Concept for the New Detector Chamber at the ESR Ion beam Internal Target Region  Lab *)  Flange axis Covered  range Flange size in mm A90° – 80°83°95°

Slides:



Advertisements
Similar presentations
1Beam Line Review. 17th November Detector parameters Fermilab Beam line monitors built to replaced SWICS Scintillating fibre tracker – readout.
Advertisements

Direct measurement of 4 He( 12 C, 16 O)  reaction near stellar energy Kunihiro FUJITA K. Sagara, T. Teranishi, T. Goto, R. Iwabuchi, S. Matsuda, K. Nakano,
Study of two pion channel from photoproduction on the deuteron Lewis Graham Proposal Phys 745 Class May 6, 2009.
The new VERTEX 70v: Subtitle
AESOP: Accurate Electron Spin Optical Polarimeter Marcy L. Stutzman, Matt Poelker; Jefferson Lab Timothy J. Gay; University of Nebraska.
Satoshi Mihara ICEPP, Univ. of Tokyo Feb MEG Review Meeting 1 CEX beam test at piE1 Satoshi Mihara.
New particle ID detector for Crystal Ball at MAMI-C Daniel Watts, University of Edinburgh John Annand 1, B. Briscoe 3, A. Clarkson 2, Evie Downie 1, D.
NUMI NuMI Internal Review July 12, 2001 Infrastructure: Radiation Safety Page 1 Technical Components NuMI Beamline Radiation Safety Issues Radiation Safety.
New IP chamber for ATF2 goal 2 Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 Technical Review KEK, 3-4.
Experimental Setup of the H8-RD22 Experiment Massimiliano Fiorini (on behalf of the H8-RD22 Collaboration) University of Ferrara – INFN Ferrara CARE HHH.
V.Grishin, A.Koshelev, A.Larionov A.Pushkarev, V.Seleznev, M.Sleptsov A.Sytin.
PEP-II Machine Advisory Committee Meeting SLAC, April 15-17, 2004 HOM Issues in LER Ring and IR. Recent measurements and calculations. Sasha Novokhatski.
2007’ One classical method - Multiplicity in N-N collisions at SPS/CERN J.T.RheeKonkuk-University.
LAPPD Collaboration Meeting 12/10/2011 Ossy Siegmund, Experimental Astrophysics Group, Space Sciences Laboratory, U. California at Berkeley 20cm Sealed.
PSI - February 3, 20031F. Sergiampietri MEG – PMT cryogenic test: PURPOSES -SYSTEMATIC TEST OF THE PMT’s FOR MEG IN OPERATING CONDITIONS -BUILD AN EVOLUTIVE.
 -capture measurements with the Recoil-Separator ERNA Frank Strieder Institut für Physik mit Ionenstrahlen Ruhr-Universität Bochum HRIBF Workshop – Nuclear.
Institute of Atomic and Molecular Sciences, Academia Sinica, Taiwan National Taiwan University, Taiwan National Central University, Taiwan National Chung.
The new set of MWPCs for CB Collaboration Meeting Glasgow March 2006 A. Braghieri, P.Pedroni.
Experimental part: Measurement the energy deposition profile for U ions with energies E=100 MeV/u - 1 GeV/u in iron and copper. Measurement the residual.
G5 Beam Line Vacuum System. G5 Beamline Vacuum System Design  Bakeable and Particulate free to Class 100 Clean Room quality Require Clean room QA and.
CesrTA EC Build-Up and Mitigation Program - Introduction Mark Palmer June 25, 2009.
HPS T EST R UN C ONTINGENCY P LAN S. Stepanyan JLAB.
Peter Spiller, COLMAT-Kick off meeting, Cryo-Collimator, CERN, COLMAT Kick-off meeting CERN Peter Spiller Cryo-Collimator (Catcher) for.
Peter Spiller, GSI, ICFA workshop, Optimization of SIS100 Lattice and Dedicated Collimation System P. Spiller, GSI ICFA 2004 Bensheim
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Secondary Ion Mass Spectrometry A look at SIMS and Surface Analysis.
Implantation of heavy ions 86 Kr and 132 Xe in emulsion with energy 1.2 A MeV K.Z. MAMATKULOV LHEP, JINR, Dubna, Russia. DjPI, Uzbekistan. “Workshop on.
Status of MAMI C Hans-Jürgen Arends CB-Meeting, Basel October 4-6, 2006.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
First Experiments with the Polarized Internal Gas Target (PIT) at ANKE/COSY Ralf Engels for the ANKE-Collaboration Institut für Kernphysik, Forschungszentrum.
1.Placement of support base for 70 degree-dipole magnet(D) ・ Support base for 70 degree-dipole magnet(D) should be placed horizontally with a spirit level,
Mechanical Integration for the AD at LNL. Overview New reaction chamber and beam-line Telescopic Beam Line Beam Dump Summary.
- 9 th Sep Introduction Gas-Jet Simulations Experimental Setup Massimiliano Putignano Development of a Beam Profile Monitor Based on a Supersonic.
Summary of RIKEN visit. Chamber Top plate Bottom plate Middle cylinder.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
A. Nass, M. Chapman, D. Graham, W. Haeberli,
BL SAXS End Station (Small Angle X-ray Scattering)
The Polarized Internal Gas Target of ANKE at COSY
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
Conclusions References 1. A. Galimberti et al., Nucl. Instrum. Meth. A 477, (2002). 2. F. Capotondi et al., Thin Solid Films 484, (2005).
Performed at Brookhaven National Lab for Fermilab Main Injector Electron Cloud Studies June 2009 Linda Valerio September 11, 2009.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
Vacuum conditions in PANDA pbar-line Alexander Gruber, SMI, Vienna, Austria.
PANDA Target Pipe Meeting Alfons Khoukaz Institut für Kernphysik, WWU Münster, Germany PANDA Target Pipe Meeting February 2013.
6/26/2016 The Heavy Ion Fusion Science Virtual National Laboratory 1 09/17/2008 Fluorescence diagnostic at NDCX results and prospects F. Becker 1, P. Hauville.
Integration of forward physics detectors into the LSS of the LHC D. Macina (TS/LEA) Technical Support 2004 Workshop.
New single-chip “box” to test laser soldering in vacuum WP6 meeting, 16/01/14.
for the HADES Collaboration
Vacuum System P. Chiggiato TE-VSC
K-x-ray Emission in Fast O5+ on Ar Collisions
Antiproton-proton elastic scattering as a day-1 experiment at HESR
MECHANICS OF THE FORWARD STRAW TUBE TRACKER (preliminary) Federico Evangelisti INFN - Ferrara GSI - 7/11 dicember 2009.
The Budker Institute of Nuclear Physics
Beam Delivery Systems and the Machine-Detector Interface Terms of Reference for the CLIC-ILC Collaboration Working Group B. Parker (BNL), D. Schulte.
IHEP group Shashlyk activity towards TDR
EBTF Design Review Technical Meeting Group
Polarimetry Ken Livingston Sept 2012
N-TOF EAR2 - Vertical beam design & construction - Irradiation facility proposal S. Girod EN-EA.
sub-femtosecond correlated dynamics probed with antiprotons
Muon pairs in HPS with m+ trigger
Magnetic gap calculation
Geometry of experimental setup for studies of inverse kinematics reactions with ROOT Students*: Dumitru Irina, Giubega Lavinia-Elena, Lica Razvan, Olacel.
XFEL Collimation and Beam Switchyard Vacuum Issues
Hall C – this week Time Period Plans 10/24-10/27 Target cool down
Additional Upstream Coil Shielding
Gas cell apertures with dimensions (original)
Beam Halo Considerations for Back Angle Running
BGC Collaboration Meeting –
Presentation transcript:

Concept for the New Detector Chamber at the ESR Ion beam Internal Target Region  Lab *)  Flange axis Covered  range Flange size in mm A90° – 80°83°95° - 73°Ø250 B80° – 75°83°95° - 73°Ø250 C75° – 45°60°71° - 52°Ø 250 D45° – 10°0°28° - 18°200x250 E'120° –91°109°98° - 118°Ø250 L180°136,5° – 43,5° **) 200x250 Detector Chamber Part (DC) Interaction Chamber Part (IC) *) according to the angular regions A – E' defined in the Technical Proposal Region A Region D Region C Region B Region E' Flange D Flange E' Flange AB Flange C Flange L

Concept for the New Detector Chamber at the ESR Interaction Chamber Part View against beam directionSide view Flanges for observation, mounting detectors close to 0° and apertures upstream and downstream to the internal Target Active vacuum aperture devices for differential pumping UHV- Measurement Full Setup of the combined IC and DC Detector Chamber Part Side view UHV- Measurement PMTs for target monitoring

Concept for In-Ring Tagging Detectors at the ESR ESR Gas jet target with experimental setup