GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section 4.7 - Mechanical Systems Radiator and X-LAT Assy1 GLAST Large Area Telescope:

Slides:



Advertisements
Similar presentations
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 5 of 12 Subsystem Acceptance 1 GLAST Large Area Telescope Pre-Environmental.
Advertisements

GLAST LAT ProjectLAT Mgr’s meeting July 17-18, LAT Planning Meeting Mechanical Systems Marc Campell.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator Assy1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectLAT Mgr’s Meeting October 13, LAT Planning Meeting Mechanical/Thermal Systems October 2004 Marc Campell.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 1.1 Management 1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectLAT Mgr’s Meeting November 17, LAT Planning Meeting Mechanical/Thermal Systems November 2004 Marc Campell.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectLAT Mgr’s Meeting LAT Planning Meeting Mechanical/Thermal Systems March 17, 2005 Marc Campell.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 13 Mechanical Systems1 GLAST Large Area Telescope: Mechanical Systems WBS:
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems X-LAT Assy1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section 13 Mechanical Subsystem1 GLAST Large Area Telescope: Mechanical Systems WBS:
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
LAT-PR Section 55-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Thermal-Vacuum Testing LAT Environmental Test.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section 4.4 Heat Pipe Design and Analysis1 GLAST Large Area Telescope: Mechanical.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Prat CNRS/IN2P3-LLR Ecole Polytechnique GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator Assy1 GLAST Large Area Telescope: Mechanical.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 2.2 Budgets & Metrics 1 GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
LAT MPSRLAT Structural Analysis-1 GLAST LAT ProjectNov-04 Structural Analysis: Completed Tasks LAT System Level –LAT Environmental TIM Support A success.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 1 GLAST Large Area Telescope:
AMS TIM January, Houston 1 AMS 02 –Thermal Control System Design AMS Thermal Control System (TCS): A Status Report Group Leaders: Drj Sun – AIDC,
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration with PFP, Qualification, ATLO 2011 March 28 Dave Curtis.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 1 Presentation 1 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review W.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) Thermal Analysis Christine Cottingham LM/GSFC 545 Hume Peabody GSFC.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
FIELDS MEP Thermal Vacuum Cycling iPER
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
Gayle K. Martin November 14, 2016
GLAST Large Area Telescope:
Capitalization style for Presentation Title is “Title Case”
FIELDS SCM Thermal iPER
LAT Requirements Verification in TVAC
GLAST Large Area Telescope
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Integration and Test Organization Chart
GLAST Large Area Telescope:
Mechanical/Thermal Systems
GLAST Large Area Telescope
Introduction and Overview
GLAST Large Area Telescope:
Design Integration and Analysis
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy1 GLAST Large Area Telescope: Mechanical Systems Peer Review 27 March 2003 Section 4.7 Fabrication & Verification Radiator, XLAT, Heatpipes Brenda Costanzo Lockheed Martin System Engineer Gamma-ray Large Area Space Telescope

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy2 Radiator Fabrication (1 of 2) Obtain Facesheet Material Shear N/C Machine Inspect Clean, Etch & Prime Bond Pipes To OB Facesheet Inspect Thermal Bond Visual Fit Check Core Machine Transfer Datums Assemble Panel and Bond Verify Cure Profile Process Samples To Lab CMM Inspect Geometry Inspect Holes w/ Pins Prep and Install Inserts & Spools Inspect Inserts & Spools Bond IB Doublers RT Cure Bond OB Doublers AC Cure Verify Cure Profile Inspect Doublers Bond Top Edge Closure Obtain Remaining Flight Materials Inspect Verify Flight Materials Log Flight Materials A Inspection/Test Manufacturing Purchasing

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy3 Radiator Fabrication (2 of 2) Notes 1)All panel moves require: inspection documentation of panel for damage; packaging for transport; and flight approved move procedures. 2)No outside storage. 3)Qualified flight transportation personnel and equipment. Apply Edge Closure Tape Inspect Bushings Install Reservoir Bushings Structural Testing Apply Thermal Blanket Apply Blanket Velcro Final Cosmetic Damage Map Thermal Testing Inspect Bushings Fit Check Reservoir Bushings Inspect Reservoir Supports Bond Reservoir Supports Machine Bushings A

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy4 M & P Plan, EEE Parts M & P Plan submitted to SLAC (GLS , dated 1 Feb 2003) EEE Parts –Heaters: Minco Kapton Foil Heaters per GSFC S-311-P-079 –Thermistors: YSI Thermistors per GSFC S-311-P-18 –RTDs: Rosemount PRT per GSFC S-311 –Solid State Thermostats: Micropac 52372”O” Submitted to SLAC for approval Nov 2002

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy5 Overall Test Philosophy Tests are broken into three categories –In process –Assembly –Joint assembly Benchmark tests will be performed to assess any changes due to environmental testing –IR Heat pipe signature –Low level sine vibration Test plan is document GLS All testing will have procedures written prior to commencement Inspection occurs throughout the testing at points specified in the procedure Flash reports will be written within 3 working days of test completion Full reports will be written within 30 days of test completion or by pre-ship review, whichever is earlier

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy6 Overall Test Flow Heat Pipe In-Process Tests X-LAT Assy Acceptance Tests Integrated Radiator & X- LAT Assy Thermal Test Delivery In- Place to SLAC Heat Pipe Acceptance Tests X-LAT In-Process Tests VCHPs Only X-LAT CCHPs Only Radiator Acceptance Tests Radiator In-Process Tests TCS Thermal Test X-LAT Plate Qualification Tests Delivery to SLAC

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy7 Heat Pipe In-Process and Acceptance Testing In process testing –Verification of material certifications –Inspection of physical dimensions –Verification that LM procedures are followed Acceptance testing CCHP VCHP Integrate into Next Higher Assembly Heat Transport Test Non-Condensable Gas Test Proof Pressure Test HP Assy Proof Pressure Test Heat Transport Test Reservoir Proof Pressure Test Gas Charge Test

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy8 Radiator and X-LAT Panel In-Process Testing Radiator and X-LAT Panels –Verification of material certifications –Inspection of physical dimensions –Verification the LM procedures are followed Radiator Panels X-LAT Panels –Visual inspection of pipe/panel bonds Flatwise Tensile Test Visual Inspection of Pipe/Panel Bonds Lap Shear Test Bulk Load Test Insert Pull Test Radiator Assembly Acceptance Testing

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy9 Radiator Mechanical Acceptance Tests Test configuration –Each radiator panel assembly tested separately Test flow Vibration Testing Pre- Vibration IR Signature Low Level Sine Survey Sine Vibration Limit Load Test Acoustic Vibration Post- Vibration IR Signature Low Level Sine Survey Mass Properties X-LAT/Radiator Assy Thermal Testing Radiated Emissions Conducted Emissions Radiated Susceptibility Conducted Susceptibility EMI Testing

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy10 X-LAT Plate Qualification Testing Test configuration –One protoqual X-LAT plate assembly Test flow Mass Properties Deliver to SLAC Vibration Testing Low Level Sine Survey Sine Vibration (TBR) Static Load Test Acoustic Vibration (TBR) Low Level Sine Survey Random Vibration (TBR) Thermal Cycle 2 Hot Thermal Balance Cold Thermal Balance Thermal Cycle 4 Cold Thermal Cycle Hot Thermal Balance Thermal Cycle 1Thermal Cycle 3 Thermal Testing

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy11 X-LAT Assy Mechanical Acceptance Tests Test configuration –X-LAT Assy (two X-LAT panels and one mid-plate) Test flow Pre-Vibration IR Signature Low Level Sine Survey Vibration Testing Sine Vibration (TBR) Static Load Test Acoustic Vibration (TBR) Post-Vibration IR Signature Low Level Sine Survey Mass Properties X-LAT/Radiator Assy Thermal Testing Random Vibration (TBR)

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy12 X-LAT/Radiator Assy Thermal Testing Combining the X-LAT and Radiator Assy thermal testing –Cost savings (1 test versus 2 tests) –Minimizes STE –Tests X-LAT pipe to Radiator pipe thermal joint Hardware configuration –X-LAT Assy –Radiator Assy –Heater plate to introduce heat into the system –Lab electronics to control VCHPs Hardware orientation –+X side up –Level within 0.10”

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy13 Test Orientation +Z +Y Gravity is Into the Page Cold Wall MLI Blanket Flight Radiators (2) +X +Y Gravity is Down Flight X-LAT Assy Cold Wall Flight Radiators (2) MLI Blanket NO SCALE Flight X-LAT Assy Heater Plate

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy14 X-LAT/Radiator Assy Thermal Test Flow Pre-Cycling Functional Test Pump Down Chamber Thermal Cycle 1 Bakeout / Hot Survival Hot Temperature Turn-On Cold Survival Cold Temperature Turn-On Thermal Cycle 3 Cold Balance Point Thermal Cycle 2 Hot Balance Point Thermal Cycle 4 Hot Balance Point Cold Portion of Thermal Cycle Post-Cycling Functional Test Delivery In- Place to SLAC TCS Thermal Testing IR Signature

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy15 TCS Thermal Testing Hardware Configuration –Radiator Assy –X-LAT Assy –Downspout heat pipes (TBR) –LAT mass simulator Test Objective –Verify VCHP reservoir heater operational algorithm Test Flow Bakeout / Hot Survival Hot Temperature Turn-On Pre-Cycling Functional Test Pump Down Chamber Cold Balance Point Hot Balance Point Post-Cycling Functional Test Cold Survival Cold Temperature Turn-On Hot Balance Point Cold Temperature Turn-Off Repressurize Chamber

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy16 Further Work Determine appropriate structural testing for Radiator and X-LAT Assemblies Determine X-LAT Assy and Radiator Assy configuration for thermal testing (together or separate) –Design STE (Special Test Equipment) and GSE (Ground Support Equipment) Determine if TCS thermal test objective can be achieved during XLAT / Radiator Assy thermal test –Determine what additional hardware will be available –If performing separate TCS test, design LAT mass simulator Write test procedures