ATLAS BIS MDT wiring facility D. Fassouliotis P. Ioannou C. Kourkoumelis V. Pancheluga D. Pappas E. Stefanidis V. Birioukov (engineer from Protvino) UNIVERSITY.

Slides:



Advertisements
Similar presentations
Alignment systems for GlueX GlueX Collaboration Meeting Bloomington, Indiana May 20-22, 2004 Courtesy of Dimos Sampsonidis, Aristotle University of Thessaloniki.
Advertisements

E.K.Stefanides March 07, The Muon Spectrometer of the ATLAS detector: progress report on construction and physics studies at the University of Athens.
1 AMS-02 TRD Status Report Stefan Schael RWTH Aachen TIM Meeting, CERN, June 2001 TRD meeting: Wednesday 16:15 in room !!!
Status of the ATLAS MM project
Marcel Vreeswijk (NIKHEF) The NIKHEF Muon Mission Drift tube wiring Chamber assembly X-ray scan of BOL-0 at CERN Status and Plans The Making of ATLAS Muon.
DESY Zeuthen 1 Precision drift chambers (MDT) for ATLAS muon system. G.Chelkov JINR (Dubna) DESY Zeuthen 10 September 2002.
The Greek Muon Chambers (BIS) The three Greek Laboratories: 112 (90 BIS BIS36 ) chambers University of Athens (UoA) Tube wiring/assembly (30,000.
DOE/NSF Review of ATLAS, 1 Mar 2000, BNL Muon MDT Front End Electronics (WBS 1.5.9) James Shank DOE/NSF Review of U.S. ATLAS Detector (with help from:
Christine KOURKOUMELIS University of Athens ATLAS Muon Chamber construction in Greece and alignment studies for H  ZZ  4μ decay Como, 8/10/03.
14/11/03 CERN-ilo presentationC.Kourkoumelis,UoA1 ATLAS Muon Drift Tube wiring and testing in Greece Joint effort UoA+NTUA* Athens,14/11/03 Christine KOURKOUMELIS.
1-4 April 2004HEP 2004 D.Fassouliotis, UoA ATLAS Muon Chambers Construction in Greece Dimitris Fassouliotis Conference on RECENT ADVANCES IN PARTICLE AND.
UoA, NTUA, AUThATLAS Overview week 1-7 Oct 2004 BIS Integration and Commissioning Status All 112 bare BIS chambers are at CERN All but 5 are equipped with.
ATLAS BIS MDT wiring facility D. Fassouliotis P. Ioannou S. Igropoulos C. Kourkoumelis V. Pancheluga D. Pappas E. Stefanides V. Birioukov (engineer from.
PRODUCTION and CERTIFICATION of Multi Wires Proportional Chambers for the LHCb Muon System at CERN K.Mair for the LHCb Muon Group CERN* Poster anlässlich.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
The Greek Muon Chambers (BIS) The three Greek Laboratories: 112 (90 BIS BIS36 ) chambers ALL since Sept 04 University of Athens (UoA)
University of Athens ATLAS BIS MDT assembly HEP 2001 Presented by Heraklion, 6-8 April 2001 D. Fassouliotis D. Fassouliotis.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
Specific Instrumentation for Test-Stands: The X-ray scanner Serge Smirnov Moscow cluster: MEPhI, MSU, Lebedev PI MicroMegas General Meeting, CERN 5-6 Nov.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
Quality Control Rad T 110.
Platform positioning during MDT construction Tool for the platform positioning Ph. Schune J.-Ch. Barrière P RAXIAL A LIGNMENT S YSTEM (barrel) positioning.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
ATLAS muon endcap 1 layer of tracking chambers (MDT) 3 layers of trigger chambers (TGC) which we are working on ATLAS TGC installation and commissioning.
Manoj Kumar Jha INFN – Bologna On Behalf of ATLAS Muon Calibration Group 20 th October 2010/CHEP 2010, Taipei ATLAS Muon Calibration Framework.
BARREL ALIGNMENT PLATFORM POSITIONING Goal: Positioning of the platforms at their nominal position on the MDT chambers (No position measurement in a database).
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Muon-raying the ATLAS Detector
18/11/04DELPHI visits, PhC1 Visits to DELPHI/LHCb Ph.Charpentier.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
M. Bianco On behalf of the ATLAS Collaboration
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
ATLAS micromegas activities (MAMMA)
Luca Spogli Università Roma Tre & INFN Roma Tre
NCP-CERN Project status Waqar Ahmed. Items Production sites requirements Clean room Gas system Gas leak measurement station. Leakage current measurement.
The ATLAS Muon Spectrometer 1 has ~355,000 drift tubes installed into 1200 precision Monitored Drift Tube (MDT) tracking chambers arrayed over a 22 m high,
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
Astrophysics Detector Workshop – Nice – November 18 th, D. Attié, P. Colas, M. Dixit, M. Riallot, W. Wang Micromegas tests ̶
Analyzing Praxial Platform Positions on MDT Barrel Chambers Using X-Ray Tomograph Measurements Chris Hayward Advisor: Silvia Schuh August 14, 2003 UM CERN.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
Precision Drift Chambers for the ATLAS Muon Spectrometer
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Construction and Characterization of a GEM G.Bencivenni, LNF-INFN The lesson is divided in two main parts: 1 - construction of a GEM detector (Marco Pistilli)
By: Eric Seabron. B-Field Sensors: Used for magnetic field mapping. Tube Gases: No leaks, 93% Argon/ 7% CO2 at 3 bars. MDC Temp. Sensors: Accounts for.
ATLAS Transition Radiation Tracker End-cap Quality Control and the Characterization of Straw Deformations Michael Kagan University of Michigan Supervisor:
Micromegas for SLHC A project to investigate the use and determine the working parameters of Micromegas for SLHC tracking – in conjunction with the ATLAS.
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
The Collider Detector at Fermilab (aka CDF) Jennifer Pursley Intermediate Seminar Oct. 28, 2003.
Prototyping of Complex Systems Some Experiences Gilson Bootstrapping Series November 8, 2011 Farshid Feyzi Physical Sciences Laboratory.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
Precision Drift Tube Detectors for High Counting Rates O. Kortner, H. Kroha, F. Legger, R. Richter Max-Planck-Institut für Physik, Munich, Germany A. Engl,
1 TRACK CHAMBERS BASED ON PRECISION DRIFT TUBES HOUSED INSIDE 30 mm MYLAR PIPE A.Borisov, N.Bozhko, R.Fakhrutdinov, A.Kozhin, B.Leontiev, A.Levin.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Zhe Yang Michigan REU Program Symposium August 9, 2017
(On Behalf of CMS Muon Group)
PANDA Muon Group Meeting, Protvino 7 June 2011 G
Dept. of Physics and Space Sciences, Florida Institute of Technology
Commissioning and Calibration Strategies for Micromegas Vertex Tracker
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
nSW Alignment Installation
Overview of the Frascati Production Facilities
Gas Monitoring Chamber Production Status
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
ATLAS Muon Spectrometer and
L H C A T L A S International Collaboration on the LHC Project
Presentation transcript:

ATLAS BIS MDT wiring facility D. Fassouliotis P. Ioannou C. Kourkoumelis V. Pancheluga D. Pappas E. Stefanidis V. Birioukov (engineer from Protvino) UNIVERSITY OF ATHENS Visit our web-page at:

AIM: Wire/check all the Monitored Drift Tubes for the ATLAS BIS chambers 30,000 !! Tubes – 128 chambers (8 layers) Construction specifications……: Wire position ± 25 μm Wire tension 350 ± 15 gr Gas leak rate < bar*l/sec at 3 bar Leak at 3.4 kV (gain 1.6*10 5 ) < 2nA/m ……necessary to achieve such physics results : H  μμμμ

TO ACCOPLISH AIM: Build a clean room 20±1 o C Class 50,000 Develop a wiring table+wiring tools Flat top Tube holders Alignment of two end-plug-holders End-plug insertion (coaxility tube/end-plug) Tube pressure crimping Speed of wire threading Wire tensioning Develop on-line QA of tube construction parameters Length check End-plug/tube axis coaxiality Wire tension SITE WAS CERTIFIED ON MAY 1999

Greek delegate to CERN Council, Professor Emmanuel Floratos (front, centre), accompanied by members of the Greek team, with the first ATLAS muon chamber built in Greece installed in the x-ray tomograph at CERN. …the first precision chamber to come off a production line was built by a collaboration of three Greek universities and it arrived at CERN from Thessaloniki on 5 August. This chamber is the first complete model of 1200 that will be built around the world over the next few years.…. First ATLAS muon chamber arrives from Greek production line CERN Bulletin 33/99; 16 August 1999

FIRST CHAMBER FROM 17 SITES IN 9 COUNTRIES TO PASS ALL TESTS (13 μm position fluctuation of wire) CERN Courier, October 2000 Verifying the alignment of interferometer beam optics on the ATLAS experiment's X-ray tomograph at CERN. A small muon chamber from Greece, destined for the barrel region of the detector, is on the tomograph. It went on to pass the test with its wires showing an average fluctuation of just 13  m from their nominal positions. To pass the test, a chamber has to score less than 20  m.

…Micromechanics Electronics… …Automation The tools we use ….