GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 1 GLAST Large Area Telescope: MGSE Status Report Eric Gawehn SU-SLAC I&T MGSE Engineer

Slides:



Advertisements
Similar presentations
Far Detector Assembly Block Pivot Table Design Review WBS Dave Pushka April 2 nd 2008.
Advertisements

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 7.1 Stress Analysis 1 GLAST Large Area Telescope:
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Safety Overview.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
Where to put Towers A and B in the Grid – technical issues 18-Jan-2005 L. Wai (SLAC/Group K) for LAT I&T.
1 TCS Lab Motors-2 (10/20/03) Design Changes since Version-1 1)Changed Encoder: now using R135S-03600Q-5L16C18TP-04EN 2)Eliminate Outriggers: Retain bolts.
Preliminary Design Review Week 7 Group A3: HMS “Bloodhound” Matt Prygoski Matt Morris Jay Slaggert Fred Thwaites Dan Zibton Thursday March 20, 2008.
Senior Design: Validation of Design December 15, 2008.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
Page 1 GLAST LAT ProjectAugust 30, 2004 GLAST Large Area Telescope: LAT Accelerometer and Thermal Instrumentation Review Presented by Leonard Lee John.
1 GLAST LAT Arrival at Spectrum Assuming That the LAT Transport Container Arrives on Flatbed Truck Question: Can Transport Cover Support Crane Lift With.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
TIS Review 13 Dec Bill Elliott IR ABSORBER STATUS1 Bill Elliott LBNL Presented at the TIS SAFETY REVIEW 13 Dec Berkeley,CA brookhaven - fermilab.
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 1 GLAST Large Area Telescope: I & T Peer.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
GLAST Large Area Telescope:
STARLight PDR 3 Oct ‘01 F.1.1 Rashid STARLight STARLight Mechanical Tahir Rashid STARLight Mechanical Engineer (734)
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems X-LAT Assy1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
LATLAT Beam Test Workshop 20th March GLAST Program Beam Test Workshop CU Outer Shipping Container Michele Pinchera
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
LATLAT CU Beam Test 3rd May GLAST Program CU Beam Test CU Integration Francesco Nicola
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Thermal-Vacuum Testing LAT Environmental Test.
NRL Pathfinder Planning Meeting1 GLAST LAT Project07 September 2005 NRL Pathfinder Planning Meeting Dynamics Testing Update NRL Pathfinder Planning Meeting.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
CLIC Permanent Magnet Quadrupole Engineering Development of second family member Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 07/11/2012.
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
GLAST LAT ProjectMarch 08, 2004 Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation]
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Environmental Test MGSE Design Concepts Rev 1.
GLAST LAT Project Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation] –A)
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Thermal-Vacuum Test Configuration.
TVAC Trolley Design Review1 GLAST LAT Project8 September 2005 TVAC Trolley Design Status Review 8 September 2005 TVAC Trolley Design Status Review 8 September.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
1 PFDPU Mechanical Packaging PEER REVIEW MAVEN PFDPU Particle and Fields Data Processing Unit Mechanical Packaging and Design Overview May 09, 2011 Bill.
LAT Transport Container1 GLAST LAT Project8 September 2005 LAT Transport Container Design Review 8 September 2005 LAT Transport Container Design Review.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
GLAST LAT Project IFC Tour – Sep 5,2003 Larry Wai 1 GLAST Large Area Telescope: Integration and Facility Status Larry Wai SU-SLAC Integration and Facility.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 1 GLAST Large Area Telescope:
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDec 17, 2003 Page 1 GPR Design & Requirements Grid Perimeter Ring (GPR) Design –Ring is comprised of four lengths of Aluminum bolted together.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Installation Walkthrough Image Guide
Mechanical Integration
GLAST Large Area Telescope:
LAT Pre-Environmental Test Plan
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
1. Introduction and Overview
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Introduction and Overview
GLAST Large Area Telescope:
Design Integration and Analysis
GLAST Large Area Telescope: Deputy for Systems Engineering
Presentation transcript:

GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 1 GLAST Large Area Telescope: MGSE Status Report Eric Gawehn SU-SLAC I&T MGSE Engineer Gamma-ray Large Area Space Telescope

GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 2 MGSE Overview Total of about 30 MGSE items to be produced for LAT integration Hardware –In this presentation only the main items will be addressed LAT Rotation Stand LAT Support Fixture for the Grid Perimeter Ring (GPR) LAT Transport Container 90º Support for Van de Graaff (VDG) Tests –Remaining MGSE items are about 50% complete Drawings –Critical Path Detail Drawings are 70% complete (goal is to have all finished by Design Review) –Detailed drawings are 50% complete Remainder is being held up until formal stress analysis is completed

GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 3 LAT Rotation Stand – Personnel Access Platform Design Philosophy –Provide more parallel work area in the Integration Hall –Minimize mechanical preparation for Flight work Ops Status –Two Concepts for Personal Access Platform are completed ( no major issues at this point) Primary minimizes impact to work area, but adds about $17K to Rotation Stand (delays final dwgs by ~ 15 days Second impacts work area and time for mechanical preparation Ops and may cost ~ $8K Issues –See Concept Views Views do NOT imply detail dwg maturity; much work to do

GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 4 2,743 mm [ 108 inches ] Wide 4,420 mm [ 174 inches ] Long LAT Rotation Stand Interference with Grid Perimeter Ring is now being worked out

GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 5 Heater Control Box Connector Clearance Heater Control Box Connectors Shown De-Mated 0.87” This Connector May Require a 90º Strain Relief Grid Perimeter Ring to Grid Bracket Grid Perimeter Ring - Z

GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 6 GPR with Heater Control Box Side View

GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 7 A-Frame Rotation Stand with Low Cost PAP* * PAP – Pesonnel Access Platform

GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 8 A-Frame LAT Stand with Low Cost PAP B-33, Rm 104 Integration Hall Crane Structure B-33 Beam; Not in Rm Top Looking Down View LAT A-Frame Integration Stand Low Cost Stand Takes Up Most of the Rm

GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 9 Refined Rotation Stand with PAP

GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 10 Box Frame Stand with PAP, Small

GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 11 LAT Support Structure; GPR Design Philosophy –Bolt together frame with fairly precise bracketry Status –Concept is well understood –Stress Analysis completed and shows compliance to EWR ( > 5 x against Ultimate ) The bracket clevice analysis needs 1 final iteration Issues –Interference with heater control box connector is resolved Need to assess access for removal of Clevice Pin

GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 12 GPR Complete Image in work

GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 13 LAT Transport Container Design Philosophy –Attempting to fit in 88” Truck Taller and more narrow version adds $20-30K for engineering and mass plate –Have a concept that works but requires additional ~ $20K for non-std truck width for cross-country ride to NRL Isolation system appears satisfactory Work in progress –Layout is in work; may not be available next week –Vibration report by next week – (First Iteration, expect another iteration for final design to follow) Issues

GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 14 Other Important Items Vibration Test Fixture –Have SC Bracket Dwg; We are building model –Stress indicates four small interface brackets to NRL shaker will work No need for $20K large interface plate Environmental NRL –Expect MGSE Concept for TVAC and EMI ready for presentation next week ( detail dwgs ~ 80% complete ) –Need feedback from NRL NRL needs to define Cold / Hot Plate Heat Exchanger Sizing and plumbing Need sizes to determine if Heat Ex’rs can be safely slid into place ( Eric believes they can ) Single Tower Airplane Test –MGSE on hold until PAP is more mature Can be worked if additional designer is available

GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 15 Summary Need Authorization to Proceed for: –Purchase of long lead items GPR frame pieces GPR to Grid attach bracketry Support Shaft Materials and Machining Bearings Rotation Drive, Flex Coupling & Drive Motor –Rotation System Weldment –LAT Lift Spreaders Z Axis Vertical (analysis in work) Z Axis Horizontal (analysis in work) –Proof Test Hardware Design to begin after GPR ATP