10/21/03H.J. Krebs1 LST Mechanical Design Review Brass Absorber Design H.J. Krebs October 21, 2003.

Slides:



Advertisements
Similar presentations
Module Assembly Update Ohio State University and Princeton University are presently preparing facilities for module assembly. Both universities are fabricating.
Advertisements

ME 350 – Lecture 7 – Chapter 24 ECONOMIC AND PRODUCT DESIGN CONSIDERATIONS IN MACHINING Tolerances and Surface Finish Selection of Cutting Conditions Product.
Introduction DRAWING. It is a process of cold forming a flat blank of sheet metal into a hollow vessel without much wrinkling, trimming, or fracturing.
01/07/2008HCAL Main Meeting- Mechanical Integration1 ILD HCAL Mechanical Integration HCAL Main Meeting Kirsten Kschioneck, DESY.
Section 3 design of post-tensioned components for flexure Developed by the pTI EDC-130 Education Committee lead author: trey Hamilton, University of.
Far Detector Assembly Block Pivot Table Design Review WBS Dave Pushka April 2 nd 2008.
AnDY at IP2 Infrastructure Requirements & Experimental Construction 1Charles Folz, BNL.
Circular Plates Moments acting on an element of a deformed circular plate.
EQUILIBRATE SYSTEM UPGRADE Systems Design Review.
October 21, 2003LST Mechanical Design Review - SLACN. Yu BaBar IFR Upgrades An FEA Study of the Effects of Adding Brass Plates in the IFR.
David H. Dowell Injector RF Design November 3, LCLS Injector RF Gun: Design, Fabrication & Tuning Plans D. H. Dowell,
October 21, 2003H.J. Krebs1 LST Mechanical Design Review West Coast Team Mechanical Engineering and Design Manpower & Organization H. James Krebs October.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review 2005 IR-2 Installation Discussion H.J. Krebs October 22, 2003.
BaBar: The Detector Richard F Boyce 21 October 2003.
2004 BRASS INSTALLATION HARDWARE. BRASS INSTALLATION FOR 2004 TOP AND BOTTOM SEXTANTS ONLY PROCEEDURE AND FIXTURES FOR TOP AND BOTTOM ARE SIMULAR.
May 5, 2004H.J. Krebs LST Installation Readiness Review 2004 IR-2 Installation Schedule H.J. Krebs May 5, 2004.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review 2004 IR-2 Installation Schedule H.J. Krebs October 22, 2003.
General idea of a couple of check rod system and adjustments
May 5, 2004H.J. Krebs LST Installation Readiness Review Brass Absorber Production H.J. Krebs May 5, 2004.
IFR End Door Enhancement Mechanical Engineering Status & Installation Issues H. James Krebs June 23, 2001.
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
Plain & Reinforced Concrete-1 CE-313
October 21, 2003H.J. Krebs1 LST Mechanical Design Review Handling & Installation Fixtures Design and Fabrication Status H.J. Krebs October 10, 2003.
Joint Institute for Nuclear Research Further optimization of the solenoid design A.Efremov, E.Koshurnikov, Yu.Lobanov, A.Makarov, A.Vodopianov GSI, Darmstadt,
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
MARS 2 Design Review-Optomechanical Review 07 Nov 2002 GLW1 MARS 2 Mechanical Design Review.
Conservation of Energy. Machines.. Conservation of Energy Energy: the ability to do work. The Law of Conservation of Energy: Energy cannot be created.
September 18, 2007H. J. Krebs1 SiD Collaboration One Piece End Door Design Concept plus Forward Equipment Interfaces H. James Krebs SLAC September 18,
LST Upgrade LST Upgrade Readiness Review William Sands, Princeton University,
HCAL Mechanical Design Victor Guarino HEP-ANL. Work to date.. Have been thinking about how to construct individual modules and assemble them into a barrel.
Unit4 Three Phase Induction Motor Part -2 Air Gap, Rotor Design N.Pandiarajan Associate Professor/EEE SSNCE.
Target Status CM19 RAL October 2007 P J Smith – University of Sheffield.
11/15/02H.J. Krebs IFR Improvement Phase II (Barrel) Mechanical Engineering Issues H. James Krebs November 15, 2002.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
MILLING By: Jacob Eames. setup The time required to produce a given quantity of parts includes the initial setup time and the cycle time for each part.
Global Design Effort Magnetic and Mechanical FEA of SiD IRENG07 Bob Wands September 18, 2007.
1 PS cabling status and planning Overview Rustem DZHELYADIN (CERN&IHEP, Protvino) PS-Cabling: what has been done : 1.PS/C top cable tray (3days)installed.
LSTs in the IFR gaps Workshop on IFR replacement SLAC November 14, 2002 L. Piemontese INFN Ferrara.
May 31, 2010Bill Wisniewski1 Mechanical Integration Issues.
October 7, 2009H.J. Krebs1 Super B WorkShop Overview of BaBar Detector Assembly/Installation Documentation Jim Krebs.
Built-up Compression Members
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Baby MIND Scintillator modules 11 November 2015 Revision E. Noah.
ITOP Quartz Procurement Status James Fast Pacific Northwest National Laboratory PNNL-SA
ORKA support - status report Scope of conceptual design task Develop a conceptual design for how to support the ORKA detector inside the CDF detector Develop.
SuperB – IFR status of the detector & tooling development 1V. Carassiti - INFN FEINP PAN 07-09/09/2012.
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
M.Oriunno, SLAC 1 SiD installation with horizontal access shafts Marco Oriunno, SLAC SiD/ILD Engineering Meeting SLAC, December 2011.
Introduction BaBar Components The Problem IFR Upgrade: 2004 & 2005
PANDA Yoke of the Magnet
Mechanics for front-end Electronics Of T2K-II TPCs – A Few Conceptual Ideas D. Calvet, Irfu, CEA Saclay, Gif sur Yvette Cedex, FRANCE.
Load Balancing: List Scheduling
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
LST Mechanical Design Review
LST Module Installation
Limited Streamer Tubes
RPC and LST at High Luminosity
GLAST Large Area Telescope:
Basic Check Link Principles
Drawing Area Coordinate System
An Najah National University Submitted to : Dr.Munther Diab .
Limited Streamer Tube Project Summary
Load Balancing: List Scheduling
BaBar LST Upgrade Richard F Boyce
Presentation transcript:

10/21/03H.J. Krebs1 LST Mechanical Design Review Brass Absorber Design H.J. Krebs October 21, 2003

10/21/03H.J. Krebs2 Brass Absorber Design - General Requirements –Provide minimum of 5.25” total radial thickness of brass absorber material Six layers.875” in thickness replacing IFR layers 5,7,9,11,13 & 15 –Brass material shall be Leaded Muntz Metal, UNS C ; Admiralty Brass (Antimonial), UNS C-44400; Admiralty Brass (Phosphorized), UNS C-44500; or Naval Brass (Uninhibited), UNS C-46400, or an equivalent alloy. –Forces induced by the brass dead load shall not inhibit the installation of the LST detectors – i.e., reduce steel gaps (see Nancy Yu’s talk) –Additional detector weight related to brass shall not compromise the detector earthquake design (see Les Dittert talk)

10/21/03H.J. Krebs3 Brass Absorber Design Brass absorber purchase split into 2 phases –Phase I Top and bottom sextants – 24.8 tons total (including spares) Needed by April 1, 2004 –Pre-installation preparation Material specification and detail drawings complete Steel gap corner conditions designed and parts detailed Purchased by DOE (SLAC) –Out for RFP on 10/9/03 –Proposal to be opened 10/29/03 –Phase II Side sextants – 47.9 tons total (including spares) Needed by January 1, 2005 –Pre-installation preparation Material specification and detail drawings complete Steel gap corner conditions still under consideration Purchased by INFN –Monies have been allocated –In INFN procurement cycle

10/21/03H.J. Krebs4 Brass Absorber Design (Phase I)

10/21/03H.J. Krebs5 Brass Absorber Design (Phase I)

10/21/03H.J. Krebs6 Brass Absorber Design (Phase I)

10/21/03H.J. Krebs7 Brass Absorber Design (Phase I) Each layer consists of 14 brass plates (84 plates per sextant) 7/8” thick and 10.5” in depth installed in the difficult direction to minimize steel plate deflection Plates are cambered such that each plate is flat to within ±.060” when simply supported at the four corners –Actual amount of camber determined by fabricator Range of possible Z misalignment: –3.4” to 8.8” depending on tolerances Aluminum wedge fillers prevent binding in gap corners Brass plate cannot turn in gap beyond 5.9° Corners radiused ¼” R to prevent the plate from binding with wedge fillers from Z angular misalignment

10/21/03H.J. Krebs8 Brass Absorber Design (Phase II) Each layer consists of 14 brass plates (84 plates per sextant) 7/8” thick and 10.5” in depth installed in the difficult direction to minimize steel plate deflection Plates shall be flat to ±.060” in the as-rolled condition assuming no effect by gravity Range of possible Z misalignment yet to be determined –Depends on steel gap corner conditions Design of remaining Phase II components complete on January 5, 2004

10/21/03H.J. Krebs9 Conclusions Brass absorber needed for 2004 is designed and is in the SLAC RFP process –Supporting hardware design is complete and fabrication is underway Brass absorber needed for 2005 is designed and proceeding through the INFN procurement process –Supporting hardware design begins Our goal is to have the absorber material in hand with all pre-installation preparation complete as early as possible to take advantage of any potential schedule advancement –PEP machine breakage