Chandra X-Ray Observatory CXC ACIS Ops team November 1, 2007 1 Controlling the ACIS FP Temperature: Turning off the DH Heater During Perigee Passages ACIS.

Slides:



Advertisements
Similar presentations
Copyright, 2006: Invisible Service Technicians, LLC Invisible Service Technicians, LLC Invisible Service Technician Monitor Activation Process: IST MaintSelectionV3.php.
Advertisements

P5 Electric Circuits. Question 1 How do you generate a current in a coil of wire?
Digital Non-Programmable Thermostat. Digital screen Setpoint indicator- Appears when the Setpoint temperature is displayed Low battery warning Temperature.
Register Digital Multimeter Usage Click Register to begin the course.
Resistors.  An electrical component that opposes the flow of electrons ?...!
Chandra User’s Committee Meeting (1/25/05) P. Slane (Chandra Mission Planning) Observing Constraints and Their Impact on Mission Planning.
Potential +/- Difference Inc. Regenerative Acceleration Generator Technology Demonstration University of Ottawa Lab.
FOT Mission Planning Prospects and Issues for a Fifteen Year Chandra Lifetime Sabina Bucher 9/18/2007.
Chandra X-Ray Observatory CXC Paul Plucinsky CUC September Overall Status of the Instrument 2.Update on Controlling the FP Temperature ACIS Ops.
Chandra X-Ray Observatory CXC Aspect team April 25, Default Aimpoint Offset Revision for ACIS-S and ACIS-I  Since 2005 the Aspect Camera alignment.
Chandra X-Ray Observatory CXC ACIS Ops team February 28, Controlling the ACIS FP Temperature: Turning off the DH Heater During ALL Perigee Passages.
University of Kansas EPS of KUTEsat Pathfinder Leon S. Searl April 5, 2006 AE256 Satellite Electrical Power Systems.
CXC EPHIN Status and Alternatives Michael Juda. CXC EPHIN StatusPage 2 Outline 1.EPHIN description 2.Thermal issues 3.+27V rail anomaly and impacts 4.Operations.
Chandra X-Ray Observatory CXC SOT, FOT, ACIS & MSFC PS October 19, Update on a Proposed Bakeout CXC SOT & FOT, ACIS Instrument Team and CXC SOT.
Chandra X-Ray Observatory CXC ACIS Ops team February 28, Controlling the ACIS FP Temperature: Turning off the DH Heater During ALL Perigee Passages.
CXC Chandra X-ray Observatory Operations. CXC Overview 1. Mission and Observatory Description 2. Chandra Operations 3. Chandra X-ray Center Architecture.
Teamo Supremo Critical Design Review Ahna Issak Wes Roos Kristen Brenner Kimberley Fornall Barton Tofany Nick Martinez Ahna Issak Wes Roos Kristen Brenner.
ACIS Focal Plane Cooling Test Results from 11 Mar 2005.
Chandra X-Ray Observatory CXC Paul Plucinsky EPIC Cal Nov ACIS Calibration: Planned Updates & Future Issues 2.ACIS Operations: Controlling the.
Chandra X-Ray Observatory CXC Paul Plucinsky EPI Cal Update on ACIS Operations I.New Patch for ACIS Flight SW II.Control of the ACIS FP temperature.
PHSAUTOMOTIVESALSPHSAUTOMOTIVESALS Charging System tests & Voltage information Checking the charging system with just a volt meter.
Chandra X-Ray Observatory CXC ACIS Ops team September 27, Controlling the ACIS FP Temperature: Results from the First Two Tests ACIS Ops Team.
CXC Manager’s Status Report Chandra Users’ Committee Meeting Edward M. Mattison 29 June 2004.
Chandra X-Ray Observatory CXC ACIS Ops team October 17, ACIS Changes Starting in Cycle 8 1) Selection of Optional CCDs 2) Revised Energy-to-PH conversion.
Physics 1809 Minilab 2: Heat and Temperature Physics 1809: The Relationship Between Heat and Temperature Purpose Understand how the total energy in a closed.
Register Digital Multimeter Usage Click Register to begin the course.
Register Digital Multimeter Usage Click Register to begin the course.
2-Stage Heat Pump Defrost Options Defrost options: –30, 60, 90, 120 or Auto (Infinity/Evolution only) Defrost initiate temp: 32° F Defrost terminate temp:
Chandra X-Ray Observatory CXC ACIS Ops team December 2, ACIS Ops Future Response to BEP Watchdog Reboots ACIS Ops Team.
Proposed US Contribution to the Wide Field Imager PSU MIT JHU.
LSU 06/04/2007Electronics 51 Power Sources Electronics Unit – Lecture 5 Bench power supply Photovoltaic cells, i.e., solar panel Thermoelectric generator.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Blackbody Controller 9 March 2004 Scott Ellington
ISUAL Long Functional Test H. Heetderks. TRR December, 20012NCKU UCB Tohoku ISUAL Long Functional Test Heetderks Basic DPU Function Verify Power on Reset.
Operation Sabbath Mode - SELECT PROGRAM - Lights, alarms and fans Normal Sabbath Overview.
Register Digital Multimeter Usage Click Register to begin the course.
Overview of STIS Repair Plans Charles R. Proffitt November 16, 2006.
BAKE BROIL - SELECT PROGRAM - CONV BAKE CONV BROIL SELF CLEAN On any diagram screen, double click any of the following components to bring you to a description.
Space Monkeys Launch Readiness Review Project Curious George November 11, 2008 Project Curious George November 11, 2008.
LASOR research supported under DARPA/MTO DoD-N Program Award Number W911NF Packaging Emily F. Burmeister, Walter Yuen, Henrik N. Poulsen, John.
E1 – Electrical Fundamentals
Chandra X-Ray Observatory CXC ACIS Ops team December 13, Controlling the ACIS FP Temperature: I.Turning off the DH Heater During Perigee Passages.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
Chandra X-Ray Observatory CXC ACIS Ops team March 27, Controlling the ACIS FP Temperature: Turn Off the ACIS DH Heater ACIS Ops Team.
START NICMOS COOLING SYSTEM ACTIVITY SUMMARY. 1/25/01Ken Pulkkinen2 START NCS ACTIVITY Applicable SMOV Requirements: J NICMOS Cooling System.
Prox-0.3 Georgia Institute of Technology Kiichiro DeLuca Richard Zappulla Matt Uhlman Ian Chen 1.
SPIE Astronomical Instrumentation June 26, 2008 Physics of reverse annealing in high- resistivity ACIS Chandra CCDs Catherine E. Grant (MIT) Bev LaMarr,
Prox-0.3 Georgia Institute of Technology Kiichiro DeLuca Richard Zappulla Ian Chen Matt Uhlman 1.
 V s /V p = N s /N p  I p V p = I s V s  I p /I s = V s /V p = N s /N p  V s = (N s /N p )V p  I s = (N p /N s )I p  P = VI; I = P/V (I.
Boiler Energy Saver Advanced Boiler Controls. Most boiler controls at present consist of a switch!
All Freezer Advance. When the Freezer is first supplied with power or if a power outage occurs, the display will indicate this by flashing the temperature.
4-8  Turn in Project  Notes on Homeostasis and Human Body systems  Foldable on human body systems  Homefun: Finish the foldable at home.
CMS CO 2 Cooling Test Stand Capacity and Load Disruption Tests Simon Kwan Erik Voirin Simon Kwan, Erik Voirin1CMS CO2 Cooling Test Stand Test Results.
Starter: use Pg to complete the table
Figure 28.1 A typical engine coolant temperature (ECT) sensor.
FIGURE 20–1 A typical engine coolant temperature (ECT) sensor
Rose Navarro HMI Lead Thermal Engineer
FIELDS MEP Thermal Vacuum Cycling iPER
Electricity Friction
Gayle K. Martin November 14, 2016
General wiring drawing /
Electronic Components
LAT Requirements Verification in TVAC
Start program Start Start Time Duration Counter.
An {image} series circuit has {image} , {image} , and {image}
Launch and On-orbit Checkout
Comparator Circuits AIM:
Figure A typical engine coolant temperature (ECT) sensor
Measuring Temperature Part 2
Cryogenics – The Basics
Automotive Technology Principles, Diagnosis, and Service
Presentation transcript:

Chandra X-Ray Observatory CXC ACIS Ops team November 1, Controlling the ACIS FP Temperature: Turning off the DH Heater During Perigee Passages ACIS Ops Team

Chandra X-Ray Observatory CXC ACIS Ops team November 1, New Proposed Test turn off the DH heater for an entire perigee passage monitor the Camera Body side A/B temperatures (1CB[AB]T) If both side A and B read C or colder, contingency response is to turn the DH heater back on Success Criteria Change to Standard Operations The Camera Body side A (1CBAT) C and side B (1CBBT) C for the duration of the test turn off the DH heater for all perigee passages If the test above is successful:

Chandra X-Ray Observatory CXC ACIS Ops team November 1, Summary of DH Cooling Tests Minimum Temperatures and Fit Results

Chandra X-Ray Observatory CXC ACIS Ops team November 1, Summary of DH Cooling Tests proposed test is most similar to the first test and NOT like the other tests during the CDF-S observations in which the SIM is at the ACIS position first test resulted in a minimum temperature of C for both 1CBAT and 1CBBT in 37 ks extrapolation of first test predicts temperatures of 1CBAT=-71.6 C and 1CBBT=-70.0 C after 56 ks 90% CL on asymptotic temperatures is 1CBAT=-80.3 C and 1CBBT=-74.6 C primary survival heater should turn on at C and secondary survival heater should turn on at C

Chandra X-Ray Observatory CXC ACIS Ops team November 1, DePasquale (SAO), Vogrin predicts a steady state temperature of -69 to -71 C at the HRC position and pitch angle of ~150 First ACIS DH Cooling Test: Perigee Passage How fast can the Camera Body get cold ? Begin End

Chandra X-Ray Observatory CXC ACIS Ops team November 1, Side B temperature, 1CBBT First ACIS DH Cooling Test: Perigee Passage How fast can the Camera Body get cold ? Begin End

Chandra X-Ray Observatory CXC ACIS Ops team November 1, DePasquale (SAO), commanded by SOP_61014_DA HTR_B_ON DH heater draws a maximum of 60 W, survival heaters draw 22 W If the survival heater turns on, side A should respond faster than side B First ACIS DH Cooling Test: Heating How fast does the Camera Body warm ?

Chandra X-Ray Observatory CXC ACIS Ops team November 1, Detector Housing Survival Heater Geometry HR7, HR8: V Prime survival °C Rdnt survival °C Better than 1.19 °C accuracy -70 °C ) for 1YA94 SSTS that controls survival heater Located on +Z face of Detector Housing (side A, 1CBAT) Closest telemetry thermistor is 1CBAT (FM07) Heater description Pr or Red Htr Bus Enable Cmd Disable Cmd Heater Flight Telemetry Mnemonic Heater Power at 29 volts (watts) Heater Resistance (ohms) Heater Close Set Point Temp (°C) Heater Open Set Point Temp (°C) Primary Heater Monitor Thermistor Mnemonic Backup Heater Monitor Thermistor Mnemonic ACIS Det. Hsg. Survival PR2NA CBAT1CBBT ACIS Det. Hsg. Survival RD7NA CBAT1CBBT Trinh(NGST)

Chandra X-Ray Observatory CXC ACIS Ops team November 1, One Concern primary survival heater fails to turn on thermostat for primary survival heater turns on at a temperature less than C (how close are the temperatures read out by 1CB[AB]T and the survival heaters ?) SCS 107 interrupts the load before the command to turn the DH heater back on is executed and one of the above is true The ACIS Camera Body and the Fid Lights get colder than C. Fid Lights should not be allowed to drop below C. How could this happen ?

Chandra X-Ray Observatory CXC ACIS Ops team November 1, Implementation -- DH heater will be commanded on and off in the load (has been executed 6 times in the load) -- realtime COMs will be provided to monitor the Camera Body temperature during the second half of the perigee passage. FOT MP has identified COMs on DOY 2007: contingency CAP to execute SOP_61014_DAHTR_B_ON will be ready to run TimeElapsed TimeEvent 323:07:000.0DH side B heater is turned off 323:13: sAOS, verify heater is off 323:14: sLOS 323:15: sAOS, verify temperatures 323:16: sLOS 323:21: sAOS, verify temperatures 323:22: sside B heater turned on 323:23: sLOS

Chandra X-Ray Observatory CXC ACIS Ops team November 1, Telemetry Verification Camera Body temperature 1CBAT/1CBBT digitization is ~2.47 C C C C C C C C 1CB[AB]T C, primary survival heater set point C, secondary survival heater set point C, must not drop below side A (1CBAT) cools faster than side B (1CBBT) side B (1CBBT) warms faster than side A when the DH heater is used side A (1CBAT) should warm faster when the survival heater is used

Chandra X-Ray Observatory CXC ACIS Ops team November 1, Telemetry Verification Five possible cases: 1)1CBAT > C and 1CBBT > C -- allow test to proceed 2)1CBAT = C and 1CBBT > C -- allow test to proceed 3)1CBAT > C and 1CBBT = C -- allow test to proceed 4)1CBAT = C and 1CBBT = C -- terminate test 5)1CBAT < C and 1CBBT < C -- terminate test

Chandra X-Ray Observatory CXC ACIS Ops team November 1, Turn the DH Heater Off for Future Perigee Passages Keeping the Camera Body colder will keep the FP temperature colder If the proposed test is successful, we want to turn off the DH heater for all perigee passages Limit Changes MnemonicCurrent Yellow LowNew Yellow LowCurrent Red LowNew Red Low 1CB[AB]T-70.5 C-72.2 C-75.5 C-74.7 C Camera Body Temp 1DAHBCU0.80 A0.0 A0.20 A0.0 A DA Htr Current B 1DAHBVO10.5 V0.0 V3.5 V0.0 V DA Htr Voltage B 1DAHHBVO25.0 V0.0 VN/A/N/A DA Htr Input Voltage B 1DAHTBENEnbN/A DA Htr B Enb/Dis 1DAHTBONOnN/A DA Htr B On/Off