CSE9020 Wk04 / 1 CSE9020 CASE STUDY Week 4 Notices –The final Friday in Week 13 is the 24th October Questions –Unit Administration - Supervisor’s Roles.

Slides:



Advertisements
Similar presentations
CSE9020 Wk04 / 1 CSE9020 CASE STUDY Week 4 Notices –The final Friday in Week 13 is the 4th June 2004 Questions –Unit Administration - Supervisor’s Roles.
Advertisements

COMP4710 Senior Design Process Documentation and Deliverables.
ITFN 2012 and ITFN 4014 Orientation Spring 2012 Semester.
1 Unit & District Tools Phase 1. 2 To access the new Unit and District Tools, you will need to click on the link embedded in the MyScouting Flash page.
End of Fall Term Checkup SYSC-4907  Group Procedures  Progress Report  Oral Presentations  Poster Fair.
Lecture Roger Sutton 21: Revision 1.
Adult Social Care Workforce Development Interview Techniques Stephanie Charles Lisa Koc Sharon Middleton.
Sponsored by the U.S. Department of Defense © 2002 by Carnegie Mellon University July 2002 Pittsburgh, PA Lecture 6: Team Planning.
Gu & Maher University of Sydney, October 2004 DECO2005 Monitoring Team Process.
Chapter 15 Design, Coding, and Testing. Copyright © 2005 Pearson Addison-Wesley. All rights reserved Design Document The next step in the Software.
CSE9020 / 2003 Wk01 / 1 CSE9020 CASE STUDY Week1 Welcome to unit CSE9020 (and possibly CSE3200) better known as ‘The Case Study’ for Semester 2, 2003 I.
Lecture 2b: Software Project Management CSCI102 - Introduction to Information Technology B ITCS905 - Fundamentals of Information Technology.
HERA briefing n Vicky Ward – Job Evaluation Project Manager 1.
CSE9020 / 2004 Wk01 / 1 CSE9020 CASE STUDY Week1 Welcome to unit CSE9020 (and possibly CSE3200) better known as ‘The Case Study’ for Semester 1, 2004 John.
Chapter 3: The Project Management Process Groups
Chapter 5: Project Scope Management
The Project AH Computing. Functional Requirements  What the product must do!  Examples attractive welcome screen all options available as clickable.
Write On! Creating an Online Dissertation Writing Group.
Release & Deployment ITIL Version 3
Unit 2: Managing the development of self and others Life Science and Chemical Science Professionals Higher Apprenticeships Unit 2 Managing the development.
Career Investigation Explanation (do not copy into this presentation, it is not a template for your project!)
ENG 205 CE-ME-MECE-MSE DESING DEVELOPMENT. Vocabulary items Brief (n.): detailed instructions or information that are given at a meeting Design brief:
Innovative Schools toolkit
COMPGZ07 Project Management Presentations Graham Collins, UCL
Paul Bourke DT211/3 & DT228/3 Team Project Paul Bourke Module Web Page:
BSBPMG502A Manage Project Scope Manage Project Scope Project Scope Processes Part 1 Diploma of Project Management Qualification Code BSB51507 Unit.
Professional Certificate – Managing Public Accounts Committees Ian “Ren” Rennie.
Required Materials / Spring 2009 By Wilmer Arellano.
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
Z26 Project Management Introduction lecture 1 13 th January 2005
CompSci 725 Handout 7: Oral Presentations, Projects and Term Reports Version July 2009 Clark Thomborson University of Auckland.
CSE9020 Schedule, / 1 The Suggested Schedule Week Content/Deliverable 1. 4/3Unit Overview, Project Description, Meetings, Group Formation 2. 11/3Project.
Portfolio Feedback I. The Project Semester 2 April—September This module: the Portfolio -- background research and other preparation Design/Implementation/Experiment/Dissertation.
Moving into Implementation SYSTEMS ANALYSIS AND DESIGN, 6 TH EDITION DENNIS, WIXOM, AND ROTH © 2015 JOHN WILEY & SONS. ALL RIGHTS RESERVED.Roberta M. Roth.
Proposals: three major types  Research Proposal proposes to define problem proposes to define problem  Evaluation Proposal proposes to evaluate solutions.
MEng projects 2013/14 Semester 2 week 10 update Mike Spann Project coordinator
BUS 1040 Project Management Week 10 Let’s get a sense of direction Presented by Professor Fred Pentney.
MSc conference briefing Mike Spann Project coordinator
The Basics of the Effort Certification and Reporting Technology (ECRT) System.
INFO 637Lecture #101 Software Engineering Process II Review INFO 637 Glenn Booker.
Applied Software Project Management
COMP 208/214/215/216 – Lecture 8 Demonstrations and Portfolios.
Professional Certificate in Electoral Processes Understanding and Demonstrating Assessment Criteria Facilitator: Tony Cash.
The Client Proposal: An Overview of Transmittal You’ll need to your proposal to your client The should: – Explain to your.
M253 Team Work in Distributed Environments Week (3) By Dr. Dina Tbaishat.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
The Software Development Process
Supervisor Training On-Campus Student Employment.
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Project Quality Processes C ertificate IV in Project Management
FINALISE YOUR PORTFOLIO [Dear Students, These slides was prepared based on CE1201 Handbook (Latest) given to you at the beginning of Semester. Please read.
Fundamentals of Governance: Parliament and Government Understanding and Demonstrating Assessment Criteria Facilitator: Tony Cash.
Session 2 Part 4. Managing Classroom Assessments Teachers give lots of different assessments, to monitor students progress The testing needs to be carefully.
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Work Plan Development Section A 1.
NEM201 Week 4 Project Plan Create and complete outstanding items. 01. Front Cover 02. Document details 03. Scope Document 04. Technical Design 05. Creative.
Z26 Project Management Presentations Lecture 5b 9 th February 2006 Graham Collins, UCL.
TMP3413 Software Engineering Lab Lab 01: TSPi Tool Support.
AS AN ADMINISTRATOR, I WOULD LIKE THE ABILITY TO LOGIN, SO THAT I CAN SECURELY PERFORM ACTIONS.
L5 Computing Team Project Final Presentation Guidelines.
Unit & District Tools Phase 1
Managing the Project Lifecycle
AARP Foundation Tax-aide
Incident Management: Recording New Incidents User Guide
End of Year Performance Review Meetings and objective setting for 2018/19 This briefing pack is designed to be used by line managers to brief their teams.
Applied Software Project Management
Game Art and Design Unit 2 Lesson 2 Execute the Documents Necessary to Enter the Game Industry International Technology Education Association.
“PERFORM: Let’s Get Started”
QA Reviews Lecture # 6.
Geant4 Documentation Geant4 Workshop 4 October 2002 Dennis Wright
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
Fed-IP Assessor Training: Module 3 Assessing an application for Fed-IP
Presentation transcript:

CSE9020 Wk04 / 1 CSE9020 CASE STUDY Week 4 Notices –The final Friday in Week 13 is the 24th October Questions –Unit Administration - Supervisor’s Roles Project Plan and Reporting Sample Data The Business Case is due this week

CSE9020 Wk04 / 2 CSE9020 Week 4 This week we are going to look (briefly) at –Documents and Standards and –Some Aspects of Quality

CSE9020 Wk04 / 3 CSE9020 CASE STUDY Week1 Room Allocations: Lecture Theatre - S Block, Link Theatre 6.00pm Evening Supervisor Sessions: B Monday - Erling Breaden B Monday - Dempsey Chang B Monday - Santosh Kulkarni B Monday - Joseph All rooms are booked from 7.30pm

CSE9020 Wk04 / 4 CSE9020 Week 4 The Documents you are going to produce are – 1. The Business Case Justification (week 4) – 2. The Methodology and Quality Planning Document (week 6) – 3. Standards to be used in the Preparation of the User Manual (week 7) – 4. The Testing Strategy (week 8) – 5. The Outline of the Acceptance Test Specification (week 10) – 6. The User Manual (week 13)

CSE9020 Wk04 / 5 CSE9020 Week 4 This means (a) you will need to be clear as to the content of each of these documents (b) your reports will need to be informative but precise and concise (short but meaningful) (c) team members will probably be deployed to write parts of the reports (d) the quality reviewer will need to ensure conformity of style and content

CSE9020 Wk04 / 6 CSE9020 Week 4 (e) each member of the team must be aware of the content of the complete document (perhaps a ‘final reading’ session) (f) the final total document must be quality assessed, amended if necessary, and then certified as being the final and complete version

CSE9020 Wk04 / 7 CSE9020 Week 4 General Requirements for Documents 1. Each Document presented is to have –The Name of the Deliverable –The Group Number –The Group Members’ Names –The Group Members’ I.D. Numbers –The Unit Code and Name –The Supervisor’s Name –The Due Date –A Table of Contents –A Short Synopsis (Executive Summary)

CSE9020 Wk04 / 8 CSE9020 Week 4 General Requirements for Documents 2. The documents are to be produced using Word 3. Spell checking is to be used 4. Section numbering is to be used 5. If paragraphing numbering is required, the particular document standard is to be applied. Paragraph numbering is required for all documents which act as source documents for further development (e.g. the Testing Strategy and Acceptance Test Specifications)

CSE9020 Wk04 / 9 CSE9020 Week 4 6. Each submitted document is to have the Quality Reviewer’s certificate included 7. Each submitted document is to be accompanied by a Certificate which indicates the contribution of each member to the document’s content and style 8. The Certificate is to be signed by each member indicating acceptance of time, effort and skill contributions of the other members A copy of the Certificate is available from the web page

CSE9020 Wk04 / 10 CSE9020 Week 4 Project Objectives are to be identified Project Scope is to be identified Project Responsibilities are to be identified (these may alter later as the project progresses and emphases change) Project Risks are to be identified and a brief description of management of the risk included Task Effort Estimates - at his stage these can only be rough assumptions, which will be further refined as the project progresses.

CSE9020 Wk04 / 11 CSE9020 Week 4 Task Effort Estimates (con’t); A spreadsheet is the preferred approach - Microsoft Project would seem to be not necessary (and it is not a project requirement for you to rush off and develop skills in this software) Activities must be assigned to each team member. Later activities will probably have more than 1 member assigned to a task or tasks The base unit of the ‘cost’ or ‘load’ is the person hour

CSE9020 Wk04 / 12 CSE9020 Week 4 As a guide, each phase of the project should consume a maximum 25% of the total effort No phase should be less than 10% of the total effort Quality effort should be in the range of 5% to 15% of the total project effort. You should read the Quality Requirements Statement in the handout. Progress onto the Quality Forms which will then form the basis of the development of the Quality Index

CSE9020 Wk04 / 13 CSE9020 Week 4 Standards These are outlined in the handout papers from Week 1. They are to be followed, and need to be associated with each particular Document. Where the standards are directed at the form of a document, don’t go overboard. The main objective should be to adhere to the standard to produce a valuable, quality document which meets the requirements. You are not in the business of producing TV type products

CSE9020 Wk04 / 14 CSE9020 Week 4 Presentation of Documents: Binding: Documents of 10 pages or less can be stapled once, top left corner. Larger documents should be bound either with a spiral binder or submitted in a two-ring A4 folder. Plastic envelopes or documents wallets are not satisfactory Printing: There is no extra benefit in using colour printing. Variation of font and print style can be used at your discretion.

CSE9020 Wk04 / 15 The Quality Plan

CSE9020 Wk04 / 16 Quality Plan CSE9020 Week 2 Quality Plan Q.What is it ? A.It is the policy and procedures required for control of projects It needs a set of development standards and procedures and clear definition of the deliverable (s) from the stages used in the development Quality is the ability of a product to meet (or to exceed) the agreed/defined user specifications It MUST be an integral part of the product - NOT an add-on

CSE9020 Wk04 / 17 Quality Plan CSE9020 Week 2 Quality Plan This is another way of saying that quality is built into the produce from its initialisation - not as an afterthought A well developed, and enforced, quality plan will focus on the scope of work to be done the deliverables the standards and their use the system environment the various reviews, their outcomes and the effect on the development (extra effort, change of direction..) sign offs required change management (= management of change)

CSE9020 Wk04 / 18 Quality Plan CSE9020 Week 2 Quality Plan Quality is associated and directed at: - Content - Continuity - Accuracy - Presentation - Cohesiveness - Problem Solution

CSE9020 Wk04 / 19 Quality Plan CSE9020 Week 2 Quality Plan You should include some comments about your team’s attitude, strategy, acceptance and recognition of a Quality Plan. How are you going to apply the Quality Plan ? Here are a few suggestions:- A clear, agreed work breakdown No moonlighting or ‘all my own work’ approach Size each task so that it can be understood, assigned, and monitored Make sure each task has a deliverable, and that the deliverable matches the requirement

CSE9020 Wk04 / 20 Quality Plan CSE9020 Week 2 Quality Plan Inspect (and correct where necessary) each deliverable Have walkthroughs - a ‘state of the project’ review Have deliverable test plans - any major points omitted, any errors, any non-alignment with other deliverables ? Listen carefully to your Quality Reviewer - reach agreement by consensus - don’t ‘hang out’.

CSE9020 Wk04 / 21 Quality Plan CSE9020 Week 2 Quality Plan Quality Plan Standards identify the policies and procedures to be adopted and followed by the team. (they may be slightly different from other teams) The Quality Plan probably includes –An Interviewing Standard –Standards for Meetings –User Manual –Testing –Reviews –Project Methodology

CSE9020 Wk04 / 22 Quality Plan CSE9020 Week 2 Quality Plan And equally importantly - There must be some tangible way which ‘proves’ that each standard has been employed The development of the method must be correctly managed Some random thoughts: The team coordinator should produce a statement outlining the need for for both a quality plan, and for its implementation. Each team member should be aware of the responsibility placed on them (and others) and accept and follow all standards. If you are in doubt, ask the Team Co-Ordinator

CSE9020 Wk04 / 23 Quality Plan CSE9020 Week 2 Quality Plan What aspects need standards ? How’s this for starters - –Project Management –Development Development –Testing

CSE9020 Wk04 / 24 Quality Plan CSE9020 Week 2 Quality Plan Quality System : format, structure, procedures, standards Documentation Control : Adherence to the standards Internal Reviews and checks : Detect nonconformity early ? Change standards, procedures Accurate and rapid access to these standards - each team member to have a copy (diskette, CD-Rom - CD Reader ?) Any problems with sending standards via ? Acknowledgement of receipt ?

CSE9020 Wk04 / 25 Quality Plan CSE9020 Week 2 Quality Plan And finally Have you identified the RISKS in your project ? What are they ? Have you prioritised them ? What’s your Plan B if Plan A shows some cracks ?

CSE9020 Wk04 / 26

CSE9020 Wk04 / 27 A Reminder The Methodology and Quality Planning Document is due in Week 6 and The Standards for the User Manual Document is due in Week 7

CSE9020 Wk04 / 28 CSE9020 Week 4 And I’m not too sure if these are authentic … A pilot entered this into the log ‘Something loose in the cockpit’ and the mechanic’s entry was ‘Something tightened in the cockpit’ And this was also noted: ‘Evidence of leak on right main landing gear’ with this fix ‘Evidence removed’

CSE9020 Wk04 / 29 A Slight Variation of Shakespeare’s MACBETH Act 4 When shall we all meet again In thunder, lightning or in rain When the hurlyburly’s done When the battle’s lost and won That will follow the set of sun Where the place ? Upon the heath, but better in the Link There to muse with me, I think Why so ? Week 5 : Renee Gedge/Erling Breaden Conflict and Resolution Week 6 : Erling Breaden Extreme Programming