24 May 2005C. Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz.

Slides:



Advertisements
Similar presentations
SiD PFA Status and Calorimeter Performance Ron Cassell (SLAC) SiD Design Study Meeting 11/15/08.
Advertisements

MPI Forum Suggestions for Additions to the Voting rules March 2015.
14 June 2005C. Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz.
Power supply cable Charge injection 3 channels readout (external cables to the scope) 3 channels readout (internal cables) Set up for reading two cards.
US Tracker Production Meeting, March 8, 2005 J. Incandela 1 Slides for the US Si Tracker Weekly Production Meeting J. Incandela March 8, 2005.
Rods Schedule and Issues J. Incandela University of California Santa Barbara for the TOB Rod Group Tracker Integration Meeting October 27, 2005 Slides.
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 4 August 2003 Sam Burke UCSB HEP Group.
UCSB CDF Group, DOE Site visit, Jan 18, J. Incandela 1 Top Physics at CDF ++ Top Quark and New Physics with an eye toward the LHC Work completed.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
Slide 1UCSB Rod Production presented by Jim LambDOE review, January 20, 2004 UCSB Rod Production UCSB Rod Production, Jan , presented by Jim Lamb.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 28 July 2003 Sam Burke UCSB HEP Group.
6/23/2005 Claudio Campagnari, weekly US rod meeting 1 New Development: Tentative Plan for Rod Production As relayed to me by Joe, following the discussion.
3 May 2005Claudio Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last two weeks Reporting for: Dan Callahan Susanne Kyre Stephen.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 10 June Sam Burke UCSB HEP Group.
28 June 2005C. Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 7 July 2003 Sam Burke UCSB HEP Group.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
Status of TOB Modules & Rods J. Incandela For the US CMS Tracking Group Tracker Week, Feb
Scanning status in Salerno Chiara Sirignano Chorus Collaboration Meeting Ishigaki, 7-8 April 2003.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 18 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 14 July 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 21 July 2003 Sam Burke UCSB HEP Group.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Status of the LHC optics T. Persson on behalf of the OMC-team.
First SPL Collaboration Meeting Organization of the Collaboration - Preliminary ideas - R. Garoby 12/12/2008.
Finding Roots Composite Numbers STEP 1: Find all the factors of a number.
N. Saoulidou Fermilab 1 Status & Update of track reconstruction in the Near Detector N. Saoulidou, Fermilab
WEEK 1 You have 10 seconds to name…
Eduardo RodriguesLHCb Collaboration Week, 11 Dec L0 Bandwidth Division Update Eduardo Rodrigues, CERN Physics channels under study and set-up Pile-up.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 25, 2004.
MUON DAQ WORKSHOP Muon Week, CERN February 2014 Nicoletta Garelli (SLAC)
3:00. 2:59 2:58 2:57 2:56 2:55 2:54 2:53 2:52.
Dan Cheng, Maxim Marchevsky 9/9/2014 Copper Plated Trace Development Update.
17 May 2005Jim Lamb (UCSB)1 Status of Rod Production at UCSB This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz Puneeth.
GCC Conversion Status Alan M Jonckheere. 12/4/2002A.M.Jonckheere2 Introduction KAI is no longer supported by their new owner, INTEL. Reconstituted C++
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
First test of the PoC. Caveats I am not a developer ;) I was also beta tester of Crab3+WMA in 2011; I restarted testing it ~2 weeks ago to have a 1 to.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Unit 13-2 vocabulary 1. gone Definition – not here sentence 2. adult Definition – a grown-up sentence.
Maria Alandes Pradillo, CERN Training on GLUE 2 information validation EGI Technical Forum September 2013.
Area Covered. Work Done Quantity Financial Progress of work.
Top Fire Protection Services Ottawa available on Dubinskyconstruction
QuickBooks Payroll Support Payroll Support QuickBooks Payroll Support Payroll Support Call Now : 1(800)
Update of US Testing Status
Unexpected Failures of Modules on Rods
On behalf of the US TOB testing group
First Assembled Rod in US
US Testing Mailing List
KELVIN MAINTENANCE GUIDE
US Module Testing Progress Report
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
Electrical Testing at UCSB: Hybrids, Modules, & Rods
Genocide Case Studies.
TOB Module Production Overview and Plan
Hybrid & Module Testing Status
Hybrid & Module Testing Status
US Module Testing Progress Report
Hybrid & Module Testing Status
Equipment Status ARCS equipment status DAQ equipment status
Types of Errors And Error Analysis.

Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
FNAL Hybrid Testing Status
Presentation transcript:

24 May 2005C. Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz Puneeth Kalavase Jim Lamb assembly testing

24 May 2005C. Campagnari (UCSB)2 Bottom Line Summary Rod production stopped since May 5 th pending resolution of I 2 C errors Much effort here and at FNAL trying to pinpoint the problem with assistance from CERN –Not much progress –Expect CERN experts "soon" Other progress: –chiller moved, loss of fluid problem seems fixed –continue work on cut tuning for bad channel flagging

24 May 2005C. Campagnari (UCSB)3 Summary of tests done at UCSB and FNAL