ALICE August Summary. AP/FEL/Thz 3 blocks – A)7-11 Aug (7 shifts, #1973-85) – B)16-17 Aug (4 shifts #1992-96) – C)25-29 Aug b. hol. w/end (7 shifts #2012-24)

Slides:



Advertisements
Similar presentations
#3224 Sat 17 th November Restored an “AP” set-up with some measurement of Twiss. – The idea was to take some BPM data with a known twiss set-up to see.
Advertisements

AGS/Booster Issues Feb. 25, 2014 Time Meeting Haixin Huang.
ERLP / ALICE: a bit of history Yuri Saveliev. ... how all this started SRS DIAMOND ERLP 4GLS... to greener pastures.... Oh yes ! We get there Hmmmm.
Diagnostics and commissioning on ERLP Yuri Saveliev ASTeC CONFORM Project: EMMA Design Review Workshop February 2007, Daresbury Laboratory.
Coherent Radiation from High-Current Electron Beams of a Linear Accelerator and Its Applications S. Okuda ISIR, Osaka Univ Research Institute.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
Commissioning August & September. 2 Agenda 11:20 Coffee 11:30 Introduction Sue S 11:35 Controls (an overview) Brian M 10:55 Controls & Data Acquisition.
ALICE : Superconductive Energy Recovery Linac (ERL)
ALICE : Superconductive Energy Recovery Linac (ERL) “Quick course” for new machine operators Part 3: Experimental and Operational Procedures Y. Saveliev.
Possible new EMMA injectors bdm. Motivation ALICE due to shut down soon Alternate EMMA injection (assuming EMMA project continues which it should …) Several.
#3271 Sat 08-Dec-12. R56 Injector – BC2 GS calibration First calibrate BC2 1. Start with beam in centre of screen INJ-5. Read INJ-DIP-01 current and convert.
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac Physics, Diagnostics, and Commissioning Strategy P. Emma LCLS FAC Meeting April 29, 2004 LCLS.
Bruno Muratori STFC, Daresbury Laboratory Commissioning EMMA 02/07/09 PRISM workshop – Imperial College.
AGS pp Status Feb. 20, 2015 RSC Meeting Haixin Huang.
Injector Accelerator Readiness Review, 10/31/06 Henrik Loos 1 Beam Losses During LCLS Injector Phase-1 Operation Scope of phase 1 operation Operating modes.
FEL Beam Dynami cs FEL Beam Dynamics T. Limberg FEL driver linac operation with very short electron bunches.
Injector Setup/Mini-phase  Description of injector setup  sources of drift  Mini-phase procedure for injector  Checking the rest of the machine. Stephen.
ALICE Commissioning Part II : Injector Yuri Saveliev Seminar on 14-15/07/2008 Gun to Booster Booster to FCUP-01 The rest of the Injector.
AGS PP Progress Haixin Huang January, 3, Haixin Huang2 Daily Activities of Last Week 12/19 Difficulty to bring beam into Booster. Source only pulses.
Longitudinal transfer function a.k.a. (M 55 ) measurements at the JLab FEL Pavel Evtushenko, JLab  Jlab IR/UV upgrade longitudinal phase space evolution.
ASTRA Injector Setup 2012 Julian McKenzie 17/02/2012.
SPPS, Beam stability and pulse-to-pulse jitter Patrick Krejcik For the SPPS collaboration Zeuthen Workshop on Start-to-End Simulations of X-ray FEL’s August.
Advanced Accelerator Design/Development Proton Accelerator Research and Development at RAL Shinji Machida ASTeC/STFC/RAL 24 March 2011.
G 0 Coordinator Update & “To-Do List” Joe Grames William & Mary, June 5-6, 2006  Hall C Beam Line Tasks  Accelerator Preparation Tasks  Beam Halo 
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
Tom Powers LLRF Systems for Next Generation Light Sources LLRF Workshop October 2011 Authored by Jefferson Science Associates, LLC under U.S. DOE.
First Lasing of the ALICE Free Electron Laser David Dunning On behalf of the ALICE FEL team (Jim Clarke, Neil Thompson, Mark Surman and Andy Smith), and.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
3281, 13 th December 2012 Combined fast-MCT, AR2-BPM-01, and TOA measurements. All data at \\srofs1\PSD\Alice\Work Temp\2012\12\13\Shift 3 Different parameter.
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
BPMs period General BPM Tasks/Projects New single bunch BPM electronics on ALICE AR1 + ST2 They had been tested already last year by Alex and Ian.
Bruno Muratori (for the EMMA team) STFC, Daresbury Laboratory EMMA commissioning 02/09/08.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
March-May 2012 AP Projects 1.Beam substructure. 2.Bunch length/energy spread in pre- compressed bunch using RF techniques with 325 kV gun voltage 3.TOA.
‘S2E’ Study of Linac for TESLA XFEL P. Emma SLAC  Tracking  Comparison to LCLS  Re-optimization  Tolerances  Jitter  CSR Effects.
Velocity bunching from S-band photoinjectors Julian McKenzie 1 st July 2011 Ultra Bright Electron Sources Workshop Cockcroft Institute STFC Daresbury Laboratory,
John Carwardine January 16, 2009 Some results and data from January studies.
FEL Spectral Measurements at LCLS J. Welch FEL2011, Shanghai China, Aug. 25 THOB5.
XFEL Beam Dynamics Meeting Bolko Beutner, DESY First results of micro-bunching and COTR experiments at FLASH Bolko Beutner, Winfried Decking,
8 th February 2006 Freddy Poirier ILC-LET workshop 1 Freddy Poirier DESY ILC-LET Workshop Dispersion Free Steering in the ILC using MERLIN.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz NuFact’08, Valencia, Spain, July 4, 2008 Acceleration.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Applications by means of the accelerator technologies based on cERL
LSC/CSR Instability Introduction (origin of the instability) CSR/LSC
Off-axis injection lattice design studies of HEPS storage ring
LCLS_II High Rep Rate Operation and Femtosecond Timing
Experience with beam instrumentation at Linac4
Nonscaling FFAG design and EMMA experiment
Beam based measurements
Grigory Eremeev, Joe Grames, Reza Kazimi, Yves Roblin
Cutting Beam Horns in BC1
Slice Parameter Measurements at the SwissFEL Injector Test Facility
Wake field limitations in a low gradient main linac of CLIC
Injector and positron source scheme. A first evaluation Thanks to O
Undulator Tolerances for LCLS-II using SCUs
Longitudinal Diagnostics for start-up
Revised Commissioning Strategy
Time-Resolved Images of Coherent Synchrotron Radiation Effects
XFEL Oscillator in ERLs
ERL accelerator review. Parameters for a Compton source
Linac/BC1 Commissioning P
LCLS Commissioning P. Emma, et al
Linac Physics, Diagnostics, and Commissioning Strategy P
Transverse coherence and polarization measurement of 131 nm coherent femtosecond pulses from a seeded FEL J. Schwenke, E. Mansten, F. Lindau, N. Cutic,
First results of micro-bunching and COTR experiments at FLASH
Linac Diagnostics Commissioning Experience
XFEL Beam Dynamics Activity at CANDLE
Comparison between 4K and 2K operation performance of CEBAF injector cryomodules Grigory Eremeev Monday, August 19, 2019.
Isotope Readiness Review Run Plans
Presentation transcript:

ALICE August Summary

AP/FEL/Thz 3 blocks – A)7-11 Aug (7 shifts, # ) – B)16-17 Aug (4 shifts # ) – C)25-29 Aug b. hol. w/end (7 shifts # ) Overall summary – Pursued proper FEL-set-up (BC1 = -12 O ) and THz-for-FEL-set-up (BC1 =-20 O )) with no lasing.. THz-for-FEL set up seems to have too large energy spread (500 keV) – FEL-set-up saw some interesting (not-repeatable later) spectra on one occasion #1980. Largest MCT signal during this period, but no gain – 1 THz 10-h ZF exposure with repeated ‘interesting’ result. – Problems included machine instabilities (long set-up/restore times, MO changes), EMI-1 locked off, FEL mirror misalignments

(A) 7-11 Aug (7 shifts, # ) Pursued FEL proper set up (BC = -12/+25) and THz for FEL (BC = -20/+25). Only one shift with significant spectrometer results, much time spent in troubleshooting or restoring set-ups, fighting unstable machine. Shift #1980 (BC = -12/+25) saw very narrow spectrometer signal but no gain during cavity scan. EMI-1 locked off during this period (due to EMMA ring installation) Thus energy spread after linac not measured. Many phase shifts and significant phase jitter in injector, also instability of beam size in INJ- 2. Master oscillator was replaced with signal generator. FEL cavity mirror alignment went probably after 10th when last decent MCT signal seen (was discovered on 17th) #1980

(B)16-17 Aug (5 shifts # ) Focussed on THz for FEL set-up. Only very small spectrometer signal seen. Problem with FEL cavity mirror alignment discovered THz cells exposure 10 hs run overnight during this period to verify 'interesting' result. Original MO replaced after this period

(C) Aug b. hol. w/end (7 shifts # ) THz 1.1 m from window THz maximum at large off-crest value THz vertical profile characterised RAD surveys: -TCL Lab with standard ER set-up -EMI with beam through Be 20 uS window at 27.5MeV, 10Hz, 40pC, 20us FEL work: THz set-up (BC =-20) spectra too broad, use zero’th order signal. At LC phase set for max THz, EMI-1 energy spread ~ 500 keV Restoring #1980 “FEL set-up” (BC=-12) even poorer signal on MCT Scale? EMI-1 energy spread ~ 500 LC =+17

Other observations THz signal sensitive to quad focussing in ST2 – Can change signal by > 1 V Reducing buncher power 550W  520W improved THz signal. THz signal sensitive to very small changes in linac/booster gradient (0.01 on Grad Set) THz & FEL signals better when ER is poorer Bump on LC2 ER in first ~15  sec caused by beam loss in ST2 manual vale (which is in turn caused by buncher instability over first ~15 usec). Can get rid of bump by focussing in ST2. #2019 Phase jumps are often non-global