1. EML – 144 Axial struts for ends A and C EML – 80 Lateral struts for ends A and C EML1 - 16 special struts for ends A and C Total = 240 struts 2. EMS.

Slides:



Advertisements
Similar presentations
Battery PDB Controller GPS Data Recorder Antenna Cam Lower Stage Harness Upper portLower port Upper port Lower Stage Harness Sensors Cam Avionics Layout.
Advertisements

Vector: Data Layout Vector: x[n] P processors Assume n = r * p
Figure 1 ; Video File. Figure 2 : Anatomical orthogonal coordinate system Z Y +RY : Left Axial Rotation -RY: Right Axial Rotation +RZ : Right Lateral.
January 6. January 7 January 8 January 9 January 10.
1/2a = 1/2g a = g t (s)x (m)y (m)vx (m)vy (m)Ek (J)Ep (J)Em (J)
ADC Performance and Calibration of MDT Chambers
Muon Spectrometer Nomenclature Kevin Black/Vivek Jain/Stephane Willocq went through various documents and produced what we think are the correct names.
Dec 11, 2001E. Hazen -- ATLAS Muon Electronics1 ATLAS MDT Electronics On-Chamber CSM Adapter Proposed Features: –Mounts on CSM Motherboard just like the.
Locations of Kinematic Mount Struts on Small Wheel MDT Chambers C-end C. H. Daly University of Washington Dept.of Mechanical Engineering 8 March 2007.
Locations of Kinematic Mount Struts on Small Wheel MDT Chambers A-end C. H. Daly University of Washington Dept.of Mechanical Engineering 8 March 2007.
1 13 Oct 2006 Small Wheel Phase 1.9 Logistics C. Weaverdyck N. Nation 13 October 2006.
Large Wheel Installation Helped with initial installation in 2005 Installed EML and EMS chambers in sector frame. Last chamber installed 31 October 2006.
Lecture 6 – Bearings and Bushings
How to support a shaft? The motor just turns the shaft. It doesn’t provide any support.
Columns and Struts.
RFCC Module Design Update  automatic tuners  cavity suspension  cavity installation Steve Virostek Lawrence Berkeley National Lab MICE Collaboration.
ATLAS Endcap Muon System WBS 3.5 Frank Taylor MIT M&O Request FY06 Toronto August 3, 2005 V1.1.
Thursday, April 3, 2014MAT 312. Thursday, April 3, 2014MAT 312.
Tuesday, April 22, 2014MAT 312. Tuesday, April 22, 2014MAT 312.
Spacecraft Interface/Handling Ring Robert Besuner 12 August 2004.
Engineering with Wood Presenters: David W. Boehm, P.E. Gary Sweeny, P.E. Gary Sweeny, P.E. Shear Walls and Diaphragms Why Buildings Don’t Fall Over.
Using Drawings to Communicate Lecture 3 –How to create an isometric drawing of a part when given front, top, & right side views.
EML 2023 – Modeling, Drawings Lecture Auxiliary and Section Views.
1 Possible setup for the H8 test beam F.Cerutti pIntroduction: from H8 Phase I to the system test pPossible setup in : Magnets on the H8 beam.
End of Year State Reporting TN Attendance Supervisors’ Conference Murfreesboro, TN April 17, 2014.
Auxiliary and Section Views. EML 2023 Computer Aided Design auxiliary views A surface that appears as inclined in a principal view can be shown in true.
SunSatFriThursWedTuesMon January
THE H8 TEST STAND Conceptual Design Mechanical supports Status of preparation Project schedule 1 (Brandeis, CERN, MPI, Seattle - presented by Sandro Palestini)
Fabrication Update – The Frame Awakens Matt Hoff LBNL April 2,
Entrepreneurship Mr. Bernstein Layout Planning, pp April 24, 2013.
Columns and Struts.
YE2 – YE3 distance Manual measurements
RESTORE HABITAT for HUMANITY WE MOVED FRIDAY, APRIL 1
“Separation of Muons and Doubly Charged Particles using MDT”
for the transition region on behalf of the RPC upgrade group
Date of download: 11/14/2017 Copyright © ASME. All rights reserved.
“Network of Centres for Project Development and Management”
Workshop activities with animals during lessons
Example 13 Wendy Balmer Indiana U
برنامه ی تندرستی چرخه ی زندگی برنامه های تندرستی
HLRF Web Application User Manual v 1.0 Jan
به نام اوکه یکتاست وبی همتا
Longitude and Latitude
60% more payload to LEO from the Moon than from Earth.
Movies v Plays
/ / 'III '- Ei 'ltWtilw I' :&:& 1:1 1:1: - 1 I 0.
Mount St Helens: APRIL 1980 Mount St Helens: APRIL 1981
The encapsulation problem of the LAT heavy trays
Nick Czapla Structures-Hab
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
EML 2023 – Stress Analysis Lecture 1 – Stress State.
Fig. 4 Bone tissue formation within the Ti-mesh channels.
Osteoarthritis and Cartilage
Vertebral Collapse Caused by Bone Metastasis
Pneumatic power very popular in industry
Protocol for submission: Deadline 1-APRIL-2019!
Points of a Compass and Direction
Arthroscopic Treatment of Talar Body Fractures
Delayed repair of right atrial isomerism with obstructed total anomalous pulmonary venous drainage by hybrid stent insertion between the left-sided atrium.
მხარდაჭერით დასაქმების განვითარება საქართველოში საპროექტო წინადადება
Gerunds.
ZUMTOBEL ML4 B EM 2/40W TC-L M625 LDE KA Description
Yohei Ohno et al. JCIN 2015;8:e35-e37
CS224N Section 2: EM Nate Chambers April 17, 2009
Calculus W 11 April 2012.
EML 4230 Introduction to Composite Materials
Calculus W 18 April 2012.
Late complication from a retrievable inferior vena cava filter with associated caval, aortic, and duodenal perforation: A case report  Massimiliano Veroux,
Sagittal thick (3.5 mm, A, B, C) and thin (1 mm, D, E, F) and axial thin (0.4 mm, G, H, I) reconstructions of high-resolution flat-panel CT in the same.
Presentation transcript:

1. EML – 144 Axial struts for ends A and C EML – 80 Lateral struts for ends A and C EML special struts for ends A and C Total = 240 struts 2. EMS – 160 Axial struts for ends A and C EMS – 80 Lateral struts for ends A and C Total = 240 struts 3. EIL – 96 Axial struts for ends A and C EIL – 48 Lateral struts for ends A and C Total = 144 struts 4. EIS – 64 Axial struts for ends A and C EIS – 32 Lateral struts for ends A and C Total = 96 struts Layout of Axial and Lateral Struts 2 April 2003 C H Daly

Axial = 72 Lateral = 40 EML Chambers Special mount = 8 2 April 2003 C H Daly

EMS Chambers Axial = 80 Lateral = 40 2 April 2003 C H Daly

EIL Chambers Axial = 48 Lateral = 24 2 April 2003 C H Daly

EIS Chambers Axial = 32 Lateral = 16 2 April 2003 C H Daly