A Framework for Comparing Different Information Security Risk Analysis Methodologies Anita Vorster, Les Labuschagne Ajay Kumar Iduri Sushma Sachidanand.

Slides:



Advertisements
Similar presentations
1 of 21 Information Strategy Developing an Information Strategy © FAO 2005 IMARK Investing in Information for Development Information Strategy Developing.
Advertisements

2009 – E. Félix Security DSL Toward model-based security engineering: developing a security analysis DSML Véronique Normand, Edith Félix, Thales Research.
PROJECT RISK MANAGEMENT
Chapter 2 Analyzing the Business Case.
Overview of IS Controls, Auditing, and Security Fall 2005.
Auditing Concepts.
Systems Analysis and Design Feasibility Study. Introduction The Feasibility Study is the preliminary study that determines whether a proposed systems.
Networked Systems Survivability CERT ® Coordination Center Software Engineering Institute Carnegie Mellon University Pittsburgh, PA © 2002 Carnegie.
© 2001 by Carnegie Mellon University PPA-1 OCTAVE SM : Participants Briefing Software Engineering Institute Carnegie Mellon University Pittsburgh, PA
Introduction to Research Methodology
Screen 1 of 24 Reporting Food Security Information Understanding the User’s Information Needs At the end of this lesson you will be able to: define the.
The Islamic University of Gaza
Risk Management Chapter 7.
Project Risk Management
©2011 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
COMP8130 and COMP4130 Adrian Marshall Verification and Validation Risk Management Adrian Marshall.
©2003 Prentice Hall Business Publishing, Accounting Information Systems, 9/e, Romney/Steinbart 18-1 Accounting Information Systems 9 th Edition Marshall.
By: Ashwin Vignesh Madhu
Lecture 10 Comparison and Evaluation of Alternative System Designs.
The Information Systems Audit Process
Risk Assessment Frameworks
B RITISH B ANKERS' A SSOCIATION Operational Risk & the Regulatory Environment Simon Hills Director - Prudential Capital team.
Project Risk Management EECS811: IT Project Management Presenter: Gavaskar Ramanathan.
Project Plan Development
Introduction ► This slide deck provides a suggested framework for the financial evaluation of an investment project. When evaluating any such project,
«Enhance of ship safety based on maintenance strategies by applying of Analytic Hierarchy Process» DAGKINIS IOANNIS, Dr. NIKITAKOS NIKITAS University of.
Life Cycle Overview & Resources. Life Cycle Management What is it? Integrated concept for managing goods and services towards more sustainable production.
PRM 702 Project Risk Management Lecture #28
© 2005 Virtue Ventures LLC. Licensed under a Creative Commons Attribution-Share Alike 3.0 License Feasibility Analysis For Social Enterprise.
Project Risk Management. The Importance of Project Risk Management Project risk management is the art and science of identifying, analyzing, and responding.
Chapter 11: Project Risk Management
Chapter 10 Contemporary Project Management Kloppenborg
Security Risk Management
Managing Risk Text by Stanley E. Portny, Samuel J Mantel, Jack R. Meredith, Scott M. Shaffer, Margaret M. Sutton with Brian Kramer. PowerPoints by Christine.
Risk Assessment and Management. Objective To enable an organisation mission accomplishment, by better securing the IT systems that store, process, or.
Management & Development of Complex Projects Course Code MS Project Management Perform Qualitative Risk Analysis Lecture # 25.
National Commission for Academic Accreditation & Assessment Developmental Reviews at King Saud University and King Faisal University.
INFORMATION SECURITY MANAGEMENT L ECTURE 7: R ISK M ANAGEMENT I DENTIFYING AND A SSESSING R ISK You got to be careful if you don’t know where you’re going,
Enterprise Risk Management Chapter One Prepared by: Raval, Fichadia Raval Fichadia John Wiley & Sons, Inc
IT Risks and Controls Revised on Content Internal Control  What is internal control?  Objectives of internal controls  Types of internal controls.
Question paper 1997.
Software Architecture Evaluation Methodologies Presented By: Anthony Register.
27/3/2008 1/16 A FRAMEWORK FOR REQUIREMENTS ENGINEERING PROCESS DEVELOPMENT (FRERE) Dr. Li Jiang School of Computer Science The.
Project Risk Management Planning Stage
Software Project Management
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Chapter 12 Translating Expectations to Specifications CEM 515: Project Quality Management Prof. Abdulaziz A. Bubshait King Fahd University of Petroleum.
Information Security Governance and Risk Chapter 2 Part 2 Pages 69 to 100.
Control and Security Frameworks Chapter Three Prepared by: Raval, Fichadia Raval Fichadia John Wiley & Sons, Inc
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
IB Business & Management
Chapter 8-1 Chapter 8 Accounting Information Systems Information Technology Auditing Dr. Hisham madi.
OCTAVE By Matt White. OCTAVE  OCTAVE® (Operationally Critical Threat, Asset, and Vulnerability Evaluation) is a risk-based strategic assessment and planning.
Systems Analysis Lecture 5 Requirements Investigation and Analysis 1 BTEC HNC Systems Support Castle College 2007/8.
Risk Assessment: A Practical Guide to Assessing Operational Risk
 System Requirement Specification and System Planning.
 Define and recognize risk  Define the contents of a risk management plan  Conduct a risk identification and prioritization process  Define.
Introduction and Overview
Auditing Concepts.
Security SIG in MTS 05th November 2013 DEG/MTS RISK-BASED SECURITY TESTING Fraunhofer FOKUS.
CHAPTER11 Project Risk Management
Initiating systems development
The Importance of Project Risk Management
Introduction and Overview
Chapter#8:Project Risk Management Planning
DESIGN OF EXPERIMENTS by R. C. Baker
Chapter#8:Project Risk Management Planning
Internal Control Internal control is the process designed and affected by owners, management, and other personnel. It is implemented to address business.
METHODS FOR ANALYZING AND SUPPORTING A SUSTAINABLE PRODUCTION SYSTEM
State University of Telecommunications
Presentation transcript:

A Framework for Comparing Different Information Security Risk Analysis Methodologies Anita Vorster, Les Labuschagne Ajay Kumar Iduri Sushma Sachidanand Quang Tran Vinh

Overview Introduction Information Security Risk Management Methodologies Criteria on which Framework is based The Framework for Comparison How the Framework should be used Strengths and Weakness of this proposed Framework Conclusion References

Introduction Information security is an organization’s approach to maintaining confidentiality, availability, integrity, nonrepudiation,accountability, authenticity and reliability of its IT systems Currently there are numerous risk analysis methodologies available some of which are qualitative while others are quantitative in nature These methodologies have a common goal of estimating the overall risk value

Introduction An easy-to-use framework is required to compare information security risk analysis methodologies The best way to choose between methodologies is to compare them, using objective, quantifiable criteria This is where a framework for comparison is needed If the criteria that are used are applicable to all risk analysis methodologies, the organization can compare different methodologies objectively, and decide on the best one

Alternative Frameworks The framework proposed by Badenhorst indicates whether a methodology addresses a criterion or not It does not use scales, or trade-offs which can aid the organization in choosing a methodology which will best meet their needs This shows the need for more Comparative Frameworks

Information Security Risk Management Methodologies The Methodologies can be broadly classified into two categories Quantitative Methodologies Qualitative Methodologies Both qualitative and quantitative methodologies were evaluated for developing the framework Different risk analysis methodologies were analyzed to determine common criteria for comparison

Qualitative Methodologies The qualitative methodologies considered for this framework are OCTAVE (Operationally Critical Threat, Asset and Vulnerability Evaluation) The CORAS (Construct a platform for Risk Analysis of Security Critical Systems) methodology

Quantitative Methodologies The quantitative methodologies considered for this framework are ISRAM (Information Security Risk Analysis Method) Cost-Of-Risk Analysis (CORA) Information Systems (IS) analysis based on a business model The above methodologies were chosen because they have been well documented

OCTAVE OCTAVE was developed at the CERT Coordination Center (CERT/CC) [Cert Coordination Center 2003] This approach concentrates on assets, threats and vulnerabilities One of the main concepts of OCTAVE is self- direction, the people inside the organization must lead the information security risk evaluation An analysis team, consisting of staff from the organization's business units as well as the IT department, is responsible for leading the evaluation and recording results

OCTAVE The OCTAVE approach has three phases, with each broken down into processes Each process has certain activities that must be completed, and within each of these activities, different steps must be taken in order to achieve the desired outputs The final result that risk decisions can be based on is the threat profile of different assets Each threat profile contains information on which mitigation decisions can be based

CORAS CORAS was developed under the Information Society Technologies (IST) program One of the main objectives of CORAS is to develop a framework that exploits methods for risk analysis, semi-formal methods for object-oriented modeling, and computerized tools, for a precise, unambiguous, and efficient risk assessment of security critical systems The methodology is based on UML a language that uses diagrams to illustrate relationships and dependencies between users and the environment in which they work

CORAS During an information security risk analysis, a great deal of information is brainstormed, and during workshops and discussions, different people (users, system developers, analysts, system managers), with different expertise in different fields come together, give their opinions and share information A way in which all the participants can communicate efficiently and understand each other must therefore exist and a UML profile, proposed by the CORAS project, is used to achieve this

CORAS The framework has four main pillars, of which risk management is one. In CORAS, the final result on which decisions can be based is the UML class diagrams of each asset

ISRAM The ISRAM methodology was developed at the National Research Institute of Electronics and Cryptology and the Gebze Institute of Technology in Turkey It is marketed as a quantitative approach to risk analysis that allows for the participation of the manager and staff of the organization and a survey-based model Two separate and independent surveys are conducted for the two attributes of risk, namely probability and consequence

ISRAM ISRAM does not use techniques such as Single Occurrence Losses (SOL) or Annual Loss Expectancy (ALE), instead, the risk factor is a numerical value between 1 and 25 This numerical value corresponds to a qualitative, high, medium or low value, and it is this qualitative value on which risk management decisions are based

CORA International Security Technology, Inc. (IST) developed CORA, the Cost-Of-Risk Analysis system The CORA risk model uses data collected about threats, functions and assets, and the vulnerabilities of the functions and assets to the threats to calculate the consequences, that is, the losses due to the occurrences of the threats

CORA It is a methodology where the risk parameters are expressed quantitatively and where losses are expressed in quantitative monetary terms CORA uses a two-step process to support risk management. Parameters for threats, functions and assets are validated and refined until the best values are determined

CORA CORA then calculates SOL and ALE for each of the threats identified It estimates a single loss value for a threat to an organization, and then multiplies this value by the frequency of the threat occurrence

IS Risk Analysis based on a Business Model The IS Risk Analysis Based on a Business Model was developed at the Korea Advanced Institute of Science and Technology This model was developed because traditional risk analysis methodologies had some limitations It takes an asset’s value and then not only bases the analysis on its replacement cost, but also measures the tangible asset’s value from the viewpoint of operational continuity

IS Risk Analysis The methodology has four stages During this methodology, the importance level of various business functions of the business model and the necessity level of various IS assets are determined Mathematical formulae are used to calculate ALE for a single threat occurrence on the organization The end result is a quantitative monetary value

Criteria for the Framework Whether risk analysis is done on single assets or groups of assets Where in the methodology risk analysis is done The people involved in the risk analysis The main formulae used Whether the results of the methodology are relative or absolute

Criteria for the Framework Each criterion has a scaling The scaling indicates the level of a criterion based on certain trade-offs In the end a compliance factor must be selected to indicate how relative the criterion is to a methodology

Whether Risk Analysis is done on Single Assets or Group of Assets Criteria can either take on a value of 1 or 2, as follows: 1: if risk analysis is done on individual assets 2: if risk analysis is done on groups of assets In the case of the OCTAVE and CORAS methodology, the risk analysis is done on a single asset If the end result is a single value for a threat scenario that can affect more than one asset, the risk analysis is done on a group of assets, such as in the case of the CORA,ISRAM and IS Business model methodology

Where in the Methodology Risk Analysis is Done This criterion explains where in the methodology risk analysis takes place Some preparation, where values for information are estimated, must be done before risk analysis can be performed Some risk analysis methodologies may require more values for different information to be estimated than other methodologies

Where in the Methodology Risk Analysis is Done OCTAVE needs values for impact and probability IS Risk Analysis Based on a Business Model needs values for probability, income loss, replacement cost and relative importance of business functions Methodology that needs little preparation and less information is CORA An accurate risk analysis, more preparation means more detailed results, thus ISRAM would be a better option

Scale for this Criterion The scale for this criterion is based on a trade-off between time and accuracy. If time is most important 1: Risk analysis done after extensive preparation 2: Risk analysis done after some preparation 3: Risk analysis done after little preparation If accuracy is most important 1: Risk analysis done after little preparation 2: Risk analysis done after some preparation 3: Risk analysis done after extensive preparation

The People Involved in the Risk Analysis The people involved in the risk analysis can either be internal or external to the organization CORA uses external risk experts to perform the risk analysis, whereas OCTAVE uses internal personnel exclusively

Scale for this Criterion The scale for this criterion is based on a trade-off between cost and expertise If cost is most important, values are as follows: 1: Risk analysis is performed by external experts 2: Risk analysis is performed by external and internal people 3: Risk analysis is performed by internal people If expertise is most important, values are as follows: 1: Risk analysis is performed by internal people 2: Risk analysis is performed by external and internal people 3: Risk analysis is performed by external experts

The Main Formulae Used Some methodologies use mathematical formulae while others use an expected value matrix The main formula shows the magnitude of calculations that need to be done, thus indicating the complexity of the risk analysis The scale for this criterion is based on a trade-off between simplicity and accuracy

Scale for this Criterion If simplicity is most important, values are as follows: 1: Risk analysis involves extensive mathematical calculations 2: Risk analysis involves some but simple mathematical calculations 3: Risk analysis involves no mathematical calculations If accuracy is most important, values are as follows: 1: Risk analysis involves no mathematical calculations 2: Risk analysis involves some but simple mathematical calculations 3: Risk analysis involves extensive mathematical calculations

Whether the Results of the Methodology are Relative or Absolute Some methodologies produce results that are relative. This means that there is no relationship between results and they cannot be compared Other methodologies produce results that are absolute and can be compared The scale for this criterion is based on a trade-off between a methodology providing merely a ranking of risks, or a methodology that can calculate how much greater one risk is over another

Scale for this Criterion If merely ranking of risks is most important, values are as follows: 1: Results are comparable 2: Results are not comparable If the differences between risks (how much greater one is over another) are most important, values are as follows: 1: Results are not comparable 2: Results are comparable

The Framework for Comparison

The Main Formulae Usedin OCTAVE The OCTAVE methodology uses an Expected Value Matrix to determine a risk’s expected value. The main formula is: Loss = Impact/consequence x Probability

The Main Formulae Usedin CORAS The CORAS methodology also uses the impact and probability approach. Loss = Impact x Probability

The Main Formulae Usedin ISRAM

The Main Formulae Usedin CORA ALE = Consequence x Frequency consequence = Σn(individual SOL’s) n the number of single occurrence losses, and SOL = loss potential (worst case monetary value) x vulnerability CORA uses some, but not extensive mathematical calculations. It gets a value of 2 for both simplicity and accuracy

The Main Formulae Usedin IS IS Risk Analysis Based on a Business Model uses the following:

How the Framework Should be Used The use of the framework is rather simplistic, which allows for use by more organizations Firstly the organization must identify their specific needs. Then, based on the scales of each criterion as defined earlier, the organization must determine values for the specific methodologies they want to compare

Strengths Can be applied to various risk analysis methodologies Takes the requirements of an organization into account It uses scales based on different scenarios and trade- offs Can give an indication of which assets and people will be needed for the risk analysis as based on the requirements of the organization

Weakness Not taking the customization of a methodology into account The OCTAVE methodology can be tailored to fit the needs of an organization Not all processes have to be performed, which can influence the place where risk analysis fits into the methodology The preparation required can therefore be reduced The risk analysis based on the requirements of an organization

Weakness The existence of other criteria, not presented by the framework There are many other risk analysis methodologies, such as CRAMM and there are also baselines, which cover a wider variety of information security aspects, such as the ISO framework and which can be used to define other criteria

Conclusion Numerous methodologies are currently available and many organizations are faced with the daunting task of determining which one to use The goal was to develop an easy-to-use framework that organizations can employ to compare different information security risk analysis methodologies The main benefit lies in the ability to eliminate the majority of methodologies that are unsuitable and to only further investigate the few that remain

References A Framework for Comparing Different Information Security Risk Analysis Methodologies ANITA VORSTER And LES LABUSCHANGE BADENHORST, K.P, ELOFF, J.H.P, AND LABUSCHAGNE, L, 1993, A comparative framework for risk analysis methods, Computers & Security CERT COORDINATION CENTER, 2003, The OCTAVE approach, FREDRIKSEN, R, KRISTIANSEN, M, GRAN, B, AND STOLEN, K, The CORAS framework for a model-based risk management process, INTERNATIONAL SECURITY TECHNOLOGY Inc (IST Inc) Managing risks using CORA, PowerPoint presentation usa.com