TCS3 Telescope Operators area with TCS1 (about 2006) and TCS3 in Feb 2009.

Slides:



Advertisements
Similar presentations
Solar PV On-Site Guide Solar PV On-Site Installers Guide.
Advertisements

Unit 7 Installing Computer Hardware
TCS3 Conceptual Design Review 1 Aug 21, 2003 TCS3 Project Replacement of the Telescope Control System for the IRTF Conceptual Design Review Aug 2003.
Greenbush School Maintenance Calendar. JULY Week 1 ❏ Check clock systems ❏ Fertilize athletic fields ❏ Drag and roll baseball/softball fields ❏ Clean.
Endcap Muon meeting: UC Davis, Feb , 2005 J. Hauser UCLA 1 TMB and RAT Status Report Outline: Current status of TMB and RAT boards Noise measurements.
Fixed Gain Amplifier Used within the Feed Back Loop.
CONSTRUCTION BLUEPRINT READING
EEMS User Group Meeting Date5 th June 2013 Time10.30 VenueCollabro Limited.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
Infrastructure Update As at 11 th March 2009 Remaining four plates now fitted to North shield wall North & South walls and all galleries are considered.
MICE Collaboration Meeting Frascati 26 – 29 June 2005 Work Group report On Design & Safety Review.
Status: Tritium Plasma Experiment at the INL Safety and Tritium Applied Research (STAR) Facility R. A. Anderl*, J. P. Sharpe*, R.D. Tillotson* (*INL) R.A.
Final Deadlines for students aiming to graduate in November 2013 April 4th PGR4 submitted to Registry (to approve examiners at next GSB) July 8 th Submission.
DWA: WATER QUALITY MONITORING TASKS. TENDER DOCUMENT Aim: develop a systematic monitoring protocol that will determine possible impacts of natural and.
Status of AMS02 Integration Area in Building 867 January 10, 2007.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
PRESENTATION FOR POLO SETTIMO TORINESE PROJECT Nov.25 th.2009.
Northern Lincolnshire Healthy Lives Healthy Futures Programme NEL CCG Partnership Board Update September 2014.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
DECEMBER 19, 2013 PRESENTATION TO THE TRSD SCHOOL BOARD Timberlane District Action Plans.
2D GOING SOLO CASH BUDGETS. Cash BudgetUnit 2D A cash budget allows us to monitor cash flow It shows future planned receipts and payments of cash Here.
QCAL upgrade status FE electronic replacement actual status future design test E. Santovetti KLOE General meeting December 2002.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
Substation L1/ Booster Substation Y-BE2 Update #3 August 15,2012.
Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Shintake Monitor: Installation and Commissioning Schedule Taikan SUEHARA, The.
Seaborg Decommission James M. Craw Computational Systems Group Lead NERSC User Group Meeting September 17, 2007.
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
minstrelinhibernation.blogspot.com community.sparknotes.com yamber.deviantart.com
VAC – CTRL SYS internal meeting, 14 Dec A list of topics Start of the disassembly works: mid Jan. At first the W arm shall be off- service, then.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
2016 RFIT Student Design Competition A. Competitor B. Competitor C. Competitor Affiliation 1.
Data Center Stabilization
Recommendation of Texas Test Plan Team to RMS
PRR Activation Meeting
IT Strategy Roadmap Template
Timeline Roadmap Template
News about the WA104 Programme
Mpact Plastics Atlantis Kalev Taim – Operations Manager
Current Status Future Progress Monitoring
Introduction Jason Tarrant – Integration Engineering Step IV Removal
Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun
Centralized Classroom and Event Scheduling: Spring 2019
X-ray Pump-Probe Instrument
Terry Cotter LO/IF Group Leader
13-block rotation schedule
MU Retirees Association Retirement Plan Update March 17, 2018
Student Assignment Review Advisory Committee
Operations Manager- the person responsible for supervising the production of goods and services for the company. 7 activities of the operations manager.
Get IEEE 802® Update IEEE 802 Plenary; 802 EC November 2014.
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Assembled by the Rubicon Forest Protection Group
Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun
FAY Dates School Year Traditional Fall 4x4 Spring 4x
Information Management & Financial Analysis for HR Managers
PBIS Update November 2005.
PBIS Update December 2005.
PBIS Update October 2005.
Implementing 8-Hour Ozone, PM2.5, and Regional Haze Standards
FAY Dates School Year Traditional Fall 4x4 Spring 4x
01 DRAW YOUR TIMELINE HERE JAN. MAR. JAN. MAR. FEB. APR. FEB. APR.
PLANNING LOOKING AHEAD…. Long Term Goals (Assigned to…)
May June 30 Aug 31 Sept-Dec Jan 04 Feb 04 March 04
Valley Grande Elementary School First day of school August 6, 2019
Ft. Benning Office Hours
Repairing the Electrical Components
CSC Electronics Installation and Commissioning Oct ‘06
Presentation transcript:

TCS3 Telescope Operators area with TCS1 (about 2006) and TCS3 in Feb 2009

TCS3 Project – Sept 2008 to Feb 2008 TCS3 in operation since September During this time TCS1 has been completely offline. Safety Board Issue –Hacked up current Revision C safety board to isolated component that were sensitive to electrical interference. –Producing a Revision D version of the safety board. New design improves isolation and filtering. Add previous fixes. –Schedule Dec/Jan – Design work. Staff review given on Jan 15. – Feb – Layout & Manufacture March – Installation.

TCS3 Project – Sept 2008 to Feb 2008 Monitoring Of Amplifiers – To be completed in March HA Absolute Position Encoder - To be returned in March Decommissioning of TCS1 –Officially decommission on Dec 31, –Day Crew has been systematically disconnecting and removing equipment since Jan. –Flooring work can now be complete. –New furniture in storage.