Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall Week 4 End of Day Presentation:  Design Review.

Slides:



Advertisements
Similar presentations
Physiological Simulator
Advertisements

Proposal Analysis Review NMSGC Student Launch University/Institution Team Members Date.
P08026: Modular Hemodynamic Flow Simulator Jason Brown Mechanical Engineering Amanda Clark Mechanical Engineering Matthew Hicks Electrical Engineering.
MSD 11209: WOCCS: Long-Range RF Module Meet the Team Danelle Grabski- Electrical Engineering Jacky Ng- Electrical Engineering Josh Doolin- Electrical.
System Level Design Review P10054 October 9, 2009 Monitoring Device for Human Smoking Behavior.
Mobile Environment Chamber Internal/External Search Team members: Duc Tran Tuan Ngo Giang Nguyen Peter Elab Thien Nguyen The Duong Advisor: Dr. Mark Weislogel.
6/10/2015SYSTEMS LEVEL DESIGN REVIEW 1 HEALTH-MONITORING OF A RECIPROCATING COMPRESSOR MSD1 – P12453 SYSTEMS LEVEL DESIGN REVIEW.
Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall Week 3:  Progress Update  Specifications 
Team P08404: Team Members: Ben Johns (ME) Adam Yeager (ME) Brian T Moses (ME) Seby Kottackal (ME) Greg Tauer (ISE) Faculty Guide: Dr. Stevens Review Date:
Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall Week 4 Presentation:  Selected Concepts  Engineering.
Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall Week 2 Presentation:  Work Breakdown Structure.
Team Name Conceptual Design Review University/Institution Team Members Date.
Risk Scoring Parameters Severity (choose most severe) Risk Ranking Likelihood ProductProjectInjury 3 Highly Likely > 50% Complete product failure, does.
Reservoir LVAD PVS / Booster Physiological Simulator Valve Automated Resistance Valve Three Loops Blood Extraction Standard Pressure Sensor Temperature.
06411 Micro Nucleating Bubble Engine Team Members Steven Nathenson Joseph Pawelski Joaquin Pelaez Andrew Pionessa Brian Thomson Project Sponsors Dr. Crassidis.
Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall Week 2 – End Of Day:  Progress Update  Concept.
Ventricle Chamber Valve Imaging Chamber ECG Machine Aortic Compliance Chamber Buffer Chamber Secondary Compliance Chamber Flow Meter Pressure Sensors DAQ.
Jon Klein Project Manager Kyle Menges Technical Lead Priya Narasimhan Electrical Engineer Julie Coggshal Industrial and Systems Engineer Christine Lowry.
The objective of this project was to design a dynamic similarity test rig to replicate the operating conditions of the main crank bearing in the Dresser-Rand.
Mechanical Engineers: Brian Church Tyler Breitung Michael Oplinger Electrical Engineers: Anthony Salmin Ross Bluth Stephen Mroz Sponsor: Dr. Roman Press.
MSD P15280 RIT HOT WHEELZ TEST BENCH. AGENDA ❖ Review Problem Definition Material ❖ Review System Design Material ❖ Sub-System Design Review ▪Motor.
GARLOCK EXPANSION JOINT (MSDI-P13671) Systems Design Review January 11 th, 2013 Friday, January 11, 2013P Garlock Expansion Joint 1.
GARLOCK EXPANSION JOINT (MSDI-P1367) Systems Design Review January 11 th, 2013 Friday, January 11, 2013P Garlock Expansion Joint 1.
Expansion Joint Active Monitoring. Team Members Joe Savino Mechanical Engineer Adam Remick Electrical Engineer Andrew Hintermeier Mechanical Engineer.
P13621: Conductive Heat Transfer Lab Equipment MSD II: Final Project Review 10 May, 2013 RIT KGCOE.
Jon KleinISEProject Manager Nguyen VuMETechnical Lead Kyle MengesMETechnical Lead Christine LowryMEDesign Engineer Chris SteinMEDesign Engineer Priya NarasimhanEEElectrical.
System Design Review April 5th, 2013 P13623: Conductive Heat Transfer Lab Equipment.
Mike Allocco, Soham Chakraborty, Leslie Havens, Danielle Koch, Andrew Miller, Kristeen Yee, Stephanie Zambito TEAM 14026: SYSTEM DESIGN REVIEW P14026_System.
Sawyer Environmental Changes Mechanical Engineering Department Capstone Amy R. Dan H. Colby C. Brittany P. Richard G. 1.
VOLUNTEER MANAGEMENT SITE VISIT DATE The Leadership Development and Strategic HR Practice Area is presented by American Express. This Service Grant design.
Kaitlin Peranski Spencer Wasilewski Kyle Jensen Kyle Lasher Jeremy Berke Chris Caporale.
BLOOD PRESSURE BIOMEDICAL ENGINEERING TAE_EUI, KIM.
High Temperature Waste Pasteurizer Brian Kilger Kyle Cohn Kyle Weston Stephanie Mauro Parabolic curve P13411.
Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O’Connell, Sarah Salmon, James Brinkerhoff Group Number:
P16221 – FSAE Shock Dynamometer Preliminary Detailed Design Review November 13, 2015.
Jon KleinISEProject Manager Nguyen VuMETechnical Lead (MSD1) Kyle MengesMETechnical Lead Christine LowryMEDesign Engineer Chris SteinMEDesign Engineer.
P15080: Flow Culture System Multi-Disciplinary Senior Design Problem Definition Review September 11, 2014 Collin Burkhart – Lead Mechanical Engineer Katelyn.
P Magnetically Levitated Propeller Group Members: Eli, Zach, Mike, Joe, & Bernie.
Path The purpose of this project is to design a universal data recording device to monitor the health of a Dresser-Rand compressor during operation. In.
Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall.
P16081: SYSTEMIC CIRCULATION MODEL Jacob Zaremski – Lead Engineer Mallory Lennon – Project Manager John Ray – Communications Manager Fabian Perez – Purchasing.
THROUGH NERANJAN DHARMADASA JAMES BROWN P09451: Thermo-Electric Module for Large Scale Systems.
Nanofluidic Characterization David Sharp David West Justin Davis.
Expansion Joint Active Monitoring. Team Members Joe Savino Mechanical Engineer Adam Remick Electrical Engineer Andrew Hintermeier Mechanical Engineer.
P16680: AATech Universal Oil and Bag System Subsystem Design Review 10/20/15.
P16680: AATech Universal Oil and Bag System System Design Review 9/29/15.
P16452 Active Reciprocating Compressor Valve Assembly Team: Negar Salehi, Bob Osborn, Ian Nanney, Keith Leung, Chris Reynolds.
January 16, 2009Senior Design I - System Level Design Review System Level Design Review Senior Design I Low Energy Printing Project P09505.
MECHATRONICS Group # Group Members’ Names MENG 483 Project Title of the Project Spring 20XX.
SYSTEM LEVEL DESIGN REVIEW P16318 Gaseous Mass Flow Rate Controller Luke McKean, Lianna Dicke, Selden Porter, Schuyler Witschi ?
Positioning Sensor for Electric Motor Drive ENGR 498 Senior Design College of Optical Sciences Industrial Affiliates.
Educational Apparatus to Demonstrate 1-D Conductive Heat Transfer David Olney Todd Jackson Edward Turfitt Charles Pueschel Ian Abramson Alysha Helenic.
Motor Assisted Wheelchair Design Review 10/01/15.
Tethered Aerostat Program Concept Design Review Team Name Conceptual Design Review University/College Team Members Date.
DPM 5 Minute Commercial Novel Materials Technology P08405 Matt Wavrek.
Midpoint Project Review P10454 VAD Test Loop
Turbomachinery Flow Visualization P08453
P13623: Conductive Heat Transfer Lab Equipment
Low Energy Printing Project P09505
Multi-Disciplinary Senior Design
Systems Design Review : Heart Pump and Circulatory System
P15661 Reciprocating Friction Tester Base Subsystem
Multi-Process 3D Printer: Detailed Design Review
Control Loops: Primary Sensors, Transmitters, and Transducers - Agenda
Heart Pump and the Circulatory System P17080
Detailed Design Review Solar Thermal Water Heater
P15661 Reciprocating Friction Tester Base Subsystem Problem Definition Review Matt.
P18325: Automated Breast Pump Cleaning System (Team ABC’s)
Low Energy Printing Project Overview
Preliminary Detailed Design Review: P18001
Presentation transcript:

Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall Week 4 End of Day Presentation:  Design Review Agenda  Design Review Attendees

Start TimeTopic of ReviewStart TimeTopic of Review Start TimeTopic of Review 0Opening Slide Subsystems -System Prep/Verification 1General "What's the Problem?" -Physiological 90 --removing bubbles 2-Project Definition-Ten Words 30 --Compliance 95 --leak test 3Purpose -future use 40 --Resistance Electrical 4 Team member roles and responsibilities -Mechanical 100 -Pressure Sensors 5 Customer interview – QFD 50 --Pressure/Flow 105 -Flow Sensors 8How'd you get there? 60 --System Dimensions 110 -Temperature Sensors 11Selection Process 65 -Component Selection 115 -DAQ 15Expectations 70 --Heat Transfer 120Summary-End 16 System Overview 75 --Temperature Control -Specifications, QFD 80 --Blood Removal -Selection Process 85 --Reservoir Definition - Related Customer Needs and Specs Concept Selection - Pugh Charts Analysis - Calculations and Risks

Dr. DayMEDr. PhillipsEE Dr. StevensMEDr. BorkholderEE Dr. RobertsonMEDr. BrownEE Dr. Lamkin-KennardMEDr. DolittleBio Dr. KemskyMEMr. HanzlikME Dr. GeeMEHemodynamic Team Mr. WellinMEDave Gomez-VAD Research Team

Set up meeting with Dr. Doolittle to discuss physiological concerns. Contacted sensor suppliers-obtained costs and specifications.