.- 1 - 17/06/2015 Christian J. Schmidt GSI Production of ALICE TRDs Progress and Quality Development Alice TRD Chamber Production Meeting Darmstadt Feb.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Dmitrii Mausuzenko, Oleg Maev (PNPI)
Status of test beam data analysis … with emphasis on resistive coating studies Progress and questions 1Meeting at CEA Saclay, 25 Jan 2010Jörg Wotschack,
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Winter shutdown 08/09 Summary of HV interventions Barrel Muon Workshop, 02/09 Jesús Puerta-Pelayo, CIEMAT 17-February-2009.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
Xe leak status C. Garabatos. Leak story The maximum allowable leak rate corresponds to a loss of 10% of the total volume in one year – 0.3 l/h for the.
TRD Production at GSI Joerg Hehner TRD Collaboration Meeting Bucharest
AquaGlo Water Detector Kit For Detecting Water in Jet Fuel
TRD Collaboration Meeting GSI Clemens Adler TRD Chamber production issues General Issues, Planning and Hd Status.
Dariusz Miskowiec, TRD status meeting Oct alignment... i.e. how to figure out where the detectors are, and how to use this knowledge in the reconstruction.
Hd Status and Planning TRD Chamber Construction Meeting Clemens Adler.
Test Results Of Gain Uniformity Measurements Heidelberg Chamber maximum deviation [%] L1C0#001 33,45 L1C0#002 25,94 L1C0#017 24,41 L2C0#001 16,76 L2C0#002.
TRD Status Meeting Münster Clemens Adler TRD ROC Status Status Meeting Münster
TRD Collaboration meeting GSIClemens Adler First TRD Production Chambers Production Tests Results Documentation.
Chamber production status 75% of production (of 1st half of detector) reached in May Currently ~80% is produced 100% (1st half) expected in October. End.
TRD Status meeting IKFClemens Adler TRD ROC Status -Dubna -Bukarest -GSI -Frankfurt -Heidelberg.
8.7.04TRD Status meeting HdClemens Adler TRD ROC Status.
TRD Collaboration meeting GSIClemens Adler First Production Chambers Production/tests/results.
TRD Status meeting GSIClemens Adler Chamber production Production status/ Material status.
TRD Status meeting Alice week HdClemens Adler TRD Chamber Status News: New leak rate measurements Production is imminent Some material arrived Soldering.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Engineering Design Review for TRD-Readout Chamber
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site1 (Selected Items on) Quality Control at Aachen.
Test of the high voltage strength of Pelletron’s gas insulation (18-Dec-2008) Recycler Meeting January 21, 2009 A. Shemyakin.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
1 Stony Brook Update: T.K. Hemmick for the Tent Crew.
Unit 4 Sections A7-A9 In which you will learn about:
Malte HildebrandtMEG Review Meeting, 14th February 2007 Report of Run Coordinator Run 2006 Summary Malte Hildebrandt MEG Review Meeting, 14th February.
RPC Cosmic Rays Test in Naples Paolo Iengo Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M. Caprio, G. Carlino,R. de Asmundis, M. Della Pietra, D. della.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
U N C L A S S I F I E D Progress Report on the Dual-Use Cryostat John C. Ramsey Los Alamos National Laboratory.
TRD R&D at GSI  Results from test beam 2004  Plans for test beam Feb. 06  Measurements with X-ray stand C. Garabatos, GSI.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Sewage Treatment Plant ELIL ABODE. STP Figure A3A1 A2 S1 S2 SF F1 F2 CF.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
1 Jim Thomas - LBL A proposal to close the Grid Leak “it will never die” Yuri Fysiak, Jim Thomas & Gene VanBuren Eric Anderssen, Howard Wieman & Jon Wirth.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
Results from the CMS-RPC tests at CERN Gamma Irradiation Facility Roberto Guida CMS-RPC (Bari, Beijing, Napoli, Pavia, Sofia) Seoul, October 2005.
Gas Quality Checks Maria Luisa Porto Oriented by: Burkhard Schmidt 23/02/2009.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
TRD Workshop RomaniaClemens Adler Heidelberg ROC Status Material procurement, Chamber Status TRD workshop Cheile Grandistei, Romania,
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
Summary of User Requirements for Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Offline Week Alignment and Calibration Workshop February.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
RPC Operation Jilei, Qingmin, Changguo, Ningzhe 2013/4/3.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
D. De Gruttola SALE-01: issues with HV supply fixed SALE-01: issues with HV supply fixed QA weekly meeting 26/04/2016.
Preparation Stationary Sample Holders
Metrology and Trimming of CCD Detector Height
Spectrometer Operation in IP2 & 8
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
construction and tests
Geant4 Documentation Geant4 Workshop 4 October 2002 Dennis Wright
AquaGlo Water Detector Kit For Detecting Water in Jet Fuel
Presentation transcript:

/06/2015 Christian J. Schmidt GSI Production of ALICE TRDs Progress and Quality Development Alice TRD Chamber Production Meeting Darmstadt Feb. 27th 2006

L4 and L5 chambers often show severe gain inhomogeneities up to +- 40% Problem can be cured by shimming side ledges with 100 or 200 micron shims, depending upon the outcome of pre-glue scan(s). Homogeneity Distortions Could be Resolved

Final Glueing Alters Things Slightly

Statistics on Homogeneity over Current Production

Statistics on Maximum Deviations (Histogram) Maximaly deviating points per chamber collected. Outlyers may be attributed to various problems

Leakage Currents Apply HV immediately after chamber installation, initial leakage currents would identify surface leakage. Ever since the employment of the cleaning procedure, no more leakage across glue surfaces encountered. Leakage due to dust and dirt remains but seldom in winter Leakage due to bad HV-cables with missing currents has resurfaced due to bad cables that had been used in the past.

Gas Leak Determination Normal behaviour: Time constant of Oxygen level ~ 12 h By now quite a few cases ( ~ 8 ) with  ~ 50 to 100 h Strong indication for virtual leaks No external leaks measurable Oxygen level scales inversely with gas flow Taken typical initial Oxygen content of 80 ppm at 20 l/h, implying a leak of 8 mbar l/h, the time constant would indicate a hidden volume of several hundred ml. too little for the radiator too much for the pad plane At GSI chambers in doubt are rapidly moved to a separate leak test stand where they can be flushed for many days.

Statistics on Leakage over Current Production

Statistics on Gain Measurements Histogram on measured gain at 1600 V Anode voltage Gain determination is difficult at GSI as strong EMI disturbances are intermittendly present.

Mistakes on Radiator Unveiled Just intended as an example for funny data and straight forward explanations: Diagnosis: one out of seven radiator pads missing in one compartment

Dubna Chambers under Repair Out of 18 chambers, 4 have a broken radiator towards the inside of the chamber All 18 chambers need to be refurbished: Radiator needs to be carefully reworked and closed again. Yuri and Nicolai are at GSI until March 11 th to work on chambers They are experimenting on best techniques for refurbishment Bernd Voss (GSI) has successfully repaired one of the broken chambers

Proposed Reassembly Procedure Pressure applied through slab: 5 g/cm 2 ~ 5 mbar Radiator Pad- panel Gas Volume Spacer support bars Gas Inlet

Conclusion on Current Situation at GSI Production is running smoothly Production rate at 1.5 chambers per week, limited by infrastructure Various problems have been settled and quality is improving Dubna chambers are under repair, no reason to be pessimistic here.