CXC Manager’s Status Report Chandra User Committee Meeting Roger J. Brissenden 25 June 2002.

Slides:



Advertisements
Similar presentations
CXC Manager’s Status Report For the period Oct 05 – Mar 06 Chandra Users’ Committee Meeting Roger Brissenden 5 April 2006.
Advertisements

CXC Response to June 04 Report 1.Bakeout Status: Paul Plucinsky 2.CIAO upgrade information: Jonathan McDowell 3.DS9 and visualization scripts: Jonathan.
Chandra User’s Committee Meeting (6/27/04) P. Slane (Chandra Mission Planning) Constrained and Coordinated Observations Chandra Mission Planning Response.
19 Oct 2005Chandra Users' Committee Cycle 7 Peer Review: June 2005  747 proposals, 12 panels, 101 reviewers  Hilton, Logan Airport.
Chandra Users’ Committee CXC Manager’s Status Report For the period October 06 – March 07 Edward Mattison CXC Deputy Manager 25 April 2007.
Chandra Users’ Committee CXC Manager’s Status Report For the period October 08 – March 09 Roger Brissenden CXC Manager 06 April 2008.
Chandra Users’ Committee CXC Manager’s Status Report For the period April 08 – September 08 Roger Brissenden CXC Manager 15 October 2008.
CXC Manager’s Status Report Chandra Users’ Committee Meeting Roger J. Brissenden 12 January 2004.
CXC Manager’s Status Report Chandra Users’ Committee Meeting Roger J. Brissenden 25 January 2005.
Chandra X-Ray Observatory CXC Paul Plucinsky CUC September Overall Status of the Instrument 2.Update on Controlling the FP Temperature ACIS Ops.
Chandra Users’ Committee, Oct 2009 Chandra Director’s Office Cycle 11 Peer Review Proposal Numbers:  668 submitted proposals  *5.6 oversubscribed.
CXC Manager’s Status Report For the period April 06 – September 06 Chandra Users’ Committee Meeting Roger Brissenden 17 October 2006.
Chandra Users' Committee, 27 April 2010 Chandra Director’s Office Cycle 12  CfP Release: Dec  GTO Deadline: 11 March 2010  GO Deadline: 18 March.
Chandra Users’ Committee, Oct 2006 Chandra Director’s Office Chandra Director’s Office Proposal Cycle 8  725 submitted proposals  *6.4 oversubscribed.
CXC EPHIN Status and Alternatives Michael Juda. CXC EPHIN StatusPage 2 Outline 1.EPHIN description 2.Thermal issues 3.+27V rail anomaly and impacts 4.Operations.
Chandra Users’ Committee CXC Manager’s Status Report For the period April 09 – October 09 Edward Mattison CXC Deputy Manager 29 October 2009.
Chandra Users’ Committee CXC Manager’s Status Report For the period April 07 – September 07 Roger Brissenden CXC Manager 19 September 2007.
Users' Committee, 25 Oct 2010 Chandra Director’s Office Cycle 12 Peer Review  June 2010, Hilton, Logan Airport  No major changes in Cycle 12 
CXC Manager’s Status Report Chandra Users’ Committee Meeting Edward M. Mattison 19 October 2005.
Chandra X-Ray Observatory CXC SOT, FOT, ACIS & MSFC PS October 19, Update on a Proposed Bakeout CXC SOT & FOT, ACIS Instrument Team and CXC SOT.
CXC Chandra X-ray Observatory Operations. CXC Overview 1. Mission and Observatory Description 2. Chandra Operations 3. Chandra X-ray Center Architecture.
25 June 2002Chandra Users’ Committee, Belinda Wilkes XMM/Chandra Schedules AO date 15 Dec 2002 Deadline 15 March 2003 Peer Review ~15 June 2002 AO date.
TRENDS ANALYSIS OVERSIGHT Dan Schwartz Development and Operations Science Support/ Technical Support Team 12 January 2004 CXC Users Committee SOT/DAS.
Chandra X-Ray Observatory CXC Paul Plucinsky EPI Cal Update on ACIS Operations I.New Patch for ACIS Flight SW II.Control of the ACIS FP temperature.
CXC Chandra Users' Committee Chandra Director’s Office Proposal Cycle proposals *6.4 oversubscribed (based on time) GTO for review: due 3 rd April.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Tracking Chandra Science Productivity Publication Metrics special thanks to John Bright, Arnold Rots, and Sherry Winkelman (Archive Group) and Mihoko Yukita.
CXC Manager’s Status Report Chandra Users’ Committee Meeting Edward M. Mattison 29 June 2004.
SAIC-F QA Internal Process (DRAFT ) Sudha Chudamani QA Team, Frederick National Lab Jan 2, 2013.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Chandra X-Ray Observatory CXC ACIS Ops team December 2, ACIS Ops Future Response to BEP Watchdog Reboots ACIS Ops Team.
CXC Implementing 2007 NRC Portals of the Universe Report Chandra X-ray Center Recommended Best Practices Roger Brissenden and Belinda Wilkes 25 April 2012.
NPOESS Data Quality Monitoring (DQM) Interface Functionality at DoD Centrals Update COPC Action Item Jim Vermeulen 13 November 2008.
SSSC 02/18/2010 P. Marcum Science Utilization Policies SOFIA SCIENCE UTILIZATION POLICIES Pamela M. Marcum SOFIA Project Scientist SSSC Feb 19, 2010.
SERVICE MANAGER 9.2 CHANGE PRESENTATION JUNE 2011.
1 ANASAC Meeting – May 20, 2015 ALMA Pipeline Brian Glendenning (for Jeff Kern)
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
1 Description and Benefits of JWST Commanding Operations Concept TIPS/JIM Meeting 17 July 2003 Vicki Balzano.
Chandra Users’ Committee CXC Manager’s Status Report For the period October 2010 – September 2011 Edward Mattison CXC Deputy Manager 13 October 2011.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
Chandra Users’ Committee CXC Manager’s Status Report For the period October 2011 – September 2012 Roger Brissenden CXC Manager 10 October 2012.
April , 2006 HEASARC Users Group Steve Drake RXTE Archive at HEASARC Status and Plans Steve Drake.
MWA Operations Management Plan (OMP, v. 3) Ron Remillard (MIT); MWA Project Meeting, June 6, 2011.
Chandra Users’ Committee CXC Manager’s Status Report For the period October 2009 – April 2010 Roger Brissenden CXC Manager 27 April 2009.
CUC Oct 2012 Chandra Director’s Office Cycle 14 Peer Review   June 2012, Hilton, Logan Airport  No major changes in Cycle 14  13 topical.
Chandra Users’ Committee CXC Manager’s Status Report For the period May 2010 – October 2010 Roger Brissenden CXC Manager 25 October 2010.
GLAST Science Support CenterNovember, 2005 GSSC User Committee Meeting Tools for Mission and Observation Planning Robin Corbet, GSSC
19th GIST 27 th -29 th August 2003 E Sawyer RAL Status of GERB1,2,3 and 4 Battery issues Operations during eclipse Stray light NOT bearing life test.
ASPERA-3 Mar. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/01 Schedule statused.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
Chandra X-Ray Observatory CXC ACIS Ops team March 27, Controlling the ACIS FP Temperature: Turn Off the ACIS DH Heater ACIS Ops Team.
S. Ritz 1 GLAST Science Policy Document Outline Action Item GUC Meeting June 2005 R. Brissenden S. Ritz Gamma-ray Large Area Space Telescope.
Concurrency, Processes, and System calls Benefits and issues of concurrency The basic concept of process System calls.
Fermi Users Group Meeting Goddard Space Flight Center, February 6, 2009C. Shrader, NASA/GSFC 1 Fermi Users Group FSSC News Chris Shrader, Fermi Science.
Chandra Users’ Committee CXC Manager’s Status Report For the period October 2013 – September 2014 Roger Brissenden CXC Manager 23 October 2014.
GLAST Science Support Center November 17, 2006 GUC Face-to-Face Meeting GLAST GI Program (with revised schedule) David Band, GSSC.
1 Fermi Gamma-ray Space Telescope Users Group Meeting December, 2013 Mission Status Update J. McEnery.
Chandra Users’ Committee CXC Manager’s Status Report For the period October 2014 – September 2015 Edward Mattison CXC Deputy Manager 29 September 2015.
GLAST User’s Committee Meeting– 1 – June 6-7, 2005 GLAST Burst Monitor (GBM) Chip Meegan NASA/MSFC.
1 EOS Aqua Mission Status at AMSR Science Team Meeting September 16, 2015 Huntsville, Alabama Bill Guit Aqua/Aura Mission Director - Code 584 phone
1 Chapter 8 karvaytMélKMerag nig kareFVIr)aykarN_ nig karbiTKMerag Project Evaluation, Reporting, and Termination.
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
1 CAA 20 th Cross Calibration Meeting, MPS, Gottingen 16th Oct 2014 CAA Cross Cal Meeting Oct 2014 Pipeline Automation Chris Perry.
INFSOM-RI WP3: WP3: Software configuration tools and methodologies Status Report ETICS All-Hands – 23 May 2007 E. Ronchieri.
Roger Brissenden CXC Manager 22 October 2013
From delivery to acceptance
ASPOC Presentation for the CAA Operations Review-1 Klaus Torkar and Harald Jeszenszky IWF/OAW Graz ESTEC, May 2006.
Chandra Users’ Committee CXC Manager’s Status Report
Point 6. Eurostat plans for Time Use Survey data processing and dissemination Working Group on Time Use Surveys 10 April 2013.
HOME AFFAIRS IDENTIFICATION SYSTEM (hanis)
Presentation transcript:

CXC Manager’s Status Report Chandra User Committee Meeting Roger J. Brissenden 25 June 2002

CXC Status Report/CUCPage 2 Program Level Status Spacecraft continues to perform superbly and operations continue to be routine. No significant spacecraft hardware problems or safe modes have occurred since last report. Flight software patch to mitigate EPHIN hardware failure flag glitch running SCS Cycle 4 proposals (817 GO, 10 GTO) submitted by deadline of 3/15/02. Peer Review held on schedule June Plan agreed to with MSFC and HQ on adding resources in the Ed/Outreach area to provide additional emphasis on SSUs. CXC Quarterly review 4/23/02. No major actions resulted from the review. MSFC Independent Annual Review to be held 9/5/02. Contract change in work to direct SAO to perform call for proposals in place of NRA – similar to HST model. CXC Contract extension proposal for 11-months from 9/30/02 to 8/31/03 in final sign-off with MSFC. MSFC is pursuing a JOFOC approach for contract post 8/31/03. Second 5-year budget level briefing given to HQ as part of POP-02. No significant near-team budget or staffing issues. Out-year profile in work with HQ.

25 June 2002CXC Status Report/CUCPage 3 Items from January 02 CUC “Occasionally a few datasets are delivered well beyond the mean lag of 7 days. We suggest that each OBSID has a built-in alarm so that the appropriate scientists are informed when an OBSID has been unduly delayed.” The archive group has installed a script which checks the automated processing (AP) status for observations which have been in the queue for a week or more. The duty scientist is notified of all such observations. In addition DS has implemented monthly manual checks of the AP status tables for observations which have been received but for which processing has not completed. “We recommend that more channels be opened by which either the Director or the CXC Outreach office can learn of potentially interesting results. Possibilities include charging CUC members to take some responsibility for identifying potentially appropriate science results and sensitizing PIs of successful large proposals of this issue.” The CXC has reached agreement on a plan with MSFC and HQ to increase the resources in the Education and Public Outreach area. An important task for the new resources will be to address this issue.

25 June 2002CXC Status Report/CUCPage 4 Operations Nominal Spring 2002 eclipse season. Patch up-linked to increase glitch counters and mitigate EPHIN hardware failure glitch counter trips of SCS 107 (second occurrence on 4/2/02 however EPHIN hardware is nominal and cause traced to subtle timing condition). Successful test of bright earth constraint limitation. Expected to lead to reduction of the 20 degree constraint yielding more flexible scheduling. 6 executions of SCS 107 due to high solar activity, 1 assessed as due to EPHIN hardware failure glitch. –No ACIS CTI degradation above expectations. Anomalies –None. Hosted a number of visits or discussions with other mission teams: –NGST, SIRTF, Kepler, SIM, HST (July).

25 June 2002CXC Status Report/CUCPage 5 Operations Load interrupt TOOs DateTargetRequest 3/3/02NGC day 3/11/02RX J days 3/12/02SN2002B03 days 3/28/02GRB days 4/5/02GRB day 4/5/02XTE J day 5/10/02XTE J days 6/3/02GRB day Operations Ground System Updates DateVersionChange 2/27/02ONLS 3.8.2New front end processor file interface 5/2/02OFLS 9.2BMajor update of momentum management 5/2/02GRETA 1.2.2Plot bug fix 6/12/02OFLS 9.3Interface to AGASC 1.5 (starcat update)

25 June 2002CXC Status Report/CUCPage 6 MUPS Fuel Usage

25 June 2002CXC Status Report/CUCPage 7 MUPS Warm Start Count

25 June 2002CXC Status Report/CUCPage 8 Scheduled Observing Efficiency

25 June 2002CXC Status Report/CUCPage 9 Cumulative Observations for NRA-3

25 June 2002CXC Status Report/CUCPage 10 Data Systems Data processing –Average time from observation to data delivery has been maintained at approximately a week Data System Software Releases (major) DateReleaseContent includes 2/6/02DS 6.6NRA4 Budget software WebChaSeR fixes, MTA alerts 3/22/02DS 6.7New SUN cc compiler SI mode, data base and HRC processing updates 6/14/02DS 6.8Solaris 8 port of data system.

25 June 2002CXC Status Report/CUCPage 11 Data Delivery Effectiveness

25 June 2002CXC Status Report/CUCPage 12 Chandra Grant Awards