Office Design for LED Enterprises By Laverne E. Denyer ©Microsoft Office Suite.

Slides:



Advertisements
Similar presentations
Bud Jacksons Sportsmans Bar & Grill 2209 Adams Avenue As purchased in 2003 Built circa 1920 Legacy restaurant and bar facility Existing service area: 3,446.
Advertisements

East Hampton High School July 2013 – July 2014 Design Phases.
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Westminster Town Hall 1770 ● 1835 ● 1889 ● 2011 Continuing a Historical Legacy.
Product Hawick High School Higher and Intermediate 2 Product Design Folios and Projects Name: ______________________ Tutor Group: ______.
INTD 59 bathroom design basics. five basic steps in bath design 1.gathering client & project information 2.setting priorities 3.researching and selecting.
Remsenburg – Speonk Union Free School District Elementary School Bond Planning Presentation October 12, 2010 BBS Architects and Engineers and Triton Construction.
Corporate Profile. Vision Becoming world leaders in giving complete solutions with our br nd emphasizing only on excellence in quality and customer satisfaction.
Commercial Building Project Portfolio
Office Designs The Design Process at Work © MS Office Suite.
Worksession Crash Impediments Ordinance Orange County BCC May 5, 2015.
The World of Architecture
Design & Layout of Foodservice Facilities
Getting Green Building Automation. Why is Building Automation a Green Technology? There are programs starting all over the nation that focus on alternative.
Instructor: J. S. Gretsuk.  24 state of the art computers  Drafting table work stations  Laser Printer  Color Plotter  Blueprint Machine.
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
Facilities Advisory Committee Preliminary Feasibility and Cost Study April 2012.
INTERIOR DESIGN Emma Haupt B2 2/9/12. What is Interior Design ?  Interior design is a job where an individual evaluates, plans and designs interior areas.
Ch. 9: Site Selection and Layout Planning
CHARO-SBA Women’s Center Presented by: Anita Rodriguez Acting Director.
Presentation to SSC Procurement Benchmarking Committee
ARCHITECTURAL DESIGN Residential Design Criteria 1 1 Copyright © Texas Education Agency, All rights reserved.
© OnCourse Learning. All Rights Reserved. Basic House Construction Learning Objectives  List the primary styles of residential architecture  Describe.
Riverside Overpass Master Planning Presenters: Sally Swanson & Magdy Abdalla June 11, SALLY SWANSON ARCHITECTS, INC. Riverside Elementary School.
An Interior Designer and an Architect
Written by: Micah Rooke Georgia CTAE Resource Network 2010.
Facilities Condition Audit Summary of Findings Entech is a full-service Architectural/Engineering firm providing design, construction management, facilities.
Room Relationships and Sizes
Community and Site Selection. Selecting a Community Favorable ______________ base Financial ______________ Labor _______________ Population makeup –_________________.
Western Cape College Excellence in Indigenous Education In the Deep End
Construction Engineering and Management 1 Cost Benefits Structural Safety Architect Feasibility Assessment of architects Functional Aesthetic constructability.
Developing and opening a new facility. Stages in hospitality facility development There are five (5) steps in the development of a hospitality facility:
1 COST ESTIMATING. 2 Time Data Cost Data Performance Data Procurement Data Owner special Data Brainstorming Process Company Needs Market Research. Feasibility.
Klein High School Original building built in 1963 Move KHS to HS #5 in 2011 Move back to renovated KHS in 2013.
Non-profit Economic Development Organization Serving All of San Joaquin County.
CITY OF SEAFORD IMPACT & OVERVIEW OF OUR DOWNTOWN DEVELOPMENT DESIGNATION.
Developing Commercial Design Plan Micah Rooke Georgia CTAE Resource Network 2010.
Chapter 10 Architectural Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Distinguish.
The Brownstone Homes Proposal for the Development of Little League Drive City of Tonawanda, NY.
ITTS Freight in the Southeast Conference Charlotte, North Carolina February 9, 2011.
TDA 3M - ARCHITECTURE SUMMATIVE THEMES - OVERVIEW SUMMATIVE 2012.
Design Standards in Saint Paul Proposed Design Standards Zoning Amendments December 16, 2009 Department of Safety & Inspections / Department of Planning.
Hamburg Hamburg, the winner 2011, has shown major achievements in the past years and at present, has also achieved excellent environmental standards across.
BUILD READY PROGRAM. Benefits of Build Ready Drastically Reduce Construction Time Companies can build sooner on Build Ready sites Reduces the amount of.
By Eoin Hayes.  The designer allocated to me is a Swiss designer called Le Corbusier.  Le Corbusier was an architect and an artist. He was born on October.
Chapter 7 Developing a Center Facility ©2013 Cengage Learning. All Rights Reserved.
The need for regulations to address minimum property maintenance standards has its origins in 2002, when the Board of County Commissioners adopted 2000.
Alice Baker Memorial Library Report to Town and Village Board March 2, 2016.
Chapter 20 Developing a Design Plan. Objectives 1. Identify the steps in developing a design plan. 2. Explain how to assess client characteristics. 3.
Affordable Housing Impact Fees City Council Hearing, Redwood City October 26, 2015.
Non-profit Business Support Centres in Hajdú-Bihar and Bihor counties: Development of operation an cooperation facilities HURO/0802/108_AF Experiences.
Public Hearings D10, E11, F12 March 26, Today’s Public Hearings D C-TRAN-2 Comprehensive Plan amendment adoption E C-TRAN-1 Comprehensive.
ISSUES ASSOCIATED WITH THE CURRENT FACILITIES AND MAINTENANCE MANAGEMENT.
Justice Planners and Designers 212 North 25 th Street, Milwaukee, Wisconsin / Door County Architectural and Engineering.
Chapter 4 Assessment.
This slide can be used as a background before the presentation begins.
The Design Team Carl James.
Architecture, Civil Engineer, and Interior Designer
3D Rendering Services.
Interior Design Services
Washoe County Board of Adjustment February 2, 2017
Drawing & Building Names
Happy with 2016 Business The revenue from architectural and related services during Q was $ billion, a 6% increase from Q2 2016, at $
Floyd County Area Technology Center
Commercial Building Project Portfolio
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
City Council Meeting November 14, 2016
Lot 7C Public Meetings to Date
Washoe County Board of Adjustment June 6, 2019
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Office Design for LED Enterprises By Laverne E. Denyer ©Microsoft Office Suite

LED Enterprises Drafting and Design Business The business began in San Jose in 1973 and transferred to Yuba City in It is a sole-proprietor business. Formerly called Denyer’s Drafting & Design Or 3D Drafting ©Microsoft Office Suite

LED Enterprises Drafting and Design Business A primary business service is architectural designs for residential and commercial use.

LED Enterprises the Business, cont’d Target Clientele Business and Residential owners  All ages and economic bases Contractors Additional space beyond office: None ©Microsoft Office Suite

Needs Assessment The primary needs for this business include: Computer space with adjacent work space  Enough for two people Drafting board and equipment  Enough for 2 people ©Microsoft Office Suite

Needs Assessment, cont’d Whiteprinter Copier Display Area General Work Area Accessibility

Needs Assessment, cont’d Drawing storage Supply and equipment storage Conference area File storage

Proposed Use Two person office Client conferences Designing, drawing and producing plans Design displays Business management

Business Marketing Strategy Low key – Primarily Referrals Local phone book Chamber of Commerce Other……

Design Elements Contemporary Style Interior and Exterior alike Excellent lighting and ventilation Computer safe (weather, static, power, etc.) Comfort Workability Aesthetics

Client Conference Notes Concerned about Space  Minimum 1,000 square feet Budget  $150,000 for furniture and equipment  Facility development funds negotiable – approximately $275,000 Aesthetics

Considerations Sites and materials used for the development of this plan Codes to be met Other…..

Materials List Furniture: Equipment: Facility: Other Resources:

Cost Analysis Equipment & Furniture$100, Facility Cost$ 80, Design Fees$ 2, Total Cost$182,000.00

Comparative Research Plan “A” Square Feet…… Cost…….. Aesthetics…… Workability…… Desirability….. Plan “B” Square Feet…… Cost…….. Aesthetics…… Workability…… Desirability….. Recommendation: Select Plan “A”

Selected Plan: “A” ©LE Denyer 2000

Elevation ©LE Denyer 2000

Location ©LE Denyer 2000

Feasibility Report Plan “A” is very feasible because: Budget Design elements Workable Etc………..

Resources Works Cited Research Graphics Sounds Permissions

Design Report Design theories incorporated in this design Construction considerations Selection Rationale Structural Feasibility for Local Area Other………. ©Microsoft Office Suite