and Schedule ReviewNovember 3, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review November 3, 2004.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
LAT-PR Section 22-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
GLAST LAT ProjectLAT Mgr’s Meeting LAT Planning Meeting Mechanical/Thermal Systems March 17, 2005 Marc Campell.
111/3/2004 GLAST LAT ProjectLAT Engineering Meeting LAT Face to Face Manager’ Meeting Nov. 3, 2004 LAT Level Design Status LAT Face to Face Manager’ Meeting.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
LAT Design Integration1 GLAST LAT ProjectDecember 2003 LAT Planning Meeting December 10, 2003 Design Integration LAT Planning Meeting December 10, 2003.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems X-LAT Assy1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
GLAST LAT I&T GLAST Monthly Mission Review Nov 3, 2005 wnjohnson 1 Monthly Mission Review LAT Environmental Test Planning November 3, 2005 W Neil Johnson.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Thermal-Vacuum Testing LAT Environmental Test.
NRL Pathfinder Planning Meeting1 GLAST LAT Project07 September 2005 NRL Pathfinder Planning Meeting Dynamics Testing Update NRL Pathfinder Planning Meeting.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Overview LAT Environmental Test.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Environmental Test MGSE Design Concepts Rev 1.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 PREP For CDR - April Schedule Wall Walk GSFC Chart Flip (Select) Post.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST Calorimeter Monthly Cost / Schedule / Mission April 2004 Naval Research Lab Washington DC wnjohnson 1 Monthly Cost/Schedule/Mission Review GLAST.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
LAT-PR Section 11-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
LAT MPSRLAT Structural Analysis-1 GLAST LAT ProjectNov-04 Structural Analysis: Completed Tasks LAT System Level –LAT Environmental TIM Support A success.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 1 GLAST Large Area Telescope:
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
Mechanical Integration
Environmental Test Planning
Integration and Test GLAST Large Area Telescope:
GLAST Large Area Telescope:
LAT Pre-Environmental Test Plan
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
1. Introduction and Overview
GLAST Large Area Telescope:
Thermal Vacuum Test: Plans and Procedures
Design Integration and Analysis
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Integration and Test Organization Chart
GLAST Large Area Telescope:
Mechanical/Thermal Systems
GLAST Large Area Telescope:
Introduction and Overview
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Design Integration and Analysis
GLAST Large Area Telescope:
Presentation transcript:

1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager

2 GLAST LAT ProjectMechanical Systems Accomplishments Accomplishments during December. –Pathfinder for the handling of Flight hardware in B/33. –4 of 5 Top Flange Heat Pipes were bonded into Grid. –Tracker mounting hardware installed into Grid. –LM completed bonding doublers onto Radiator panels –X-LAT Plate fab is complete less Nickel plating.

3 GLAST LAT ProjectMechanical Systems 3 Month Milestones Dec - Feb

4 GLAST LAT ProjectMechanical Systems Drawing Release Plan 57 of 81 (70%) drawings released –18 MLI drawings have been added to MECH drawing list –4 unreleased parts not needed until I&T operations In check Known drawing revisions –Jan – 2 planned X-LAT (in release cycle) & Radiator IDD’s

5 GLAST LAT ProjectMechanical Systems Concerns Lockheed Martin - X-LAT plate & Radiator delivery schedule –LM’s estimated cost at completion is $8.49M Exceeds available budget of $7.5M Approval for additional funding will require DOE Chicago office approval (est. 3 months) LM directed to work on Flight hardware only Suspend test planning, design and other preparations Suspend MGSE design and fab –Manufacturing progress is slower than expected –Each step of the way there have been problems typical for a first article build Need to reduce the time it takes to resolve these problems from weeks to days

6 GLAST LAT ProjectMechanical Systems Concerns (cont) Grid to I&T delivery date – schedule continues to compress. Grid thermal control components & Downspout Heat Pipe to Grid thermal joint are not verified until LAT T/Vac test. –Difficult to access these components at this level (remove Radiators & ACD).

7 GLAST LAT ProjectMechanical Systems Open Flight Design Issues Requirements for Grid survival heaters & thermostats being revised to raise minimum Tracker temperatures –Bonding operations on hold pending CCB TCS validation vs. LM modified Radiator Thermal Vacuum & Balance plans –TCS test requirements being developed with Tom McCarthy –~3 additional TCS cases proposed –Cost & schedule impacts will be evaluated –TCS risk assessment and Qual test plan requested by GSFC Define GBA Static Load test requirements & plans –Detailed load cases & STE being developed 1 st draft complete – loads have gone down and many test cases will be deleted or combined Stress to perform another iteration on the load cases, then Test in-house vs out of house decision can be made

8 GLAST LAT ProjectMechanical Systems Open Flight Design Issues (cont) Radiator integration sequence –Coupon testing of repeated make & break of joint in process –Disassembly facilitated by use of mold release agent X-LAT MLI blanket billowing will violate stay clear Radiator MLI blanket and wiring violates stay clear –Working issue with LM & Spectrum Astro –S/C to LAT MLI design options in work with Spectrum Astro Working group meeting planned for Jan Radiator vibration requirements –Current proposal is pre & post low level sine sweep, sine vibe and Acoustic testing –Working with GSFC & LM to minimize & finalize requirements –Preliminary design of vibration test fixture complete. –Design concepts for Acoustic test fixture are next –Effort on hold

9 GLAST LAT ProjectMechanical Systems MECH Qualification Program

10 GLAST LAT ProjectMechanical Systems PMCS Mech Sys (SLAC only) current schedule variance +76K –Received Flight Grid #1 (late) Mech Sys (SLAC only) cum schedule variance -$746K –Driven by late receipt of Grid #2, TCS hardware and Static Load Test did not start. Mech Sys (LM only) current cost variance -$426K, and Mech Sys (LM only) cum cost variance -$929K –LM is behind schedule and not on their headcount profile –LM has provided a spending profile for Jan – Mar to take them up to $7.5M –Investigating other testing options for Radiator and X-LAT plate

11 GLAST LAT ProjectMechanical Systems Program Threats Top threats to maintaining schedule –Grid Box is a pathfinder for Flight hardware operations in B33 –Highly compressed, success oriented schedule –LM X-LAT & Radiator delivery have no float and LM manufacturing is not maintaining their schedule Top threats to staying within cost –LM staying on schedule –LM maintaining headcount profile, esp. planned roll-off –SLAC staying on schedule –Interdependencies with DAQ for fab, assy & test of TCS