PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays1 IBDR Hilmar Richter ANTEC-GmbH Germany Günter Bollmann, Peter Dinges, Otto Frenzl, Heidrun Köppen,

Slides:



Advertisements
Similar presentations
Melting Probe IWF-EXP/ÖAW GRAZ Size: 40 x 40 x 195 mm Mass w/o electronics Calculated: 450g Measured: 350g, 3m tether Main Components Cable.
Advertisements

PACS IHDR 12/13 Nov 2003 Overview and Mechanical/Thermal IFs to FPU 1 MPE J. Schubert PACS IHDR.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Experiments on Solder Column Interposer: cryogenic cleaning and local laser reflow Irving HAMON, Electronic Materials and Assembly Processes for Space.
Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
PACS IBDR 27/28 Feb 2002 PACS Cryo Harness1 U.Grözinger, D.Lemke, R.Hofferbert Max-Planck-Institut für Astronomie Heidelberg Based on input data from CSL,
PACS IIDR 01/02 Mar 2001 Photoconductor Detector Arrays1 Photoconductor Detector Arrays for PAC S IIDR - ESTEC Stefan Kraft ANTEC-GmbH Germany Günter.
PACS Structure Analysis1 PACS IBDR 27/28 Feb 2002 PACS Housing: Structure Analysis Dr. G. Wanderer CASE GmbH.
BINP level meter for cold liquids The method of measurements: change of the capacitance as function of a level of a liquid Originally designed for LN 2.
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
PACS IBDR 27/28 Feb 2002 PACS CRE1 PACS CRE development Ybe Creten, Patrick Merken, Jan Putzeys, Vic Fonderie, Chris Van Hoof IMEC.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards and FPU Harness Concept R. Graue, D. Kampf Kayser-Threde.
PACS IBDR 27/28 Feb 2002 PACS Photometer1 PACS PHOTOMETER J.L Auguères L.Rodriguez CEA/DSM/DAPNIA Service d’Astrophysique.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
PACS IBDR 27/28 Feb 2002 PA/QA Status1 PA/QA STATUS MPE /PACS/IGL.
PACS IHDR 12/13 Nov 2003 PACS FPU FPU Structure, Baffle and Straylight R. Graue, D. Kampf Kayser-Threde.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
PACS IBDR, Garching 27/28 Feb 2002 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause J. Katzer (ZEISS) Max-Planck-Institut für Astronomie, Heidelberg.
M.Oriunno, SLAC Stave cable and module options. M.Oriunno, SLAC Background - module The IBL electrical unit for data output is a single chip The use of.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt.
PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array1/16 Ch. Hartinger / L. Barl Ge:Ga Detector Arrays.
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/ SPIRE & PACS SORPTION COOLERS.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
Test Readiness Review 23 October 2003 CRAL - LYON.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
AMS-RICH Detector. J. Berdugo – CIEMAT (Madrid, Spain) 1 AMS-02 Phase II Flight Safety Review AMS Ring Imaging CHerenkov PURPOSE: 1.Precise measurement.
PACS IIDR 01/02 Mar 2001 PACS Cryo Harness1 U.Grözinger, D.Lemke, R. Hofferbert Max-Planck-Institut für Astronomie Heidelberg Based on input data from.
PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule1 Otto H. Bauer MPE Garching.
The HCAL barrel absorber structure
NIRSpec IFU Eric Prieto Final Presentation Definition Phase May, 11th – ESTEC.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
Possible types of module Si/W CALORIMETER CONCEPT Si/W CALORIMETER CONCEPT G.Bashindzhagyan Moscow State University June 2002 Internal structure (not in.
1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
PACS 12/13 November 2003 PACS PA/QA IHDR1 PACS PA / QA STATUS Documentation overview Cooperation with PA/QA responsibles -outlook- NCR Status System documents.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
Another Modular Focal Plane: Part 1 – Sub-modules Bruce C. Bigelow University of Michigan Department of Physics 5/17/04.
IFU Management Meeting LAM – 15/10/04. Introduction (olf)
BSMIan Pain, UK ATC SPIRE Instrument Intermediate Design Review April 23, RAL 1 Beam Steering Mirror Sub-System IIDR Overview Ian Pain UK ATC Colin.
Wire and Cathode Planes - Current Concept (work in progress) PPD Internal Review – 2 nd Part April 19 th, 2005 Rafael Silva FLARE Fermilab Liquid Argon.
GWADW2011 Elba/Italy, 23/May/2011 N. KIMURA and Y. SAKAKIBARA Present Design of LCGT Cryogenic Payload - Status of Cryogenic Design - N. KIMURA*, Y. SAKAKIBARA**,
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Progress with System Integration of the CBM Silicon Tracking Detector
LumiCal mechanical design, integration with LDC and laser alignment
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
First Stage Cryogenic IF Amplifier
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Presentation transcript:

PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays1 IBDR Hilmar Richter ANTEC-GmbH Germany Günter Bollmann, Peter Dinges, Otto Frenzl, Heidrun Köppen, Heribert Krüger, Claudia Popp

PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays2 Overview Modul / Array Interfaces –Optical Interface –Electrical Interface Design Implications on Arrays –Detector Stack –Thermal Budget –Cryo Cycling and Vibrational Load Achieved Performance –Cut-off Wavelengths –Bias dependency PA / QA Activities: Flow Plan Procurement Summary

PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays3 Optical Interface of the “Red” Array Radial arrangement of 25 high stress modules in groups of 5 modules. The center of the radial arragement is 240 mm in front of the fore optics in the plane of the pupil.

PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays4 Electrical Interface Interface design FEE and harness substrate are supported by kapton tubes in order to reduce thermal load to the module All wires from interface parts to the module are stainless steel, wires between interface parts are gold wires The nano connector of the pigtail harness is glued to the harness substrate Thermal loads of the interface parts flow through the cooling strap to the 4 K level

PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays5 Detector Stack in the Cavity and Final Bias Design Ball segment Detector contact Ge:Ga crystal Detector contact Gold wire 25 µm Insulator Final design Bias concept has been changed to prevent grounding of detectors by short circuit –Contact diameter decreased at the ball segment side to prevent grounding of the signal line (2) –Contact diameter increased at the ground side (this contact is grounded directly to the module (1)  Slits reduced from µm to µm and therefore less cross talk 1 2 Detector Stack

PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays6 Thermal Budget 4 K P = 375 µW 4 P = 624 µW 11 µW 202 µW 162 µW 7 µW 134 µW 108 µW P = 249 µW 25 High Stress Modules 25 Low Stress Modules 2.5 K 1.7 K 4 K 16 Detector Wires (Steel) 4 Long FEE + 2 Long Harness Posts (Kapton) 2 Short Harness Posts (Kapton)

PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays7 Cryo Cycling and Vibration Load Slit of 0.2 mm between kapton tube and support part (no gluing) at the free bearing support posts compensates shrinkage of different materials (module, FEE / harness substrate, kapton tube, etc.) during cool-down. After cool-down: slit = mm. Static tests at LN 2 temperatures prove: Kapton tubes withstand deflections of 0.15 mm (0.12 mm) perpendicular (parallel) to the substrate plane. The applied forces correspond to accelerations of 110 g. Above support post design passed cryo cycling and vibration tests with qualification load levels. Free bearing support post Slit

PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays8 Specification Cut-off Wavelength Specification high stress module: CW > mV 30 mV

PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays9 Specification Cut-off Wavelength Specification low stress module:  CW < mV

PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays10 PA / QA Activities: Flow Plan KIP Final check of the completed module before shipping Cleaning and incoming inspection of all parts Detector stack assembly and RSR measurement. KIP: Check of detector stack KIP Final cleaning of the module and check with UV light Preparation of FEE / harness substrate support posts Gluing of the pigtail harness to the harness substrate and implementation of connector saver and short circuit connector Integration of FEE / harness substrate, wiring and fixing of FO

PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays11 Procurement / Assembling Status of parts procurement for the integration of QM modules - Delivery of the Gore cables Tecnologica announced connector savers and short circuit connectors for Delivery of FEE and harness substrates PO for the pigtail harness from Cannon placed (delivery time 12 weeks) Routinely going on assembly of FM modules at Antec Time critical: Procurement of pigtail harness

PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays12 Summary Interfaces to MPE housing, KT board and IMEC FEE and harness substrate defined Module design finished (specifications fulfilled) Procurement of integration parts initiated and delivery dates fixed