F. Frasconi I.N.F.N. Pisa for the Virgo Collaboration TAUP2007 Sendai, September 11-15, 2007 VIRGO EXPERIMENT VIRGO: a large interferometer for Gravitational.

Slides:



Advertisements
Similar presentations
24. June 2004 Andreas Freise Status of VIRGO A. Freise For the Virgo Collaboration European Gravitational Observatory SPIE Glasgow 2004.
Advertisements

Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
September 21, 2005Virgo Status – ESF Workshop1 Status of Virgo B. Mours.
VIRGO: WHERE WE COME FROM WHERE WE ARE GOING GIOVANNI LOSURDO - INFN Firenze Advanced Virgo Project Leader for the Virgo Collaboration (and the LIGO Scientific.
1 Virgo commissioning status M.Barsuglia LAL Orsay.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
VSR1 summary - post VSR1 Commissioning plans E. Tournefier (LAPP-CNRS) LSC-Virgo meeting Oct 22 nd, 2007.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
Virgo Control Noise Reduction
Francesco Fidecaro Advanced Virgo Review, Cascina, November 3, 2008 Virgo brief status report.
GWADW 2010 in Kyoto, May 19, Development for Observation and Reduction of Radiation Pressure Noise T. Mori, S. Ballmer, K. Agatsuma, S. Sakata,
Status of Virgo Gabriele Vajente INFN Pisa and Scuola Normale Superiore di Pisa On behalf of the Virgo Collaboration 11 th Gravitational Wave Data Analysis.
Interferometric detector for GW: status and perspectives Giovanni Losurdo INFN Firenze-Urbino
The GEO 600 Detector Andreas Freise for the GEO 600 Team Max-Planck-Institute for Gravitational Physics University of Hannover May 20, 2002.
Interferometer Control Matt Evans …talk mostly taken from…
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
LIGO-G D Enhanced LIGO Kate Dooley University of Florida On behalf of the LIGO Scientific Collaboration SESAPS Nov. 1, 2008.
07. July 2004 Andreas Freise Status of VIRGO A. Freise For the Virgo Collaboration European Gravitational Observatory.
Status of VIRGO Francesco Fidecaro (after Lisa Barsotti) - University and INFN Pisa – on behalf of the VIRGO collaboration Aspen - January 19 th, 2005.
Novemebr 5, 2006LSC meeting1 Virgo Update Prospects on detector performance and running schedules B. Mours.
Status of Virgo A. Viceré INFN-Firenze – Università di Urbino.
SUSPENSIONS Pisa S.Braccini C.Bradaschia R.Cavalieri G.Cella V.Dattilo A.Di Virgilio F.Fidecaro F.Frasconi A.Gennai G.Gennaro A.Giazotto L.Holloway F.Paoletti.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
January 12, 2006ILIAS-WG3 Frascati1 Virgo+ & Advanced Virgo B. Mours With material from G. Losurdo, M. Punturo, A. Viceré and others.
Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ Advanced VIRGO Input optics LIGO-G Z.
Lisa Barsotti - University and INFN Pisa – on behalf of the Virgo Collaboration CASCINA - January 24 th, 2005 ILIAS  Locking of Full Virgo Status of VIRGO.
Status of VIRGO Lisa Barsotti - University and INFN Pisa – on behalf of the VIRGO collaboration ANNECY - December 15 th, 2004  Status of the Commissioning.
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
LIGO-G Z The Status of VIRGO E. Tournefier for the Virgo Collaboration GWADW 2004, Aspen From the CITF to VIRGO Commissioning of the Fabry-Perot.
1 LESSONS FROM VIRGO+ May 17th 2010 E. Calloni for the Virgo collaboration.
The status of VIRGO Edwige Tournefier (LAPP-Annecy ) for the VIRGO Collaboration HEP2005, 21st- 27th July 2005 The VIRGO experiment and detection of.
VIRGO LAPP – Annecy NIKHEF – Amsterdam INFN – Firenze-Urbino INFN – Frascati IPN – Lyon INFN – Napoli OCA – Nice LAL – Orsay ESPCI – Paris INFN – Perugia.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
The VIRGO Suspensions Control System Alberto Gennai The VIRGO Collaboration.
The control of the Virgo Superattenuator: present and future Giovanni Losurdo - INFN Firenze/Urbino on behalf of the Virgo Collaboration.
WG3 Report Michele Punturo Harald Lück. WG3 composition Co-Chairmen M.Punturo INFN Perugia, Italy H.Lück MPI für Gravitationsphysik, AEI, Hannover, Germany.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
International Gravitational Wave Network 11/9/2008 Building an Stefan Ballmer, for the LIGO / VIRGO Scientific Collaboration LIGO G
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
Status of Virgo GWDAW12 Status of Virgo GWDAW Dec Leone B. Bosi INFN and University of Perugia (Italy) On behalf of the Virgo Collaboration.
Status of Virgo a short update Michele Punturo. A bit of History July 29 – August –C6 run Duty cycle: Locking 89%, Science Mode 86% September.
LIGO-G D Commissioning at Hanford Stan Whitcomb Program Advisory Committee 12 December 2000 LIGO Livingston Observatory.
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
Advanced Towards Advanced Virgo Giovanni Losurdo – INFN Firenze Advanced Virgo Coordinator on behalf of the Virgo Collaboration.
SAT Plans for System R&D Signal Recycling Construction and A&I Short Suspension Upgrade Roberto Passaquieti Università di Pisa and INFN-Pisa AdV Review.
Advanced Advanced Virgo BASELINE DESIGN advanced Giovanni Losurdo – INFN Firenze Advanced Virgo Coordinator for the Virgo Collaboration.
The VIRGO detection system
L’Interferometro Virgo Michele Punturo INFN Perugia a nome della Collaborazione Virgo.
MG 11 - Berlin Virgo status Marie-Anne Bizouard (LAL-Orsay) on behalf of the Virgo Collaboration.
1 The status of VIRGO E. Tournefier LAPP(Annecy)-IN2P3-CNRS Journées SF2A, Strasbourg 27 juin – 1er juillet 2005 The VIRGO experiment The commissioning.
Edwige Tournefier for the Virgo Collaboration The status of Virgo.
THE NEXT GENERATIONS OF GRAVITATIONAL WAVE DETECTORS (*) Giovanni Losurdo INFN Firenze – Virgo collaboration (*) GROUND BASED, INTERFEROMETRIC.
F. Frasconi – INFN Pisa Meeting between INFN and JINR Visiting the EGO site October 13, 2015 Advanced VIRGO EXPERIMENT Advanced VIRGO Interferometer: a.
VIRGO Superattenuator performance and its evolution in the SAFE Project F. Frasconi – INFN Pisa (ET-WP2 Workshop – Roma – February 27, 2009)
Present Status of the Virgo Experiment
Evolution of the Virgo detector: The Virgo+ plans
Status of Virgo GWDAW Dec 13-16
Advanced VIRGO Experiment
Virgo Update B. Mours LIGO-G Z August 15, 2006 LSC meeting.
Superattenuator for LF and HF interferometers
The Superattenuator upgrades and the SAFE Project
Virgo – Injection SYStem
Virgo Update – LSC meeting
Improving LIGO’s stability and sensitivity: commissioning examples
The views of Virgo collaboration groups on upgraded/advanced Virgo
Status at the Prague meeting
Presentation transcript:

F. Frasconi I.N.F.N. Pisa for the Virgo Collaboration TAUP2007 Sendai, September 11-15, 2007 VIRGO EXPERIMENT VIRGO: a large interferometer for Gravitational Wave detection started its first scientific run

September 11, 2007F. Frasconi / INFN Pisa2 The Interferometer at EGO site NIKHEF Amsterdam, LAPP Annecy, INFN Firenze-Urbino, INFN Genova, IPN Lyon, INFN Napoli, OCA Nice, LAL Orsay, ESPCI Paris, INFN Perugia, INFN Pisa, INFN Roma1, INFN Roma Tor Vergata

September 11, 2007F. Frasconi / INFN Pisa3 VIRGO Optical scheme Laser 20 W Input Mode Cleaner (145 m) Power Recycling 3 km long Fabry-Perot Cavities Output Mode Cleaner (4 cm)

September 11, 2007F. Frasconi / INFN Pisa4 Injection System Based on a Nd:YVO4 laser source with 20 W power ( =  m) Laser Cavity

September 11, 2007F. Frasconi / INFN Pisa5 Injection System (cont.) Input mode cleaner cavity about 145 m long based on: - Injection Bench (fall 2005, New Installation ) - End Mirror

September 11, 2007F. Frasconi / INFN Pisa6 Detection System (scheme) Suspended bench with optics for beam adjustments and OMC Detection, amplification and demodulation on external bench Laser Beam Suspended Bench External Bench

September 11, 2007F. Frasconi / INFN Pisa7 Detection System (cont.) Output Mode-Cleaner External bench Suspended bench

September 11, 2007F. Frasconi / INFN Pisa8 Mirror Suspensions The Superattenuator (SA) is the mechanical system adopted to isolate the optical components from seismic activities (local disturbances). It is based on the working principle of a multistage pendulum. Thanks to the isolation performance the system is compliant with future detector upgrades.

September 11, 2007F. Frasconi / INFN Pisa9 Main features of SA Thermal Noise Two types of SA: Short Chains & Long Chains; Hybrid system: active control below 4 Hz & passive attenuation starting from 4 Hz; Measured attenuation upper limit: at 10 Hz (detection band extended in the low frequency region)

September 11, 2007F. Frasconi / INFN Pisa10 Mirror Suspension Control The Inverted Pendulum (IP) is the elastic structure conceived to allow a wide positioning control of the suspension point Hierarchical control of the mirror (3 actuation points): - Inertial Damping on IP (to control tidal strain and drift of any origin ); - Local Control on Marionette (angular mirror displacements reduced down to fraction of  rad); - local damping on Reference Mass (RM).

September 11, 2007F. Frasconi / INFN Pisa11 Mirror Suspension Control improvements Several improvements have been done at the control level of the mirror: - global positioning IP control (GPIPC) - better stability for bad weather conditions – “guardian software” for earthquake oscillation high detector stability and high duty cycle

September 11, 2007F. Frasconi / INFN Pisa12 Fall 2005 Shutdown The shutdown was suggested by a few major problems found during the commissioning phase: - control problems and alignment drift on PR mirror; - spurious resonances and back-scattered light on suspended IB (no possibility to operate ITF at full power).

September 11, 2007F. Frasconi / INFN Pisa13 Fall 2005: detector upgrades (PR) Non-monolithic & Curved mirror induced: - control problems (spurious resonances); - misalignment and jitter noise for vertical translations. Monolithic flat mirror & Parabolic telescope on IB 120 mm R=4100 mm 350 mm Incident beam PR mirror transfer function Old New

September 11, 2007F. Frasconi / INFN Pisa14 Fall 2005: detector upgrades (IB) New suspended IB characteristics: - Faraday isolator (fixing back-scattered light) - parabolic telescope - thinner monolithic suspension wires Faraday Isolator

September 11, 2007F. Frasconi / INFN Pisa15 Activities before VSR1 Commissioning activity & noise hunting important for:improve controls & automation improve detector reliability & robustness Week-end Science run WSR1 (Sept. 2006)-WSR10 (Mar. 2007) important for:test shift organization data collection Collected data used for: detector characterization data analysis playground prepare joint analysis with LIGO

September 11, 2007F. Frasconi / INFN Pisa16 Detector sensitivity evolution

September 11, 2007F. Frasconi / INFN Pisa17 The First Virgo Science Run (VSR1) The run started on 18 th May 2007 It will last 4 months (till end of Sept. 2007) In coincidence with the last period of LIGO S5 run

September 11, 2007F. Frasconi / INFN Pisa18 Improved sensitivity during VSR1 Sensitivity during VSR1: Sept. 5, 2007 Sensitivity during VSR1: May 18, 2007

September 11, 2007F. Frasconi / INFN Pisa19 VSR1 horizon for inspiral sources BNS inspiral range: ~4.0 Mpc Mpc

September 11, 2007F. Frasconi / INFN Pisa20 VSR1: detector statistic

September 11, 2007F. Frasconi / INFN Pisa21 Data Analysis (DA) LSC-VIRGO agreement on common data taking & DA has been signed Data exchange has been activated since May 2007 (start of VSR1) Organization: - DA groups have been merged (joint review committee created for each working group); - Joint DA committee and run planning committee have been created (discussing the DA activities and run schedule even after VSR1/S5) Final goal: LSC-VIRGO joint analysis - white paper in progress

September 11, 2007F. Frasconi / INFN Pisa22 After VSR1 VIRGO is competitive at high frequency with LIGO detectors; VIRGO has the best sensitivity at low frequency (below 40 Hz) even if: the design sensitivity is still far away in the low-medium frequency range. Future activities: - a better understanding of the detector behavior - starting a detector upgrades campaign (VIRGO+ & AdV) to be implemented in parallel with other GW detectors all over the World (eLIGO & advLIGO).

September 11, 2007F. Frasconi / INFN Pisa23 VIRGO+ Main goals: - improving the design sensitivity by a factor ~2 - VIRGO+ should be back in Science Mode in 2009 (second half) in coincidence with eLIGO VIRGO+ is meant as a series of detector upgrades: - new IMC payload (new end mirror: better optical quality & larger size) - thermal compensation system - higher laser power (laser amplifier by LZH/GEO) - new mirrors (reduced losses -> higher finesse) - new control electronics

September 11, 2007F. Frasconi / INFN Pisa24 Advanced VIRGO (AdV) Goals - improving the VIRGO design sensitivity by a factor ~10 - back in data taking around Main scheduled changes: - higher power laser (optical readout noise) - heavier mirrors (optical readout noise) - better coatings (thermal noise) - signal recycling (shape the sensitivity curve) - beam waist position (thermal noise) AdV Conceptual Design document in preparation The exact AdV upgrades still under discussion

September 11, 2007F. Frasconi / INFN Pisa25 Conclusions VIRGO still in Science Mode - VSR1 started in May: data taking 4 months long - very good detector stability (thanks to control improvements) - good duty cycle in science mode (~ 82%) - 18 locking periods longer than 40 hours - BNS inspiral range at 4.0 Mpc level VIRGO+ upgrades - improving the design sensitivity of a factor ~2: preparation in advanced status - commissioning period of the upgrades -> back in science mode within the second half of 2009 (in coincidence with eLIGO) AdV upgrades - working groups & coordinators: defined - improving the design sensitivity of a factor ~10: conceptual design document in progress to be submitted to the Funding Institutions by the end of the year