Quality Management – Cost and Time Management Initial Cost of Materials & Equipment Labor Cost Long Term Cost Time Management.

Slides:



Advertisements
Similar presentations
Unit 12 Construction Surveying
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Special Inspections
Should the Commissioners Adopt A Code Enforcement Program for Missoula County?
MANAGING PRODUCTION SYSTEMS. Managing Production Systems –A project should be worked  Within schedule  Within budget  And safely –Management has to.
Building Code Analysis –Violation of building codes and regulations can cause injury to building users and expose architects to legal liability and the.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Building Codes Violation of building codes and regulations can cause injury to building users and expose architects to legal liability and the possible.
Review of Plans & Estimating Introduction Architect’s Responsibilities Types of Estimates Factors Affecting Cost Film Project:
Primary Residential Design Considerations
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
2012 International Fire Code Adopted as the minimum fire safety standard by the State of Wyoming City of Sheridan must adopt the minimum standard to retain.
COMPONENTS OF FLOORPLANS & ELEVATIONS Objective 6.05 & 6.06.
Site Plans.
WELCOME Getting Smart About Home Modifications A Webinar Series Sponsored by the Wisconsin Department of Health Services W ebinar #5 Permits, Zoning and.
Architectural Design Construction of a Wall Section Upon completion of this assignment, you will be able to accurately and neatly draw, to scale and limits,
Construction Specifications
Introduction to Building Codes © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture.
Governmental Constraints on Construction Chapter 2.
MODULE ONE BASIC BLUEPRINT READING PRINCIPLES
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 10 Slide 1 Unit 10 Commercial Construction.
Farmworker Housing Inspections Unit 2: Pre-Inspection Preparations.
PUBLIC HEARING PROCESS AND REVIEW FOR THE PROPOSED ADOPTION OF THE 2012 INTERNATIONAL CODES AND THE 2011 NATIONAL ELECTRICAL CODE.
Building Codes. Codes  Building Code –Regional  BOCA, SBCCI, CABO, UBC, CITY OF DALLAS, –National  IBC  Fire Code –NFC, UFC, NFPA, Life Safety 101.
Construction Drawing Occupational Safety and Fundamentals
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design 1.
Chapter 15 Construction Scheduling. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
Introduction to Building Codes. Babylonian Code of Hammurabi Purpose of Building Codes Engineering Failures US History of Building Codes Building Officials.
Formats ACT 380.
Building Permits for Solar Domestic Hot Water Systems Ted Van Vliet Toronto Building October 1 st, 2008 Presented at Solar Neighbourhoods Contractor Workshop.
Chapter 2 Introduction to Construction Procedures
Chapter 23 Lighting Design Process: Final Phases © 2006 Fairchild Publications, Inc.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Chapter 42 Building Codes and Commercial Design. Introduction Commercial drafting depends more on building codes –This means working with the International.
Chapter 15 Site Plan Layout. Driveway style and Slope Design Considerations  Minimum lawn slope of 5% for first 10’ (5/8” per foot)  Minimum concrete.
Chapter 10 Architectural Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Distinguish.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Planning Construction Chapter 15. Private Sector  Most buildings and other structures are built for ordinary people. These people make up the private.
Private Sector  Buildings and structures built for ordinary people.
Property Inspection & Analysis: The Improvements
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
BCM 210-L1 IMPACTS OF MATERIALS AND METHODS. DEFINE THE FOLLOWING MATERIALS METHODS ASSEMBLIES.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
Sprinkler Loads on Trusses
PLANNING CONSTRUCTION. Initiating Construction private sector – residential, industrial, commercial public sector – public works.
The division of lands by legislative regulations, into areas or zones, which specify allowable land uses and size restrictions.
Fire Sprinkler System Presentation By Harold Stewart City Manager November 17, 2014.
Sprinkler Loads on Trusses Educational Presentation.
Chapter 6 Designing Recreation Facilities and Reading Blueprints.
Inspection and Quality Assurance Requirements for Metal Plate Connected Wood Trusses Educational Overview.
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design 1.
Applicant: Robert Ganem Addresses: 7304 & 7312 Black Oak Lane Planning Commission Meeting – August 21, 2015.
What Procurement Managers Need to Know About Construction Materials Management Office John White – Materials Management Officer and State Engineer
CITY OF HARARE EMERGENCY SERVICES
PUBLIC HEARING PROCESS AND REVIEW FOR THE PROPOSED ADOPTION OF THE 2012 INTERNATIONAL CODES AND THE 2014 NATIONAL ELECTRICAL CODE.
Enforcement of Floodplain Management Regulations
How Completed Interiors Are Achieved: Designing & Building
Construction Documents
Estimating Project Costs
Costs and Economics of Construction
Common Surveys Used For Commercial Real Estate Transactions
City of Healdsburg Construction Codes Amendments & Adoption: 2016 Building Standard Codes Title 24 Parts 1 Thru International Property Maintenance.
Decisions and considerations of choosing or building a new home.
Introduction to Building Codes
Introduction to Building Codes
Partners in Building Safety
Introduction to Building Codes
City Council Meeting November 14, 2016
Presentation transcript:

Quality Management – Cost and Time Management Initial Cost of Materials & Equipment Labor Cost Long Term Cost Time Management

Quality Management – Cost and Time Management Initial Cost of Materials & Equipment: To control cost the architect considers – Initial cost – Installation cost – Long-term cost Architects must specify the most appropriate products & materials for proper performance Most products are available with various features or in various grades – e.g. wood grade – CMU types – concrete Cost of assemblies vs. individual components Cost based on product / material availability, project location, suppliers and general economic conditions.

Quality Management – Cost and Time Management Labor Cost – +50% of construction cost = labor – Architects sometimes try to reduce the amount of on-site labor by specifying factory made assemblies – Field labor rates and productivity are union based – Factory conditions are better and productivity is higher – States set ‘prevailing wages’ to even the pay scale for union and non-union workers – Costs can be reduced by using repetitive materials and details

Quality Management – Cost and Time Management Long Term Cost (Operational Costs) Long term costs are usually inversely proportional to short term costs e.g. – High efficiency HVAC has a high initial cost but saves money over time Can be client-type driven: – Developer = short term owner vs. owner occupied school or government building Maintenance Cost Specifying appropriate products & materials effects maintenance costs – Buildings that serve large populations vs. residential buildings – Toilet partition types / accessible ceilings allow for maintenance

Quality Management – Cost and Time Management Fabrication time: shop vs. site Erection time: prefabricated items go up faster Construction Sequence: contractor controlled, but design has influence on sequence – Partitions that extend to the deck limit the ceiling installation till after the walls are finished

Project Code & Zoning Analysis Working with the IBC Working with a Zoning Ordinance

Working with the IBC New Jersey follows the International Building Code, New Jersey Edition Additionally, NJ has it’s own Administrative Code which contains the Uniform Construction Code (NJUCC) NJ also has adopted other codes for plumbing, electrical, fuel gas and life safety

Working with the IBC For this course we will outline steps for using the IBC NJ Edition A good method is the following sequential format: – Use & Occupancy – Chapter 3 – Construction Type – Chapter 6 – Building Height & Size – Chapter 5 – Fire Safety Requirements – Chapter 9 – Means of Egress – Chapter 10 Other information may be required for more complex buildings.

detection alarm extinguish

300 people w/ 2 means of egress; 150 people per egress 150x0.2=30” wide corridor…or.. If you design a 5’ wide stairway it can hold 60/0.3=200 persons get bonus w/ sprinkler 60/0.2=300 persons

Working with a Zoning Ordinance Along with the building code, the zoning ordinance is absolutely necessary for project development. Remember zoning is enforced by law, so violations are subject to penalties. Additionally, the owner/client will not be pleased with a building design that cannot be built, the client can seek damages for this error.

Working with a Zoning Ordinance - 1 Obtain a current property survey from the client. Usually a survey is part of the package given to the owner when the property was purchased (closing documents). If a survey is not available, the owner should engage the services of a licensed surveyor to prepare a new one. The survey should show all meets and bounds as well as street dimensions and exact locations of all structures on the lot, utility locations If your site is irregular with slopes and hills, request topographic data as well. This will help with the building design

Working with a Zoning Ordinance - 2 Obtain the current zoning ordinance. You may be able to place a phone call to the zoning office and discuss your project. If your project is simple, the zoning official might simply fax you the required pages. Otherwise go the municipal building and discuss the project in person. You may have to purchase the ordinance, prices vary from $25 to $50 (or more), so ask first

Working with a Zoning Ordinance - 3 Obtain the zoning map that outlines the various zones in your municipality and locate your project address on the map.

Working with a Zoning Ordinance - 4 Read the sections of the ordinance related to your project’s zone. Read all other appropriate sections of the ordinance that related to your project (i.e. off-street parking requirements, lighting, signage etc.). This takes time and careful reading!

Property Address: 14 Pine Place, North Caldwell, Essex County, NJ Survey Project Description: Owner wants an addition at rear of house

addition 24.03’ 23.42’ 22.66’

Property Address: 50 Leslie Street, Newark, Essex County, NJ Project Description: Owner wants a new 2-family house

City of Newark Zoning Ordinance for 2 nd Residential District Note: Text at bottom of page regarding 25 foot by 100 foot lots

Schedule of Requirements for Zoning Ordinance

Assignments Complete Title Sheet with Zoning & Code Analysis Quiz #1