Slides for Project Review 15 Dec. 20081 ILD Future Colliders ILC, ILC-CLIC & Detectors ILD  VTX,LCTPC,CALICE.

Slides:



Advertisements
Similar presentations
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
Advertisements

Signing LOI for ILD detector concept at ILC Deadline LOI submits march 31st 2009.
Keynote Workshop Charge Akiya Miyamoto, KEK 16-April-2009 ILD Software Workshop.
CDR status, etc. LCD monthly meeting 19 Dec 2011 Lucie Linssen, LCD monthly meeting 19 Dec Lucie Linssen.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
RD’s Report (update since LCWS08 in Chicago) 2009/4/171TILC09 S.Yamada Sakue Yamada April Tsukuba.
ILCSC and WWS News David J. Miller: ILCSC news for MDI workshop, 6 January ILCSC Membership Recent ILCSC meetings Worldwide Study Plans.
Summary Remarks By Jonathan Dorfan. We Are Living In a Remarkable Time – We Stand at the Door to a A scientific Revolution  Discoveries of the past five.
F. Richard 26/11/101 Summary of LC Physics and Detector Workshop ECFA meeting at CERN F. Richard LAL/Orsay.
RD’s Report on the status of physics/detector activities ILD Sakue Yamada May 23, 2012 Sakue Yamada.
ECFA LCWS 26 May 2013 DESY Sachio Komamiya The University of Tokyo 1 26 May 2013 DESY Hamburg Linear Collider Board (LCB) Report.
Silicon Detector: Simulation & Reconstruction Norman Graf SiD Advisory Meeting September 14, 2009.
 k0k0 ++ -- -- p ILC Technical Design Report Physics and Detectors – Detailed Baseline Design Juan A. Fuster Verdú, IFIC-Valencia PAC Meeting, KEK.
ILC Detectors - concepts and R&D status/plans - 清華大学、北京、 Jan 12, 2009 Hitoshi Yamamoto 東北大学.
Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.
ILCTRP WWS  ILCSC D.J.Miller for WWS; 16/11/ Report to ILCSC from the World-Wide Study of Physics and Detectors for a Linear Collider. 1.Proposed*
General news CLIC detector and physics meeting at LC2013, May 30 th 2013 Lucie Linssen L. Linssen, CLIC detector & physics meeting, May 30th
ECFA - European Commitee for Future Accelerators RECFA Meeting Lisbon - March 2008.
Report from Physics and Detectors Sakue Yamada Beijing March 26, 2010 The activity of the two detector groups IDAG monitoring Common Task groups.
J. Mnich for Pier Oddone | ICFA Report to Lepton Photon 2013 June 28, 2013 | Page 1 ICFA Report to Lepton Photon 2013 J. Mnich (for Pier Oddone, ICFA chair)
Charge to the Workshop (and a report from WWS) Hitoshi Yamamoto July 11, 2005 ACFA8, Daegu, Korea.
F. Richard LAL/Orsay CLIC-ILC connections on Detectors PAC Paris meeting October 20, 2008.
1 1 LCC Physics and Detector Hitoshi Yamamoto ILD WS, Kracow Sep 24, 2013.
RD’s Report Sakue Yamada Aug. 24, 2011 Institute Mumbai 2011/8/241Sakue ILCSC, Mumbai.
Lucie Linssen, CLICdp, (bi-)monthly meeting, July 21st CLICdp news CLICdp (bi-)monthly meeting July 21 st 2014.
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
1 1 LCC Physics and Detector Hitoshi Yamamoto LCWS2013, Tokyo November 11, 2013.
1 1 LCC Physics and Detector Hitoshi Yamamoto ECFA LC2013, DESY May 27, 2013.
ACFA Summary Akiya Miyamoto, KEK KILC12 26 April, 2012.
Status of ILC detector/physics activity Sakue Yamada Apr. 24, /4/241Sakue
WWSWWS Next steps for Detectors by F. Richard LAL/Orsay TILC08 TILC08 Joint ACFA Physics and Detector Workshop and GDE meeting on ILC, 3-6 March 2008,
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
ALCPG2011, March 2011 H.Weerts1 ALCPG2011 Summary H.Weerts Argonne National Laboratory.
LCD Monthly Meeting – Upcoming Conferences 2012 Michael Hauschild, 19-Mar-2012, page 1 Upcoming Meetings, Workshops, Conferences 2012 LC TPC Collaboration.
WWSWWS David J. Miller for WWS to ILCSC at Frankfurt, 10 May from the WorldWide Study on Physics and Detectors for ILC 1. LCWS at Stanford
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
ACFA-7; Taipei, Nov 2004 H.Weerts Kick-off The Si licon D etector Design Study SiD Organization & Status H.Weerts Fermilab/Michigan State Univ. SiD kick.
General news, future LC organisation, update on CDR Vol3… Lucie Linssen L. Linssen, CLIC physics and detector monthly meeting, May 14th
WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.
F. Richard LAL/Orsay What has happened end of 2007 for ILC and the consequences? F. Richard LAL/Orsay First ILD workshop Berlin, Germany, Jan 14-16, 2008.
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Eugene October
SiD collab. Mtg., 30 jan 2008 H.Weerts Stimulate the discussion & Closing Remarks to SiD collaboration meeting 30 January 2008 H.Weerts Argonne National.
ILD SiD CALI CE LC- TPC FCAL R&D group (ILC) group (ILC) “collab” (CLIC)  host lab “collab” (LC) “collab” (LC) “collab” (LC) R&D groups involved in “world-wide.
Software Common Task Group Report Akiya Miyamoto ILC PAC POSTECH 3 November 2009.
J. Brau SiD Workshop (RAL) April 14, Recent Developments on Global Detector Coordination.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
1 ILD Workshop purpose and scope Yasuhiro Sugimoto May 23,
1http:// Lucie Linssen LCWS /3/2010 SiD and CLIC Outline: Adaptation of SiD detector for CLIC Use of SiD software for CLIC Tracking.
WORKSHOP CHARGE ACFA Physics and Detector Workshop Tsukuba, Apr 17, 2009 Hitoshi Yamamoto Tohoku University.
RD’s Report Sakue Yamada May 23, /05/231 Sakue
ILC communication InterAction Collaboration 14 July 2011 Leah Hesla ILC communication at InterAction Collaboration meeting.
Detector Cooperation with CLIC PAC Pohang meeting November 3, 2009 F. Richard LAL/Orsay 11/03/20091.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
ECFA - European Commitee for Future Accelerators Tatsuya Nakada – EPFL, Switzerland– prepared for CERN September Council presented by.
Linear Colliders in the HSF Jan Strube (PNNL) 1. Introduction Large Data rates (comparable to Belle-II) ~ 18 PB / year raw data at nominal running at.
Report from the spokesperson -- CLICdp IB meeting Febr. 5 th Lucie Linssen, CLICdp IB, February 5th
General news LCD monthly meeting 12/8/2013 L. Linssen, LCD monthly meeting, 12 Aug August 8 th 2013.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
Memorandum of Cooperation for the CLIC detector and physics study Lucie Linssen Monthly meeting 19/11/
Data Model: LCIO to LCIO2.0 Norman Graf (SLAC) ILC-CLIC Software, CERN May 28, 2009.
New Organization and activities for the detector Sakue Yamada ECFA LC Warsaw June 9, 2008 Introduction IDAG LOI groups Common task groups ILC-CLIC.
ILD status report Yasuhiro Sugimoto KEK for the ILD concept group
Conferences, Workshops and other Meetings – LCD participants & talks
PDAP Junji Haba, KEK.
CLIC detector at SiD meeting 28/3/2010
Computing in ILC Contents: ILC Project Software for ILC
Introduction to the Workshop
Sakue Yamada March 19, 2011 RD’s Report Sakue Yamada March 19, /03/19 Sakue
Report from ICFA ICFA mission and membership ICFA Panels ICFA and ILC
Update of the Detector Program for ILC Sakue Yamada March
Presentation transcript:

Slides for Project Review 15 Dec ILD Future Colliders ILC, ILC-CLIC & Detectors ILD  VTX,LCTPC,CALICE

Slides for Project Review 15 Dec Barry Barish (ILC GDE -ILC “black December” survived (due to resiliency of GDE/WWS: we are ‘back on track’) -Some ILC issues --ATF2 --low P option --’minimal machine’ -ILC-CLIC Collaboration ILC: TDP interim rep TDP/Proposal 2012 CLIC: CDR 2010 TDR 2012 (?) ILC-CLIC decision ~2012 Collab. includes ILC-CLIC detector/physics

Slides for Project Review 15 Dec CLIC08 WS 14 OCT 2008

Slides for Project Review 15 Dec Sakue Yamada (ILC Research Director) -RD org. includes IDAG, R&D, Physics: LCTPC Collaboration Calice Collaboration Vertex (collection of groups)

Slides for Project Review 15 Dec Michel Davier (IDAG chair) - 3 concepts (ILD, SiD, 4 th ) - LOIs (~100p) due 29 March IDAG (~16 people) horiz, vertical org. - “Validate” Concepts within 6 months

Slides for Project Review 15 Dec ILD detector MOKKA model: Simulations going full blast…to now ~20M fullsim events generated & reconstructed on the GRID!

Slides for Project Review 15 Dec LCTPC performance goals: R&D plans – 25 Groups world wide in LCTPC collaboration to verify performance via tests on the Large Prototype LCTPC performance goals: R&D plans – 25 Groups world wide in LCTPC collaboration to verify performance via tests on the Large Prototype

Slides for Project Review 15 Dec st tracks seen in LP!

Slides for Project Review 15 Dec Rolf Heuer (future CERN DG) - Enthusiastically described the opening of the “Terascale” (LHC, LC) - Welcomed ILC-CLIC collaboration ILC/CLIC decision 2012 based on LHC/Tevatron/Lep results - Announced more intensive ILC-CLIC detector-org. meetings in Jan.09 - Somehow emphasized the beauty of the ILD concept and how PFA “works up to  s ~ 3 TeV”

Slides for Project Review 15 Dec WWSOC - WWSOC-chairs part of RD organization (“to represent the physics/detector community”) - WWSOC will continue to advise and to organize the LCWS workshops - Change of some members - Some worry about theorists’ interests - Next: ACFA April 2009 ALCPG Early fall 2009 January 2010 LCWS Asia Fall 2010