Pedestal Correction in action (but still during shutdown) Philippe Laurens Michigan State University 16-Oct-2007.

Slides:



Advertisements
Similar presentations
18 Bit ADC Status Collaboration meeting May 18, 2007.
Advertisements

Sound Card Calibration. Determine computer audio device. Determine computer audio device. In XP, go to Control Panel – Sounds & Audio Devices – Audio.
Follow The Guidelines Introductory Presentation. Opening Activity Make a prediction about how light sensors will use thresholds. Keep in mind: We used.
Fingerprint Minutiae Matching Algorithm using Distance Histogram of Neighborhood Presented By: Neeraj Sharma M.S. student, Dongseo University, Pusan South.
Zero Energy Response of ADF Raw ADC and ADF Output Et & New “36 LiveX sampling mode” for Find_DAC Philippe Laurens MSU Sept 2006 (rev 20-sept-2006)
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
1 Calice Meeting 20/9/06David Ward What did we learn from DESY 2005 run? DESY run May CERN run August Data/MC comparisons for ECAL.
Pedestal Tracking in action a.k.a. Active Stabilization of L1Cal Trigger Tower Zero Energy Response Philippe Laurens Michigan State University 09-Nov-2007.
L1CAL Online Software Philippe Laurens 31-May-2005.
L1CAL Online Control System Philippe Laurens 26-Aug-2005.
1Calice-UK Cambridge 9/9/05D.R. Ward David Ward Compare Feb’05 DESY data with Geant4 and Geant3 Monte Carlos. Work in progress – no definitive conclusions.
Looking for effects of PDT state changes on Pedestals (or Pedestal Adjustments) during 14-Jan Feb-2008.
Saclay, 04 / 11 / 2002 E. Perez 1 Simulation of the performances of the upgraded L1Cal  Short reminder  Performances (jets) (see Jovan’s talk for electron.
Pedestal Studies (continued) …Individual Towers Philippe Laurens Michigan State 02-Oct-2007.
Vertex 2002 Kailua-Kona The heavy ionising particles in CMS tracker Hip effect description. The PSI beam test. Measurements of hip rate and induced dead.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
Online Monitoring of L1CT in Run IIa bonus: experience from Run I Philippe Laurens 20-Feb-2003.
L1Cal Pulser Diagnostics GUI.. What it is for and why do we need it. See a beautiful Bob’s presentation. –To carry out diagnostics for Run2A trigger (especially.
GLAST LAT Project Instrument Analysis Meeting– Dec 9, 2005 Takuya Kawamoto, TKR Noisy Strip determination 1 Noisy Strip determination Takuya Kawamoto (Hiroshima.
Pulser Tool Peter Renkel, SMU. Just a reminder. Need to have some tool for L1Cal diagnostics and debugging, when there is NO beam. What we want to get.
L1Cal Pedestal Studies Sabine Lammers Philippe Laurens 26-Sep-2006.
H. EvansRun IIb L1Cal Meeting: 1-May-031 Goals of the Summer Integration Test Summer Integration Schedule –16-Jul-03 – 8-Oct-03 Test Infrastructure –what.
DØ L1Cal Trigger 10-th INTERNATIONAL CONFERENCE ON INSTRUMENTATION FOR COLLIDING BEAM PHYSICS Budker Institute of Nuclear Physics Siberian Branch of Russian.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
MINIDRFIT BEAM TEST APPLY IN-LAB UNIVERSAL CORRECTION EIC Tracking Meeting Oct. 27, 2013 B.Azmoun, M.Phipps, BNL.
MineralScan Fill Level Signal Examples & Explanations - RNMC Introduction The MineralScan MillSlicer system normally consists of two fixed vibration sensors.
Joint Commissioning (2) Commissioning plan Gene Flanagan Purdue University.
Experimental determination of motor model parameters ETEC6419.
Presentation Title Spike problem.
Gauge Operation and Software by Scott A. Ager. Computer Recommendations 750 MHz Pentium III 64 Meg SRAM 40 Gig Hard Drive 1024 x 768 graphics CD Writer.
Summary of FMS/Jet Meetings July FMS Meeting: 7/21/14 Discussion of progress refurbishing the FMS – First delivery of ~40-50 finished bases from.
Cluster Finder Report Laura Sartori (INFN Pisa) For the L2Cal Team Chicago, Fermilab, Madrid, Padova, Penn, Pisa, Purdue.
Program Requirements Alternative Energy Supplement Design Requirements Problem Statement Testing Economic Analysis Energy System Program Requirements Calculate.
The SuperCDMS-SNOLAB Trigger System Report of the Trigger Task Force Scott Oser (co-chair), Dave Toback (co-chair), Dan Bauer, Anders Borgland, Ray Bunker,
1 Long-Run Costs and Output Decisions Chapter 9. 2 LONG-RUN COSTS AND OUTPUT DECISIONS We begin our discussion of the long run by looking at firms in.
Jin Huang M.I.T. For Transversity Analysis Meeting Jun 18, JLab.
8 | Perfect Competition Perfect Competition and Why It Matters How Perfectly Competitive Firms Make Output Decisions Entry and Exit Decisions in the Long.
Nirmalya Parua March 17, 2003 The RunII Calorimeter Nirmalya Parua (For the Calorimeter Group) Shifter’s Tutorial March 17, 2003  Overview Of the D0 Calorimeter.
1 L1CAL for DAQ Shifter By Selcuk Cihangir 3/20/2007 Representing L1CAL group (slides from many people)
New L2cal hardware and CPU timing Laura Sartori. - System overview - Hardware Configuration: a set of Pulsar boards receives, preprocess and merges the.
LHCb VELO Upgrade Strip Chip Option: Data Processing Algorithms Giulio Forcolin, Abdul Afandi, Chris Parkes, Tomasz Szumlak* * AGH-Krakow Part I: LCMS.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
EM resolutions from low to high energy Jan Stark, LPSC Grenoble CAT Force meeting, May 13 th, 2003.
Damping of Coupled-bunch Oscillations with Sub-harmonic RF Voltage? 1 H. Damerau LIU-PS Working Group Meeting 4 March 2014.
The SuperCDMS-SNOLAB Trigger System Report of the Trigger Task Force Scott Oser (co-chair), Dave Toback (co-chair), Dan Bauer, Anders Borgland, Ray Bunker,
DN/d  and dN/dp T analysis status Gabor Veres for the working group QCD meeting, Jan 12, 2010.
AMS Software Review ACC DAQ Monitoring Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, KSC, 31st January 2011.
Overview of Ramp Development Giulio Stancari E-835 Collaboration Meeting Torino, May
What is the time estimated to change the energy and re-establish stable operation by steps of ~1% (threshold scan), a few%, or more than 10%? Comments.
22/06/2016James Leaver Current FED Tester Status.
Calorimeter Status Electronics Installation and Commissioning
BioTector Diagnostic Download
Get project folder.
Clocks A clock is a free-running signal with a cycle time.
Follow The Guidelines.
Principles of Microeconomics Chapter 14
Beam Sync Output - fiber, one microsecond pulse of Beam Sync Input
Tilecal Pion Response and Energy Resolution
What is the average rate of change of the function f (x) = 8 x - 7 between x = 6 and x = 7? Select the correct answer:
VERTICAL LINE TEST GRAPHS can represent functions.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Progress on L1Cal at Nevis
Biological Neuron Cell body Dendrites Axon Impulses Synapses
BESIII EMC electronics
Introductory Presentation
Introductory Presentation
VERTICAL LINE TEST GRAPHS can represent functions.
Programming with data Lecture 3
X Y Relation (a set of ordered pairs) x y x y ( , ) x y Mapping
Flowchart Symbols What do these mean:.
Presentation transcript:

Pedestal Correction in action (but still during shutdown) Philippe Laurens Michigan State University 16-Oct-2007

Active Control of Trigger Tower Zero Energy Response L1Cal TCC can now automatically track and correct the Zero Energy Response for the Transverse Energy of each Trigger Tower, at the output from the ADF cards, i.e. the input to the TAB Cards, to remain at the design value of 8 counts = 0 GeV. –For each Trigger Tower, the Zero Energy Response Drift is measured from the average of 1000 samples of Live Crossing Energy. –If the measured drift is below a programmed threshold (0.5 counts) TCC immediately applies 50% of the correction needed to correct the measured drift. –If the measured drift is above the threshold, TCC does not make any correction and waits until the next sample to decide if this is a spike or a step change. At the next snapshot, and if this was a spike, do nothing and return to the 50% correction mode for future correction cycles. If this is a step, do the full correction instantly and return to the 50% method for future corrections. –These decisions are taken on a tower by tower basis.

Comparison of pedestal stability with/without active correction Examine a few of the quiet, and some of the noisiest Trigger Towers and compare: –Store 5435 (17&18-May-2007) –No beam period 5438 to 5443 (19-May-2007) –Active correction during shutdown 09-Oct-2007 –Active correction during shutdown 10-Oct-2007

Averages of all Trigger Towers Physics Running Between Stores (Old) (Current)  StdDev of Averages of all TTs is ~0 (with spikes)  and Average of Abs(Drift) is ~0 Physics Running Between Stores

Individual Towers: EM_TT(- 2, 5) (Current) Physics Store Between Stores (Old) (Current)

EM_TT(- 2, 5) Corresponding Control Values

EM_TT(+ 8,26)

HD_TT(- 2, 5)

HD_TT(- 6,26)

HD_TT(- 8, 9)

Looking back at oversampled data 2006 studies for HD_TT(- 8, 9)  ADF captures 4 sampling points per tick 1:159  Each point in the graph is the average (or StdDev) of 1000 samples

HD_TT(- 8,26)

HD_TT(- 8,26) oversampled data

….

EM_TT(- 7,12)

EM_TT(- 8, 9)

EM_TT(+ 1, 1)

EM_TT(+ 7,27)

HD_TT(+ 1, 1)

HD_TT(- 7,12)

HD_TT(- 7,26)

HD_TT(+ 6,26)

HD_TT(+ 7,27)

HD_TT(+10,16)