MICE Meeting at Columbia University June 13, 2003 Implementation of argon gas jacket Edgar L. Black IIT.

Slides:



Advertisements
Similar presentations
Liquid Hydrogen Absorber
Advertisements

Frame design Status TB-SWG May 2005 Presented by K. Ioki Prepared by M. Morimoto VV and Blanket Division, ITER Garching ITER.
Unit 1 Lesson 4 GMAW Filler Materials. GMAW filler material Selection of the material that is to be manufactured into filler wire for GMAW is based on.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
Agreement on scope of supply and extent of interface among different suppliers of the AFC module This talk covers the scope of supply on the Absorber Focus.
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
9/26/2003E.L.B. MICE Meeting 9/26/2003 Absorber design update Edgar L. Black IIT.
MICE COLLABORATION MEETING CERN March 29-April 1, 2004 Detector/Focus Coil module interface details P. Fabbricatore INFN-Genova Detector/Focus Coil module.
5/7/2003Edgar L. Black IIT MICE Meeting at Columbia University Hydrogen/Focus Module Components assembly Details concept June 13,2003.
MICE Engineering Integration Update August 13, 2003 Edgar L. Black IIT.
1 MICE Absorber working group Columbia, 13 June 2003 MICE Hydrogen System. Preliminary HAZOP. Elwyn Baynham, Tom Bradshaw and Iouri Ivaniouchenkov,
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
MICE modules interface proposal FAC module Phone meeting Edgar Black IIT 2/13/2004.
11/26/2002Edgar L Black IIT MICE Video Conference November 27, 2002 Summary of safety implementation for proposal.
MICE Meeting at Columbia University Absorber windows design comparisons E.L.Black/IIT June/2003.
Non-welded Window Option Edgar L. Black IIT August 15,2003.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
Dean R Walters Chamber and Bellows Jan. 5, Summary Chamber The plan is to construct a chamber made of 316LN stainless steel with.
5/7/2003Edgar L. Black IIT MICE Integration Meeting Hydrogen/Focus Module Components Details development May 9, 1003.
MICE VIDEO CONFERENCE Cooling Channel/Detector Integration July 30, 2003 Edgar L. Black IIT.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
Integration March 18, 2004 Latest MICE integrated lattice layout Edgar L.Black IIT.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module progress update Wing Lau – Oxford.
MICE Hydrogen System Design Tom Bradshaw Iouri Ivaniouchenkov Elwyn Baynham Columbia Meeting June 2003.
Corrosion & Associated Degradation
OBJECTIVE: AM24.02 Identify, cut, drill, bend, shape, file, and grind cold metals.
Pressure Vessels.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Methods of Aluminum Welding Cory Whidden Material Science Larry Peel 11 –
Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
Technical Details of the T2K Horns L. Bartoszek BARTOSZEK ENGINEERING NBI2006.
MICE Coupling Coil Update Steve Virostek for Allan DeMello Lawrence Berkeley National Laboratory MICO January 23, 2013 January 23, 2013.
TURBO FLANGES We specialize in design, CNC milling, metal turning, plasma cutting, and TIG welding all done in house. Please contact us for further information.
Mechanical Design of Process Equipment
1 COMPTON POLARIMETER PRELIMINARY MAGNET DESIGN 06/03/08 Christopher Vidal, Senior Mechanical Designer Ernie Ihloff, P.E., Engineering Group Leader EE.
Capacitor Discharge Welding
ID 1.75 Material list: aluminum ¼ X ¾ X 6 in flat bar ¾ X 6 in round stock 1 X 6 in round stock 2 ea 5/16 heli-coil Weld 1” joints.
56 MHz SRF Cavity Cryostat support system and Shielding C. Pai
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Lithium Hydride Absorber Program C. M. Lei March 17, 2008.
G.Barber Mice Tracker Mechanical Ral June Tracker Mechanical Update Contents:- Station Space Frame Station Layout Connectors Patch Panel Still to.
Design Option #1 Angled plates. Design Option #2 Horizontal target outboard of the pump entrance. Steep ramp on the “shelf”. More clearance.
Arc Welding Equipment Welding Machines AC – (alternating current) used for most agricultural arc welding jobs and has low purchase cost compared.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
HFT-Beam Pipe D. Beavis BNL March 14, Overview Update on new Beam pipe –Assembly drawing –Material changes –Length changes Outlook 2 HFT F2F at.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
LHC Machine Advisory Committee Meeting no.19 QRL status 16 June 2006 G. Riddone, AT-ACR On behalf of the QRL team.
All Metal Gate Valve from VAT
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
Recent Changes to the FD TPC Design Bo Yu Oct. 20, 2015.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
CLEAN UP & INSPECTION.
Technical Issues Facing in the FRIB Cryomodule
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
S1-G cryomodule assembly status
MICE Coupling Coil Update
Stainless Steel Water Well Casing.
Perforated Casing Pipe. Stainless Steel Perforated Casing.
Corrosion & Associated Degradation
Perforated Casing Pipe. Stainless Steel Perforated Casing.
Additional Upstream Coil Shielding
Single Detector Design
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

MICE Meeting at Columbia University June 13, 2003 Implementation of argon gas jacket Edgar L. Black IIT

Focus magnet/hydrogen module layout

The new MICE cooling channel layout have some variations from the previous layouts: Sliding interconnecting flanges can not be use because of the increase of nozzles on the focus/hydrogen modules, instead clamp flanges with large deflection metallic seals are being considered. Cold helium pipes are exposed at one end of the module, the potential of accumulating oxygen around this pipes and insulation persist; therefore, the shroud design continues Fabricators favor 304 stainless steel for material of construction formability, strength and welding are their preference If aluminum material the vessel thickness is 2cm and the shroud 0.5 cm, for 304SS vessel 1.3 cm and shroud 0.32 cm I am waiting for budgetary estimates to compare. Fabricators are interested on this project and the market is at the best time. We need more detail drawings for better estimates Help!!