October 15, 2004GLAST Project Results of 1 st Run P.A. Test Fixture LATLAT 1 RESULTS OF 1 st RUN PITCH ADAPTER TEST FIXTURE Peter Amnuaypayoat

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Advertisements

Safety/Electrostatic Discharge (ESD) Computer Maintenance Copyright © Texas Education Agency, All rights reserved.1.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
P. Béné, F. Cadoux, A. Clark, D. Ferrère, C. Husi, M. Weber University of Geneva IBL General Week - 11, 12 February 2010 IBL Stave Loading Status Summary.
Chapter 20 Electricity. Section 1 Electric charge and static electricity.
Electrical Safety and Grounding Essentials Copyright © Texas Education Agency, All rights reserved.
Checker 200 Series Training Presentation. CONFIDENTIAL The Checker 200 Series Versatile, multicolor lighting provides high contrast Small: 67x36x70 mm.
Integrated Circuits (ICs)
Undertake basic electrical tasks
Thermal Testing of TEC/TOB Hybrids at UCSB 1/20/04 Slide 1 Thermal Testing of TOB/TEC Hybrids at UCSB.
Development of Laser Fuser Test Bed Project Number: P07501 Justin McMillan.
July GLAST Project Installation Review LATLAT 1 Tracker Tower Installation Review Peter Amnuaypayoat
MRB on SLAC NCR 226 MCM Encapsulation Delamination R.P. Johnson January 3, 2005.
Interconnection in IC Assembly
Investigating Basic Circuits Pre-Activity Discussion
NSTX Upgrade Testing TF Coil Flexible Connector Prototype In-Plane Deflection Test
GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico1 Ladder Wirebonds break MRB Meeting – 3 december 2004.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Presenter: Craig Woolhouse Sales Manager Elcometer Limited
Circuit Protection Electrical circuits require protection to prevent fire or electrocution in the event of a fault. There are two main types of circuit.
Electrical Electricity Fuses Relays Solenoids Electrical Testing
Electrical Fundamentals
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
1 Electrical Safety. 2 Electrical Hazards & OSHA 29 CFR (b)(1) requires: “Electrical equipment shall be free from recognized hazards that are.
Starter System Service Chapter 33 Page 439. Service Begins with Checking System Check the battery first –Voltage should be 12.6 and while the starter.
Experience with the MVD Living around the beam pipe Components, connections, signals, systems Hubert van Hecke - Los Alamos.
1 Safety and Preventative Maintenance. 2 MB, One megabyte - MB or M-byte - represents about 1 million (10 6 ) bytes. Precisely, 1 MB = = 1 kB x 1 kB =
Grounding, bonding, and ground fault currents
CVD PCB, first steps. 15 mm 25 mm Chip area. No ground plane underneath the chip. Bulk isolated => only one ground line Power lines Connector: 11,1mm*2,1mm:
3M Bonding Systems Division Adhesives for Electronics Reliability Study of Sub 100 Micron Pitch, Flex-to-ITO/glass Interconnection, Bonded with an Anisotropic.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
MJS1 Computer Society SCC20 Hardware Interface Committee PAR Proposal: IEEE-P Portable-Bench Top Universal Pin Map.
1a.  Exposed part  Live or energized part  De-energized part 1a.
Introduction to Soldering
Chapter 16.  Smallest particles of matter are called atoms  Electrons  Protons  Neutrons.
IPC Stress Relief Lands and terminals shall be located by design so that components can be mounted or provided with stress relief bends in.
Basic Electrical Circuit Materials Colts Neck High School Applied Technology.
Zian Zhu The Tension/Pitch Machine Status and Anode Panel Measurements The Strip Capacitance Meter Status and Measurements Production Readiness Review.
Limiting Maximum Current of the Power Supply. Which Meter has almost zero resistance? Current meter R i  0  e.g.,  R i 
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
MRB on SLAC NCR 226 Excess of Disconnected MCM Channels R.P. Johnson November 9, 2004.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
Proposal for Optimisation and Automation of Beam Impedance Measurement Developed and Presented by Muzhaffar Hazman Thanks to Olav Berrig.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray.
CERN SPD meeting, 4/06/2002V. Manzari for Bari SPD-Group1 Half-stave assembly Gluing procedure & glue characteristics Status of dummy components.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
Auto turn off battery charger Auto turn off battery charger.
HOUSE WIRING Final Review. Electricity Electricity = flow of electrons Conductor= electricity passes thru easily - Metal, water, person Insulator = restricts.
HOUSE WIRING NOTES. Electricity  Proton – positive charge  Electron – Negative charge  Electricity = flow of electrons Conductor= electricity passes.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
A+ Computer Repair Lesson 4 Introduction to Electricity and Safety.
SeaPerch Electrical System. Electrical System Overview Assemble the control box. Make the Cat5 connector. Wire the motors to the tether. Wire the control.
SVD QCG Report F.Forti. Outline Sep 09, 2015QCG Report, F.Forti2 view/Detector/SVD/SvdQCQAGrou p.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Electrical Safety. What is a short circuit? Connection that allows current to take the path of least resistance. Easiest possible path. Path with the.
SeaPerch Electrical System
GLAST Large Area Telescope:
Investigation on tray MID 063 Back
Preproduction Status & Results
Mechanical Dimensions
GLAST Large Area Telescope:
Click anywhere to get started…
GLAST Large Area Telescope:
FIGURE 35-1 If the vacuum hose is removed from the fuel-pressure regulator when the engine is running, the fuel pressure should increase. If it does not.
Electrical components and systems
Mechanical Dimensions
SeaPerch Electrical System
Presentation transcript:

October 15, 2004GLAST Project Results of 1 st Run P.A. Test Fixture LATLAT 1 RESULTS OF 1 st RUN PITCH ADAPTER TEST FIXTURE Peter Amnuaypayoat

October 15, 2004GLAST Project Results of 1 st Run P.A. Test Fixture LATLAT 2 Equipment Set-Up of Pitch Adapter Testing CONNECTOR SAVER TEST FIXTURE ZEBRA CONNECTOR GROUND LEAD STORAGE CASE MCM WITH PITCH ADAPTER SOFTWARE/ ELECTRICAL FIXTURE

October 15, 2004GLAST Project Results of 1 st Run P.A. Test Fixture LATLAT 3 Initial Issue of Test Fixture Zebra Connector did not have proper conductivity with Zebra Connector Mount –Tested Zebra Connector with Ohm meter Zebra Connector : 100 Ohms –Tested Zebra Connector Mount w/ Ohm meter Zebra Connector Mount: 1 Ohm Zebra Connector Mount has Alodine surface on all three contact faces of Zebra Connector Initial run did not have any connection between Zebra Connector and Zebra Connector Mount. –From testing with an Ohm meter, we found that a connection could be made with a large amount of force being applied to the Zebra Connector. –This force was too much for the Test Fixture to be capable of, and presumably too much for the Pitch Adapter to handle. Zebra connector Mount Zebra Connector

October 15, 2004GLAST Project Results of 1 st Run P.A. Test Fixture LATLAT 4 Quick Solution for Issue to Continue Testing Switched to alternate Zebra Mount with deeper Zebra Connector slot Applied a thin non-coated conductive wire between the Zebra Connector and Zebra Connector Mount Connected the “sandwiched” wire, directly to the grounding lead Applied enough force to the Zebra Connector to have contact with conductive wire

October 15, 2004GLAST Project Results of 1 st Run P.A. Test Fixture LATLAT 5 Test Results of 1 st Run Pitch Adapter Test Fixture Tested 5 different MCM’s, including 2 with no bad traces (according to Visual Inspection). – 2 tall MCM’s – 3 short MCM’s Test Software was able to count amount of disconnected channels/traces and give there location. – Delta’s (additional disconnected channels) of Trial runs were NOT visually inspected for each MCM Additional disconnected traces/channels were assumed to be nonconductive points between the Zebra Connector and the Conductive wire Additional disconnected traces/channels could also be disconnected/malfunctioning chips? – Delta of disconnected channels were not always in the same location. Conclusion of 5 test runs: – Connection between Zebra Connector and Conductive wire was not consistent – Wire was may have been too stiff and therefore contained “kinks” that allowed nonconductive points between the Zebra Connector and Conductive wire – Presumed: if connection between Zebra connector and ground lead were constant (complete connection throughout the entire strip), ALL Delta’s of trial runs would equal 0 FIRST RUN PITCH ADAPTER TEST RESULTS MCM # OF BAD CHANNELS DETECTED FROM VISUAL INSPECTION # OF BAD CHANNELS DETECTED FROM P.A. TEST FIXTURE DELTA OF VISUAL INSPECTION AND TEST FIXTURE

October 15, 2004GLAST Project Results of 1 st Run P.A. Test Fixture LATLAT 6 Solutions for Zebra Connector to Zebra Connector Mount 1.Use a more conductive and pliable wire to be placed between the Zebra connector and the Zebra connector Mount 2.Use a Conductive Bond/Epoxy to bond the Zebra Connector into the slot of the Zebra Connector Mount –Heat required for Conductive Bond/Epoxy? –Zebra Connector may not be compatible with Conductive Bond/Epoxy 3.Apply “conductive foil” between the Zebra Connector and slot of the Zebra Connector Mount. Connect foil directly to ground lead. –Material? –Availability? –Thickness? 4.Modify Zebra Connector Mount to physically clamp down on Zebra Connector, therefore “Squeezing” the Zebra Connector and applying enough force to create a uniform connection –Machining required –New parts will need to be created

October 15, 2004GLAST Project Results of 1 st Run P.A. Test Fixture LATLAT 7 Objectives Covered by 1 st Run Test Pitch Adapter Test Fixture Proper connection of Zebra Connector to Pitch Adapter Fine adjustment of contact of Zebra connector to Pitch Adapter Fine adjustment of Pressure of Zebra connector to Pitch Adapter Ability to accept and test MCM while in new Burn-IN storage Case Works with Electrical test fixture and Software User Friendly and tool free Software Determines # amount of disconnected channels on Pitch Adapter Determines location ( which ladder) of disconnected channels New Burn-IN Storage Case ESD safe Accepts current Connector Saver Protection of MCM/no allowance of unwanted flexing Ease of handling and storage (lid removal and integration into the P.A. Test fixture) Reusable

October 15, 2004GLAST Project Results of 1 st Run P.A. Test Fixture LATLAT 8 Outcome of 1 st Run of Test Fixture Pitch Adapter Test Fixture mechanically performs as expected New Burn-IN Case and lid mechanically perform and function as expected Need to implement a better interface between the Zebra Connector and the Zebra Connector Mount Need to test New Burn-IN Case and lid for: – thermal cycling – Burn-IN AFTER THE FIRST TEST RUN OF THE P.A. TEST FIXTURE, I FEEL QUITE CONFIDENT THAT A BETTER INTERFACE FOR THE ZEBRA CONNECTOR WILL BE ATTAINED EASILY. AFTER THE IMPLEMENTATION OF A NEW INTERFACE, WE WILL TEST FOR ZERO DISCREPENCIES BETWEEN THE VISUALLY INSPECTED MCM’S AND THE TEST FIXTURE INSPECTED MCM’S. IF “ADDITIONAL DISCONNECTED TRACES/CHANNELS” ARE MALFUNCTIONING/DISCONNECTED CHIPS, THEN CURRENT SET UP IS FUNCTIONAL