PALM-3000 Integration and Testing Status A. Bouchez Team Meeting #15 10/29/2009.

Slides:



Advertisements
Similar presentations
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
Advertisements

PALM-3000 HOWFS - 2/20/09 C. Baranec. PALM-3000 HOWFS Current optical testing Review of Feb 8 th HOWFS update Detailed future tasks 2.
PALM-3000 Electronics PDR Stephen Guiwits Dean Palmer Ernest Croner 023 Robinson Room January 21, 2009.
PALM-3000 P3K Team Meeting #9 Stephen Guiwits Team Meeting #9 and 023 Robinson October 22, 2008.
PALM-3000 Management Update A. Bouchez, J. Roberts Team Meeting #15 10/29/09.
PALM-3000 PALM-3000 Management Update Antonin Bouchez, Jenny Roberts Team Meeting #7 27 February, 2008.
PALM PALM-3000 project status 31 Jan COO All-Hands Mtg. Recent Milestones Requirements review on 12 Nov AO system offline for maintenance.
PALM-3000 P3K Team Meeting #16 Stephen Guiwits Dean Palmer, Ernest Croner, Antonin Bouchez Team Meeting # Cahill March 05, 2010.
PALM-3000 Management Update A. Bouchez Team Meeting #9 10/22/2008.
PALM-3000 P3K Integration and Test Review Stephen Guiwits P3K System Computers and Electronics 273 Cahill September 22, 2010.
PALM-3000 PALM-3000 Instrument Architecture Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
PALM-3000 PALM-3000 Status A.H. Bouchez, J.E. Roberts Project 1640 Las Vegas Summit 1/28/2010.
LGS Project Meeting February 1, 2006 Agenda 1.IPT status updates: Laser facility, AO optomechanics, AO software (Bouchez, Roberts, Trinh; 30 min) 2.Sum-Frequency.
NGAO Meeting #3 Introduction NGAO Meeting #3 Peter Wizinowich December 13, 2006.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Schedule and Cost Electrical Ground Support Equipment Schedule and Cost Scott.
NGAO Management Update Peter Wizinowich NGAO Meeting #11 November 5, 2007.
PALM-3000 Optical Bench Update Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss Team Meeting #15 10/29/2009.
PALM-3000 P3K Team Meeting #15 Stephen Guiwits Dean Palmer Ernest Croner Team Meeting # Cahill October 29, 2009.
PALM-3000 PALM-3000 Software Requirements Review Thang Trinh PALM-3000 Requirements Review, Caltech Campus November 12, 2007.
PALM-3000 Instruments update A. Bouchez Team Meeting #9 22 Oct
PALM-3000 ATST/BBSO Visit Stephen Guiwits P3K System Hardware 126 Cahill February 11, 2010.
PALM-3000 High-order Wavefront Sensor Update Christoph Baranec Team Meeting #9 10/22/2008.
PALM-3000 Team Meeting #15 – Wavefront Sensor(s) C. Baranec October 29 th 2009.
LIGO-G D partial ADVANCED LIGO1 Development Plan R&D including Design through Final Design Review »for all long lead or high risk subsystems »LIGO.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
LGS Project Meeting November 9, Outline 1.Project infrastructure 2.PALM-3000 update 3.LGS subsystem updates –Optical bench –LGS facility –AO software.
PALM-3000 Instrument commissioning schedule Antonin Bouchez Team Meeting #7 27 February, 2008.
PALM-3000 PALM3000 Realignment Winter Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss, R. Dekany, M. Troy Layout.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
PALM-3000 HOWFS - 7/24/09 C. Baranec. PALM-3000 Current Status Summary 2 Telescope simulator assembled HOWFS assembled and tested Alignment plan (CIN.
PALM-3000 Systems Engineering R. Dekany, A. Bouchez 9/22/10 Integration & Testing Review.
PALM-3000 Budget and Schedule Update A. Bouchez, J. Roberts Team Meeting #10 1/8/2009.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-ISOC Subsystem1 RFA 1 – Management Plan, Documentation, Schedule  Specific Request – Part 1.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
5 th February 2010 FP7 Prep WP9000 Progress Meeting 1 Update Tim Morris Durham University FP7 Prep WP 9340.
Low Cost Fundus Camera P15590 December 11th, 2014
MSD P07302Design Review1 Motor Controller Subsystem MSD P07302 Project Sponsor: KGCOE Project Members: D. ShenoyProject Manager S. TallauSoftware Design.
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
1 Introduction to Engineering Second Semester Overview Agenda Team Assignments and Information Exchange Course Overview.
LSU 01/17/2006Spring LaACES Schedule For the semester and the next few weeks.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Project Overview Mark McKinnon Project Manager.
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
Summary and plans for the WG1 activity H.Grote – AEI Hannover G.Losurdo – INFN Firenze/Urbino Explorer Nautilus Virgo.
EE400D DOCUMENTATION INSTRUCTIONAL SERIES CRITICAL DESIGN REVIEW.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
February Monthly Status Review (MSR) Note: No presentation this month
Chapter 2 Project Management Methodologies. A project life cycle PlanDesignDevelop Integrate (including test) DeployMaintain They can be iterative and.
U.S. Department of Commerce, National Oceanic and Atmospheric Administration Business Sensitive 1 [Insert Brief Title] Presented to [Title/Rank, Name]
Software Requirements for the Testing of Prototype Correlator Sonja Vrcic Socorro, December 11, 2007.
Electronics Status New DCM daughter card works. –Three cards has been assembled. –One daughter card has been send to Jamie yesterday by FedEx overnight.
ISIS Project Status Report May 18, 2006 Prepared by MAXIMUS, Inc Education Systems Division for the ABT Committee.
SPS – DM Shadow Position Sensors – Demonstration Model Gerardo Capobianco INAF – Astrophysical Observatory of Turin Torino, 21 st January 2016ASPIICS/Proba-3.
ALICE Trigger Upgrade CTP and LTU Design Review ALICE CTP and LTU Upgrade Design Review CERN 27 th January 2016 Budget, time schedule, resources David.
A Disaster Recovery Plan & Learning Apparatus for Students
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Proton Source and LEBT Luigi Celona & Lorenzo Neri
DOE: Transition from MIE to Early Operations Kevin Reil LSST Camera Commissioning Lead LSST Commissioning Plan Review January 24-26, 2017.
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Management Breakout: MREFC Budget Summary Victor L
Billing and Electronic Health Record Upgrade Project
EVLA M/C Software PDR, 14 May 2002
Launch and On-orbit Checkout
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
Mark McKinnon EVLA Project Manager
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
ThomX – Commissioning Meeting – 25/01/2018
Award of Contract M06013C04 Project Management Information System (PMIS) Licensing, Maintenance and Service Agreement Commission Agenda Item #13.
Formula Hybrid - Fall 2018 Lafayette College ECE 491.
Presentation transcript:

PALM-3000 Integration and Testing Status A. Bouchez Team Meeting #15 10/29/2009

PALM PALM-3000 Testbed Currently laying out the PALM-3000 testbed in the Caltech lab.

PALM Testbed I&T Schedule Purpose –Verify interfaces –Characterize subsystem performance –Debug and optimize software Testbed schedule –HOWFS characterization Nov.-Dec –DM characterization Nov.-Dec. –Test reconstructors, DM controlDec.-Jan –Close HODM loop - Matlab Jan. –Test DM high-speed interfaceJan. –Verify RTC data input/outputFeb. –Close HODM loop - RTCMar. –Integrate new DM cablesApr.

PALM Final I&T At Palomar, August through December 2010 –Align P3K relay (optical bench IPT) –Integrate DM electronics, motor controllers Includes testing racks at Cass. –Integrate RTC –Verify all basic system functions Includes installation/removal –Characterize performance in lab (PHARO & P1640) –Document it all! 2 work-years of effort in 5 months!

PALM Commissioning Commissioning Plan –Requesting 12 nights (4 x 3 nights) for commissioning in semester 2011A (Feb.-July 2011). –Expect entire team to participate in most of these! –10 work-months of labor budgeted. Optimization Phase –Planning a 6-month period post-commissioning to fully characterize and optimize system performance.