Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2008 Individual Competition Week 8 Day 2.

Slides:



Advertisements
Similar presentations
2012 Michigan Championship Reminders and Announcements Lawrence Technological University 1.
Advertisements

Design Contest MAE 3. Why a Design Contest Apply Engineering Tools Manage the Design Process Emphasize/Struggle/Rejoice Creativity Using Resources Team.
Engineering H191 - Drafting / CAD Gateway Engineering Education Coalition Lab 5P. 1Autumn Quarter Material Joining and Beam Bending Lab 5.
Recitation Presentation Format. Things to keep in mind  Lab presentations are only about 5 minutes  Will be hard for you to fit in  Presentation will.
Waste Management Challenge 6. The goal of an effective Waste Management company is to collect, sort, and remove waste according to the type of waste.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2006 Individual Competition Week 8 Day 2.
Engineering H193 - Team Project Spring Quarter Gateway Engineering Education Coalition P. 1 Laboratory Quiz & Data Analysis and Presentation for Written.
Engineering H193 - Team Project P. 1 Spring Quarter 2003 Week 8 Day 1 Visual Aids for Oral Presentations Due Today - Outline of Oral Presentation.
Engineering H193 - Team Project Spring Quarter 2005 Gateway Engineering Education Coalition P. 1 Guidelines for Flow Charts and Pseudocode (Performance.
Engineering H193 - Team Project Gateway Engineering Education Coalition Spring Quarter 2006 P. 1 Today and the Week Ahead Week 3 Day 1.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter 2007 Week 8 Day 1 Notes on Individual Competition and Visual.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2008 Robot Programming Tips Week 4 Day 2 By Matt Gates and.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2008 Week 6 Day 1 Lecture On and Examples Of Electrical Circuits.
Engineering H193 - Team Project Spring Quarter 2003 P. 1 Laboratory Quiz, Guidelines for Final Report Draft, Performance Test on Friday Week 5 Day 2.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2007 Competition Week Week 9 Day 1.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2007 Individual Competition Week 8 Day 2.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2007 Guidelines for Flow Charts and Pseudocode Week 5 Day 1.
Engineering H193 - Team Project Gateway Engineering Education Coalition Spring Quarter 2005 P. 1 Drive Train Calculations Week 3 Day 1.
Engineering H192 - Computer Programming The Ohio State University Gateway Engineering Education Coalition Lect 30P. 1Winter Quarter ENG H193 & H193A Projects.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2005 Last Day Prizes Evaluation Turn in Stuff Picnic from 5.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter Week 8 Day 1 Visual Aids for Oral Presentations.
Engineering H193 - Team Project Spring Quarter 2003 P. 1 Performance Test 2 Week 4 Day 3.
Engineering H193 - Team Project Gateway Engineering Education Coalition Spring Quarter 2004 P. 1 Drive Train Calculations Week 3 Day 1.
Engineering H193A - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter 2004 Engineering H193A Continue Cell Adhesion (Lab 3) Complete.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2007 Lecture on Oral Presentations Week 7 Day 1.
Engineering H193 - Team Project Spring Quarter 2005 Gateway Engineering Education Coalition P. 1 Laboratory Quiz & Data Analysis and Presentation for Written.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter Individual Competition Week 8 Day 2.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2007 Progress Reports Week 4 Day 1.
Engineering H193 - Team Project Gateway Engineering Education Coalition Final Report – An Overview Week 4 Day 2.
Engineering H193 - Team Project Gateway Engineering Education Coalition Performance Review Week 3 Day 3.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2005 Final Report – An Overview Week 4 Day 2.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2008 Laboratory Quiz & Data Analysis and Presentation for Written.
Test 1 & 2 information Econ 130 Spring Information about Test 1 Number of students taking test: 41 Points possible: 50 Highest score: 47 (2 students)
Engineering H193 - Team Project Spring Quarter2005 Gateway Engineering Education Coalition P. 1 Lecture on Oral Presentations Week 7 Day 1.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter Week 6 Day 2 Lecture on and Examples of Electrical Circuits.
Spring 2009 ME 481 Laboratory Week #1 Final Design Presentations Mechanical Engineering California Polytechnic State University San Luis Obispo ME481 Senior.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Project Management Week 2 Day 2.
Engineering H191 - Drafting / CAD Gateway Engineering Education Coalition Lab 1P. 1Autumn Quarter Marble Carrier Lab 1.
Engineering H192 - Computer Programming Gateway Engineering Education Coalition Lect 30P. 1Winter Quarter H193 Project Lecture 30.
Engineering H193 - Team Project Spring Quarter Gateway Engineering Education Coalition P. 1 Data Analysis and Presentation for Written and Oral Reports.
Time for another activity: Red Chile, Green Chile.
1 Introduction to Engineering Second Semester Overview Agenda Team Assignments and Information Exchange Course Overview.
Robotics Kickoff Today : 1. Form teams 2. Go over Lego Golf Rules 3. Discuss Presentation due next week 4. Find and re-distribute Lego kits
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter Work Day Check Robot Against Budget Work on Oral Report Work.
Engineering H191 - Drafting / CAD Gateway Engineering Education Coalition Lect 25P. 1Autumn Quarter Reading Working Drawings Lecture 25.
Introduction to Robotics Lab 10 – Robot Sorter Felix Duvallet, Matt Faria.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Engineering H193 Course Introduction Team Assignments Team Working.
WHAT PAYS MORE WHY COLLEGE. WEEKLY EARNINGS & UNEMPLOYMENT.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Samples from Team Working Agreements Design Process – Mockups.
Discrete Structures Counting (Ch. 6)
Welcome to Science 8 Team 8J Mr. Hartman
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter Final Report – An Overview Week 4 Day 2.
Engineering H College of Engineering Engineering Education Innovation Center 2014 Robot Scenario Introduction Rev: , MEIRobot Scenario1.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter Observations from the Individual Competition Week 8 Day 3.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter Last Day of Class – Spring Quarter Check Grades Turn in Project.
Engineering H193 - Team Project Spring Quarter Gateway Engineering Education Coalition P. 1 Guidelines for Flow Charts and Pseudocode Week 5 Day 1.
Student Defined Lab Demo Date: April 29, 2009 Robot Exchange.
Engineering H193 - Team Project Spring Quarter Gateway Engineering Education Coalition P. 1 Progress Reports Week 4 Day 1.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Lab Day – Controller Lab 1 Brief Follow-up from Wednesday Grading.
Engineering H193 - Team Project Spring Quarter Gateway Engineering Education Coalition P. 1 Performance Test 4 and Team Review Week 6 Day 3.
Visual Aids for Oral Presentations
Individual Competition
Marble Carrier Lab 1 Instructor:
Problem Solving Lab – Part C
International Baccalaureate Middle Years Program Application Process
SPHERO SCORING GUIDE.
HOMEWORK 8 PhD Course.
Exam Instructions (1) 1.Exam week for Nursing in Therapy is from 21 January, 2019 to 25 January, Go to: (Moodle). 3.Choose a course.
Directions to play game
Make Homework Count and Gain Back Minutes a Day!
Presentation transcript:

Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2008 Individual Competition Week 8 Day 2

Engineering H193 - Team Project Gateway Engineering Education Coalition P. 2 Spring Quarter 2008 Procedure Each Robot will get three runs – each run will be scored according to the points distribution in the Design Specifications The highest score on an individual run will be recorded for grade There will be a random selection of starting location The first run will be random The second run will be faculty choice The third run will be "team choice"

Engineering H193 - Team Project Gateway Engineering Education Coalition P. 3 Spring Quarter 2008 Individual Competition Three runs: Run 1 – Random selection of – Starting location, ICECORE color (i.e., RF code), ICECORE location, – as will be done during final competition. Run 2 – Faculty/Staff Pick of – Starting location, ICECORE color (i.e., RF code), ICECORE location. Run 3 – Team chooses – Starting location, ICECORE color (i.e., RF code), ICECORE location.

Engineering H193 - Team Project Gateway Engineering Education Coalition P. 4 Spring Quarter 2008 Rules for the Day The robot must fit in the 9” x 9” box The robot course will not be open for practice When your robot is called, you will have two minutes to present the robot at the course You will then have one minute to set your robot on the course and prepare it for the start The time limit for each run is 2 minutes When you touch the robot, the run is over There is no open lab this evening