Outcome from 2011 Chamonix workshop New structure of the SPSU Study Group E. Shaposhnikova 17.02.2011 17/02/20111SPSU meeting.

Slides:



Advertisements
Similar presentations
Expected performance in the injectors at 25 ns without and with LINAC4 Giovanni Rumolo, Hannes Bartosik and Adrian Oeftiger Acknowledgements: G. Arduini,
Advertisements

Review of 2011 studies and priorities for 2012 LIU-SPS-BD.
Thomas Roser Muon collaboration meeting February 8-10, 2002 AGS beam intensity upgrades What has been achieved Sextupole power supply upgrades Bunch manipulation.
H. Damerau, S. Hancock, LHC Beam Studies Review 28/08/2012 PS: the Longitudinal Plane 1 H. Damerau, S. Hancock LIU Beam Studies Review Meeting 28 August.
Bunch Flattening with RF Phase Modulation T. Argyropoulos, C. Bhat, A. Burov, J. F. Esteban Müller, S. Jakobsen, G. Papotti, T. Pieloni, T. Mastoridis,
LHC Machine Upgrades L. Ponce On behalf of the LHC Operation Team 1.
Summary and outcome of the 1st LIU-HL-LHC brainstorming meeting (24 th June 2011) Mike Lamont This event is jointly organized by the HL-LHC and LIU projects.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
Theoretical studies of IBS in the SPS F. Antoniou, H. Bartosik, T. Bohl, Y.Papaphilippou MSWG – LIU meeting, 1/10/2013.
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
T. Argyropoulos, LIU /04/2013 Progress in the SPS: RF studies and beam quality T. Argyropoulos, T. Bohl, J. E. Muller,, H. Timko, E. Shaposhnikova.
HL-LHC/LIU Joint workshop Goal: Progressing towards an agreed set of 450 GeV beam parameters for High Luminosity operation in LHC after LS2 & LS3. Slides.
Update of achievable beam characteristics at injection in LHC H.Bartosik, C.Bracco, O.Brüning, C.Carli, K.Cornelis, H.Damerau, R.Garoby, S.Gilardoni, B.Goddard,
Intensity Upgrade Plans for CERN/LHC Injector Complex
Do We Really Need the LHC Luminosity Upgrade? O. Brüning Many thanks for help from: Ralph Assmann, Gianluigi Arduini, Christian Carli, Elena Chaposhnikova,
0 1 Alternative Options in the Injectors – Preliminary Summary H. Damerau LIU-TM#8 18 October 2013 Many thanks for discussions and input to T. Argyropoulos,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Production of bunch doublets for scrubbing of the LHC J. Esteban Muller (simulations), E. Shaposhnikova 3 December 2013 LBOC Thanks to H. Bartosik, T.
Evian 2014 historical perspective run 1: 2010: L peak >10 32 cm -2 s -1  2x10 32 cm -2 s : produce >1 fb -1  delivered.
Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,
Flat-beam IR optics José L. Abelleira, PhD candidate EPFL, CERN BE-ABP Supervised by F. Zimmermann, CERN Beams dep. Thanks to: O.Domínguez. S Russenchuck,
Lessons from SPS studies in 2010 E. Shaposhnikova Chamonix’11 session 09: LHC injectors upgrade.
Status of the LHC: Past, Present and Future 24th Rencontres de Blois May 27, 2012 Sergio Bertolucci CERN LHC.
E.M, PS-OP shut-down lectures, 20/02/ u Requirements of the LHC on its injectors u What are the nominal & already achieved beams at PS exit? u How.
Future Upgrade Scenarios for the Injector Complex Upgrade possibilities in the SPS E. Shaposhnikova for SPSU SG LHC Performance Workshop – Chamonix,
Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Elias Métral, ICFA-HB2004, Bensheim, Germany, 18-22/10/ E. Métral TRANSVERSE MODE-COUPLING INSTABILITY IN THE CERN SUPER PROTON SYNCHROTRON G. Arduini,
Elias Métral, SPSU Study Group and Task Force on SPS Upgrade meeting, 25/03/2010 /311 TMCI Intensity Threshold for LHC Bunch(es) in the SPS u Executive.
News on TMCI in the SPS: Injecting high intensity bunches Benoit for the MD team: T. Bohl, K. Cornelis, H. Damerau, W. Hofle, E. Metral, G. Rumolo, B.
US High Luminosity LHC with Large Piwinski Angle Scheme: A Recent Look C. M. Bhat Fermilab/CERN 1 st HiLumi LHC/LARP Collaboration Meeting November 16-18,
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
Elias Métral, LHC Beam Commissioning Working Group meeting, 30/11/2010 /241 PRELIMINARY FINDINGS FROM INSTABILITY MEASUREMENTS DURING THE 75ns AND 50ns.
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2015 O During year - 9 meetings of LIU-SPS BD WG (as in 2013, but 10 in 2014 and 12 in.
Momentum slip-stacking of the nominal I-LHC beam in the SPS Particle simulations (preliminary) T. Argyropoulos, E. Shaposhnikova LIU-SPS BD WG 30/01/2014.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Machine Progress Towards Higher Luminosity Frank Zimmermann CMS Upgrade Meeting FNAL, Chicago, 7 November 2011 (via EVO) Thanks to Martin Aleksa, Gianluigi.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2013 O During year - 9 meetings of LIU-SPS BD WG (less than usual 12 in the past :-)
RF measurements during floating MD in Week 40 3 rd of October 2012 LIU-SPS BD WG 25/10/2012 Participants: T. Argyropoulos, H. Bartosik, T. Bohl, J. Esteban.
Progress on e-cloud effects (PS and SPS) G. Iadarola, H.Bartosik, G. Rumolo, M. Taborelli, C. Yin Vallgren Many thanks to: G. Arduini, T. Argyropoulos,
High Intensity Beams in Existing Accelerators for CN2PY: SPS studies, PS issues E. Shaposhnikova Laguna-LBNO General Meeting CERN, Acknowledgments:
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Outcome of beam dynamics simulations - Scenarios, requirements and expected gains s LIU-SPS Coordination meeting 26/08/2015 A. Lasheen, E. Shaposhnikova,
LIU-SPS Beam Dynamics WG E. Shaposhnikova LIU-SPS coordination meeting
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
US Dependence of e-Cloud on the Longitudinal Bunch Profile Studies in the PS & Extension to the HL-LHC C. M. Bhat Fermilab/CERN H. Damerau, S. Hancock,
Longitudinal Limitations of Beams for the LHC in the CERN PS 0.
Update on RF parameters A.Lachaize11 th HPPS design meeting04/09/13.
PS beam dynamics issues in view of LHC beams upgrade: brief status and prospects G. Rumolo (Beam Dynamics for the PSB/PS Upgrade Working Groups), based.
Pros and Cons of the 200 MHz System G. Iadarola, K. Li, E. Metral, G. Rumolo Thanks to: L. Medina, J. Esteban Mueller, B. Salvant, E. Shaposhnikova, R.
LHC Injectors Upgrade Project 11/11/2010 R. Garoby.
LIU-PS Beam Dynamics Working Group Introduction and objectives
Beam Instability in High Energy Hadron Accelerators and its Challenge for SPPC Liu Yu Dong.
Harmonic system for LHC
Harmonic system for LHC
Longitudinal impedance of the SPS
Longitudinal beam parameters and stability
Update on the HiLumi/LIU parameters and performance ramp up after LS2
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Machine Progress Towards Higher Luminosity
The SPS 800 MHz RF system E. Shaposhnikova for BE/RF
News on TMCI in the SPS: Injecting high intensity bunches
Beam dynamics requirements after LS2
Collective effects in the SPS and LHC (longitudinal plane)
Summary of session 9: "LHC Injectors Upgrade"
Presentation transcript:

Outcome from 2011 Chamonix workshop New structure of the SPSU Study Group E. Shaposhnikova /02/20111SPSU meeting

New structure of the SPSU SG SPS Upgrade is a part of the LIU project (leader - R. Garoby, deputy - M. Meddahi) SPS Upgrade coordination - B. Goddard (deputy - E.S., scientific secretary - G. Rumolo ) – more information at the next SG meeting Mitigation of e-cloud (coatings and electrodes) will be studied by separate WG chaired by M. Jimenez (TE/VAC) SPSU SG will be responsible for all Beam Dynamics studies (calculations, simulations, measurements, data analysis) related to the SPS upgrade: SPSU SG → SPSU-BD SG scientific secretary – B. Salvant convener – E. S. new web site? 17/02/20112SPSU meeting

Is it a good name? Google tells… SPSU: Worst Schools Reviewed - Home - [ Diese Seite übersetzen ] Find out why one should avoid SPSU and choose an alternative for higher education… -Diese Seite übersetzen 17/02/20113SPSU meeting

And what about BD? (Beam Dynamics or Bande Dessinee?) 17/02/20114SPSU meeting

Proposed membership for SPSU-BD SG G. Arduini (optics, LHC) T. Argyropoulos (double RF) H. Bartosik (low γ t ) T. Bohl (RF, MDs) F. Caspers (impedance) K. Cornelis (OP, MDs) W. Hofle (FB, MDs) E. Metral (impedance) J. Muller (MDs, long. HOM) Y. Papaphilippou (optics, low γ t ) G. Rumolo (e-cloud) M. Taborelli (e-cloud) B. Salvant (MDs, impedance) E. Shaposhnikova (convenor) plus C. Bhat (LARP) N. Monet (multi-bunch) H. Maury Cuna (e-cloud) N. Biancacci (impedance) 17/02/20115SPSU meeting

LHC beams in SPS Beam parameters 450 GeV/c (intensity maximum injected minus losses) nom bunch spacingns indiv max bunch intensity number of bunches4x724x364x243x724x36 1 total intensity on FT long. emittanceeVs norm. h/v emittanceμmμm * ~10? * double batch injection in PS: 1.1/1.4 17/02/2011SPSU meeting

LHC Performance Estimates 7Chamonix, January 2011 Oliver Brüning BE-ABP Parameternominal 25ns50ns N1.15E+111.2E+111.7E+11 nbnb beam current [A] x-ing angle [  rad] beam separation [  ] 10  * [m]  n [  m]  L [eVs] energy spread1.00E-04 bunch length [m]7.50E-02 IBS horizontal [h]80 -> IBS longitudinal [h]61 -> Piwinski parameter geom. reduction beam-beam / IP3.10E-033.1E-034.4E-036.6E-03 Peak Luminosity nominal emittancesmall emittance Performance reach for existing 7 TeV: Radiation damping: hor: 26h ver: 13h

LHC Performance Estimates 8Chamonix, January 2011 Oliver Brüning BE-ABP Parameternominal 25ns50ns 25ns 50ns N1.15E+112.0E+113.3E+112.0E E+11 nbnb beam current [A] x-ing angle [  rad] beam separation [  ] 10  * [m]  n [  m]  L [eVs] energy spread1.00E-04 bunch length [m]7.50E-02 IBS horizontal [h]80 -> IBS longitudinal [h]61 -> 6021 Piwinski parameter geom. reduction beam-beam / IP3.10E-034.5E-034.9E-037.7E-38.6E-3 Peak Luminosity small  *‘large’  * Performance reach for LINAC4 + LIU + HL triplet:

intensity & emittance from injectors spacing [ns] bunch intensity [10 11 ] transv. rms norm. emittance [  m] nominal available “now” available “now” available “now” w LINAC w LINAC w LINAC4+LIU w LINAC4+LIU talk by O. Bruning could we get 20% more? HL-LHC class F. Zimmerman:

High priority studies in 2011 ultimate intensities at 50 ns and 25 ns bunch spacings losses: statistics → J. Muller, optimisation - everybody e-cloud with intensity and injected trans. emittance → G. Rumolo beam parameters at extraction: – long. → J. Muller, – trans. → K. Cornelis (tbc) transverse emittance blow-up (nominal optics) origin for single bunch (simulations and meas.) → B. Salvant multi-bunch at different spacings → C. Bhat (leaving…) low gamma transition optics optics optimisation during nominal LHC cycle (21.6 s) → Y. Papaphilippou long. stability, voltage program and required long. controlled emittance blow-up for coupled-bunch instabilities → E. S. space charge limit (single bunch measurements) → H. Bartosik effect on e-cloud instabilities → G. Rumolo 17/02/201110SPSU meeting

High priority studies in 2011 – cont. Long. beam stability in a double RF system – single bunch stability → T. Argyropoulos – optimum phase offset during cycle → T.A. Impedance identification: – transverse → E. Metral/B. Salvant/N. Biancacci – longitudinal HOM → J. Muller + N. Monet Beam loading in the 200 MHz RF system: – limitations, optimum voltage partition → T. Bohl Low harmonic RF system in the SPS for PS-SPS transfer optimisation → E.S. … 17/02/201111SPSU meeting

Nominal intensity now VoltagePower 17/02/2011SPSU meeting12

Ultimate intensity (based on 2010 experience with 25 ns beam) VoltagePower 17/02/2011SPSU meeting13

Power/cavity in 4- & 5- section cavities with P 4 =P 5 (but V 4 ≠ V 5 ) nominal intensity & 0.5 eVsultimate intensity & 0.6 eVs 17/02/2011SPSU meeting14