6/17/2015 10:30:49 PM 6851-06_Teamwork 2006 1 Competitive Prototyping Challenges for DoD and Industry Paul Croll, AMND Fellow May 28, 2008.

Slides:



Advertisements
Similar presentations
Options appraisal, the business case & procurement
Advertisements

Course: e-Governance Project Lifecycle Day 1
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
Systems Engineering in a System of Systems Context
NDIA Software Industry Experts Panel Paul R. Croll, Chair NDIA Systems Engineering Division Meeting 24 June 2008.
NDIA Software Industry Experts Panel 14 July NDIA 11 th Anuual Systems Engineering Conference Software in Acquisition Working Groups Software Track.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 28 Slide 1 Process Improvement.
The IGERT Program Preliminary Proposals June 2008 Carol Van Hartesveldt IGERT Program Director IGERT Program Director.
DoD Systems and Software Engineering A Strategy for Enhanced Systems Engineering Kristen Baldwin Acting Director, Systems and Software Engineering Office.
Software in Acquisition Workshop Software Expert Panel Working Groups and Tasks Rick Selby DoD Software In Acquisition.
14 July 2008 Blake Ireland Industry Roundtable COMPETITIVE PROTOTYPING.
Recent Trends in DoD Systems and Software Engineering Processes Bruce Amato Acting Deputy Director, Software Engineering and Systems Assurance Office of.
M I S S I O N The Army SBIR program is designed to provide small, high-tech businesses the opportunity to propose innovative research and development solutions.
University of Southern California Center for Systems and Software Engineering July 2008ICM and CP Workshop © USC-CSSE1 Initial Competitive Prototyping.
Master in Engineering Policy and Management of Technology, 8 th Edition Science, Technology and Innovation Policy GLOBAL STRATEGIES FOR THE DEVELOPMENT.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Guiding principles for the Federal acquisition system
Y. Rong June 2008 Modified in Feb  Industrial leaders  Initiation of a project (any project)  Innovative way to do: NABC ◦ Need analysis ◦ Approach.
Uncovering the Promise of Faculty Success Online Lawrence C. Ragan, Ph.D. Penn State’s World Campus NERCOMP Boston 2005.
Best Practices In Design Outcomes Of A Survey P. H. King, PhD, PE Joan Walker, PhD Vanderbilt University.
Unclassified. Program Management Empowerment and Accountability Mr. David Ahern Director, Portfolio Systems Acquisition AT&L(A&T) 14 April 2009 The Acquisition.
IMA CIM Overview. IMA Mission “Provide a knowledge-sharing platform for business professionals where proven Internet.
IEEE S2ESC Report1 Software And Systems Engineering Standards Committee (S2ESC) Paul R. Croll S2ESC Sponsor Chair June 2004 Report.
Software Development *Life-Cycle Phases* Compiled by: Dharya Dharya Daisy Daisy
DoD Acquisition Domain (Sourcing) (DADS) Analysis of Alternatives (AoA) E-Business/SPS Joint Users’ Conference November 15-19, 2004 Houston, TX.
POWERED BY: A Successful Adoption Of Technology #NPPROTGC Ron Marzitelli Assistant Vice President of Information Technology School of Business & Technology,
1 As a public interest company, MITRE works in partnership with the government to address issues of critical national
© 2007 Pearson Education, Inc. Publishing as Pearson Addison-Wesley 1 A Discipline of Software Design.
Innovators Forum Talent Management. Agenda About the Innovators Forum Background & Perspective on the 2014 Topic The Case for Change Talent Management.
Strategies for Innovation Sourcing 30 August 2007 Paul McGowan Center for Innovative Technology Herndon, VA / Strategies.
Using Business Scenarios for Active Loss Prevention Terry Blevins t
Forum - 1 Assessments for Learning: A Briefing on Performance-Based Assessments Eva L. Baker Director National Center for Research on Evaluation, Standards,
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
Researchers in Europe without Barriers, April th 2009 Postdoctoral Research Careers Project.
Understanding Industry Defense Acquisition University 13 May 2010 Status Brief to NDIA Program Systems Committee.
Radar Open Systems Architectures
IRM304 CDR Course Manager: Denny Involved Competency Leads: 26 (Cybersecurity)-Denman, 19 (Measurement)-Denny, 7 (DBS)-Corcoran [Capability Planning],
Joint Program Executive Office for Chemical and Biological Defense _APBI_JPEO 1 INTRODUCTIONS Preparing Proposals and Responses to Solicitations.
“Thematic Priority 3” Draft Evaluation of IP + NoE.
Identification of national S&T priority areas with respect to the promotion of innovation and economic growth: the case of Russia Alexander Sokolov State.
Chapter Fifteen The Research Report 15-2 Key Terms & Definitions Organizing the Report: 1.Title Page 2.Table of Contents 3.Executive Summary 4.Background.
Stuart A. Hazlett Deputy Director, OUSD(AT&L) Defense Pricing Defense Procurement and Acquisition Policy A Presentation to NCMA Pentagon 8 September 2011.
1 Introduction to Software Engineering Lecture 1.
NDIA CREATE-O.Goldfarb 3/8/2011 Page-1 Distribution Statement A: Approved for public release; distribution is unlimited. CREATE Transition Challenges Oscar.
 Management ◦ The activities and tasks undertaken by one or more persons for the purpose of planning and controlling the activities of other in order.
Fifth Lecture Hour 9:30 – 10:20 am, September 9, 2001 Framework for a Software Management Process – Life Cycle Phases (Part II, Chapter 5 of Royce’ book)
World Intellectual Property Organization DCPPS 1 presented by Mr. Vladimir Yossifov WIPO NATIONAL WORKSHOP ON INNOVATION SUPPORT SERVICES AND THEIR MANAGEMENT.
Strategies for Managing the Online Workload CADE 2003 St. John’s Newfoundland June, 2003.
Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.
Bridges for Recognition Leuven January 2005 Presentation: Pierre Mairesse European Commission, DG EAC: Acting Director Youth, Civil Society, Communication.
Title here Bullet point Jane A. Alexander, PhD Technical Consultant Doing R&D Business with the Federal Government.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
Project Human Resource Management. Presentation Team 1)Mrs. Mardia Ibrahim Osman(Mechanical Engineer) 2)Mr. Elsaeed Osman Elsheikh(Medical Doctor) 3)Mr.
D R A F T Senior Steering Committee (SSC) Briefing CPI Baseline Assessment and DoD CPI/LSS Program Office Standup 18 May 2007.
Or How to Gain and Sustain a Competitive Advantage for Your Sales Team Key’s to Consistently High Performing Sales Organizations © by David R. Barnes Jr.
Knowledge Translation Conference KT Solutions for Overcoming Barriers to Research Use Hosted by SEDL’s Center on Knowledge Translation for Disability and.
Overview of ONC Report to Congress on Health Information Blocking Presented to the Health IT Policy Committee, Task Force on Clinical, Technical, Organizational,
The Business Case for Executive Assessment : Why Assessment in Challenging Times Can Enhance Productivity and Be a Talent “Game Changer” Linda Sharkey,
Life Cycle Cost Savings by Improving Reliability Dr. Charles E. McQueary Director, Operational Test and Evaluation January 15, 2009.
COMPGZ07 Project Management CMMI Project Planning Lecture 5b Graham Collins, UCL.
1 Lecture 2.4a: SEF SE Planning and the SEP (SEF Ch 16) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
LOG 200 Curriculum Review 15 Apr 2011 Curriculum Review LOG 200 Intermediate Acquisition Logistics Presented to the Life Cycle Logistics (LCL) Functional.
Strength through Industry & Technology How is the Government Managing for Value? Program Management Systems Committee March 11, 2007 The Voice of the Industrial.
MDD to Milestone A Requirements Management Activities
Dr Kieran Fenby-Hulse & Dr Rebekah Smith McGloin
Investment Logic Mapping – An Evaluative Tool with Zing
Identify the Risk of Not Doing BA
MDD to Milestone A Requirements Management Activities
By Jeff Burklo, Director
STRATEGIC SYNDICATE 4 ALLIANCES. TWC STRATEGIC ALLIANCE WHAT IS STRATEGIC ALLIANCE 2 Strategic alliances are agreements between two or more independent.
Presentation transcript:

6/17/ :30:49 PM _Teamwork Competitive Prototyping Challenges for DoD and Industry Paul Croll, AMND Fellow May 28, 2008

6/17/ :30:49 PM _Teamwork What is it? Why should I care? Competitive Prototyping (CP) is an approach to competition where two or more competing teams develop prototypes during the early stages of defense acquisition programs Memo released by the Honorable Mr. John Young, Under Secretary of Defense for Acquisition, Technology and Logistics (OUSD/AT&L) on September 19, 2007 –Directed the military services and agencies to “formulate all pending and future programs with acquisition strategies and funding that provide for two or more competing teams producing prototypes through Milestone (MS) B.” –Focus is on major system acquisitions and key system elements Policy expected to be issued in late summer 2008 –Policy will impact how the largest systems are acquired by the Government, with an increased occurrence of prototyping higher risk elements of a system before the procurement

6/17/ :30:49 PM _Teamwork The Honorable Mr. John Young’s Memo

6/17/ :30:49 PM _Teamwork When will the prototyping be done? Graphic from Defense Acquisition GuidebookDefense Acquisition Guidebook Competitive Prototyping performed here DoD 5000 Life Cycle

6/17/ :30:49 PM _Teamwork Expected Benefits (from Mr. Young’s memo) Primary benefits –Avoid cost overruns –Reduce technical risks –Validate system designs –Evaluate manufacturing processes –Reduce time to fielding Secondary benefits –Increasing and strengthening the interaction of government and industry management teams –Develop and enhance systems engineering capabilities –Retain people with critical engineering skills –Attract young talent to the field of science and engineering

6/17/ :30:49 PM _Teamwork Industry Feedback Workshop held 4/28/08 to solicit industry feedback on Mr. Young’s memo Summary of feedback: –There is great value to both the government and prospective developers in: Maturing all relevant technologies Substantially reducing overall risk Refining critical program paths Curtailing dependency on paper proposals. –It is important to achieve an early lock down of stable and predictable requirements – volatility is apt to be a serious impediment to successful competitive prototyping. –Goals need to be clearly defined – the rationale for industry investment (e.g. IRAD) should be visible and convincing. –The logistics of managing a Competitive Prototyping may stretch thin the government team, potentially impeding open communications between the government and the contractors. –Competition may not be necessary during the pre-Milestone B prototyping phase if technology levels going-in are high enough. Several industry topics stirred a great deal of conversation on the part of the DoD audience: –Innovation Recognition and Intellectual Property Protection. –Does Competitive Prototyping increase or reduce the product’s time to market? Presenters provided empirical examples on both sides of this issue.

6/17/ :30:49 PM _Teamwork Survey on CP Software Impacts Little consideration has been given regarding the impact on (and of) software Survey to be conducted to collect insights on software impacts, with special attention to –Requirements –Risk –Estimation –Software quality attributes Survey results will be used by NDIA and OUSD(AT&L) to provide guidance to both government and industry –Expected to drive several specific tasks to create appropriate guidance

6/17/ :30:49 PM _Teamwork Survey Sampling Criteria Success critical stakeholders (SCS) involved in such procurements, including: –Acquirers (military services and defense agencies), with roles including Technical Contractual Oversight –Competitors (such as prime contractors) –Acquisition support organizations (such as SETA contractors) –Acquisition process researchers (such as academics and industry researchers) –Acquisition policymakers (such as persons currently or formerly in these roles) Respondents selected from the above entities should have direct experience with the software aspects of CP or CP-like processes on large, software-intensive system (SiS) projects It is desirable that the software components of such projects be valued on the order of $50 million or larger The surveyed communities should comprise a diversity of domains (for example, C4ISR, avionics, integrated systems of systems, etc.) to capture the broad nature of acquired systems.

6/17/ :30:49 PM _Teamwork Additional Survey Details Survey timeframe: June and early July Survey structure –Survey responses via or Internet –One hour phone call for follow-up Survey being sponsored by: –NDIA Software Industry Experts PanelNDIA Software Industry Experts Panel –OUSD(AT&L) Systems and Software Engineering DirectorateOUSD(AT&L) Systems and Software Engineering Directorate Survey will be executed by: –University of Southern California Center for Systems and Software Engineering led by Dr. Barry BoehmUniversity of Southern California Center for Systems and Software Engineering

6/17/ :30:49 PM _Teamwork References The Honorable Mr. John Young’s September 19, 2007 memo “DOD Acquisition Czar Wants Prototyping Competition”, WashingtonTechnology, 10/9/07.DOD Acquisition Czar Wants Prototyping Competition “Pentagon’s New Prototype Plan”, wired.com, 1/25/08.Pentagon’s New Prototype Plan “The Pentagon’s New R&D Rules Leave Many Questions Unanswered”, The Avascent Group, 1/22/08.The Pentagon’s New R&D Rules Leave Many Questions Unanswered

6/17/ :30:49 PM _Teamwork For More Information... Paul R. Croll Fellow Computer Sciences Corporation Combs Drive King George, VA Phone: Fax: