24 May 2005C. Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz Puneeth Kalavase Jim Lamb assembly testing
24 May 2005C. Campagnari (UCSB)2 Bottom Line Summary Rod production stopped since May 5 th pending resolution of I 2 C errors Much effort here and at FNAL trying to pinpoint the problem with assistance from CERN –Not much progress –Expect CERN experts "soon" Other progress: –chiller moved, loss of fluid problem seems fixed –continue work on cut tuning for bad channel flagging
24 May 2005C. Campagnari (UCSB)3 Summary of tests done at UCSB and FNAL