LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,

Slides:



Advertisements
Similar presentations
Workshop Issues Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Diagnostics.
Advertisements

Zachary Wolf Undulator Tuning November 12, Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, D. Jensen,
XFEL Undulator Efforts at DESY and Thoughts on LCLS-II H.-D. Nuhn June 30, 2010.
XFD – XF Engineering Group November 15-th, 2004LCLS Undulator Final Design Review1 Undulator for the LCLS project - design of the support and mover system.
Experience Report with the Alignment Diagnostic System Georg Gassner September 17 th 2010.
June 19, 2008 Heinz-Dieter Nuhn, SLAC / LCLS Overview 1 Overview Heinz-Dieter Nuhn, SLAC / LCLS June 19, 2008 Introduction Workshop.
Workshop Introduction Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Diagnostics.
October 12, 2006 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Good Field Region and Tuning Strategy 1 Undulator Good Field Region and.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Undulator Physics April 29, 2004 Heinz-Dieter Nuhn, SLAC / SSRL Facility Advisory Committee Meeting Undulator Physics Diagnostics.
Undulator Physics Requirements April 7, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Facility Advisory Committee Meeting Undulator Physics.
Undulator Alignment Strategy – April 20, 2006 Heinz-Dieter Nuhn, SLAC / LCLS FAC 1 Undulator Alignment Strategy Heinz-Dieter Nuhn,
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
Undulator Commissioning September 22, 2004 Heinz-Dieter Nuhn, SLAC / SSRL LCLS Commissioning Workshop Undulator / FEL Commissioning.
Isaac Vasserman Magnetic Measurements and Tuning 10/14/ I. Vasserman LCLS Magnetic Measurements and Tuning.
X-Ray Diagnostics for the LCLS Jan , 2004 UCLA.
John N. Galayda LCLS Commissioning 22 September 2004 Welcome/Charge Welcome to the Workshop LCLS Status Since the January.
Undulator Overview FEL Performance Assessment
Yurii Levashov LCLS Undulator Fiducialization October 20, 2005 *Work supported in part by DOE Contract DE-AC02-76SF LCLS.
PRDs, ESDs, ICDs Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Undulator.
Physics Requirements – October 20, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Internal LCLS Undulator Alignment and Motion Review 1 Physics.
Undulator Physics Update October 12, 2004 Heinz-Dieter Nuhn, SLAC / LCLS Facility Advisory Committee Meeting Undulator Physics Update.
October 30, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Physics Issues 1 Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
BBA Related Issues Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Undulator.
Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 1 MMF Introduction, Schedule, Budget Robert Ruland.
Undulator Gap Increase Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC In collaboration.
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
Robert Ruland MMF Layout, Workflow October 14, 2004 MMF Review 1 MMF Layout, Workflow Robert Ruland Magnetic Measurements Facility.
Overview of Proposed Parameter Changes Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
April 16, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Physics Issues 1 Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS.
Magnet designs for the ESRF-SR2
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Undulator Specifications Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
XFD – XF Engineering Group November 15-th, 2004LCLS Undulator Final Design Review1 Undulator for the LCLS project – from the prototype to the full scale.
J. Welch Talk MMF 10/14/04 LCLS Magnetic Measurement Facility Requirements Functional Temperature Vibration Earth's.
Zachary Wolf LCLS Undulator October 30, LCLS Undulator Tuning And Fiducialization Zack Wolf, Yurii Levashov, Achim.
Zack Wolf Undulator Magnetic April 11, 2006 LCLS Undulator Magnetic Measurements Zack Wolf, Scott Anderson, Ralph Colon,
Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 1 Introduction Heinz-Dieter.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
1 Heinz-Dieter Nuhn 1 Undulator Plans June 2009 FAC Undulator Commissioning Heinz-Dieter Nuhn – LCLS Undulator Group Leader June.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
LCLS-II Physics Meeting, May 08, 2013 LCLS-II Undulator Tolerances Heinz-Dieter Nuhn LCLS-II Undulator Physics Manager May 8, 2013.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
FEL Simulations: Undulator Modeling Sven Reiche Start-end Workshop DESY-Zeuthen 08/20/03.
Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,1 Alignment Plan for the LCLS Undulator Catherine.
Design and Measurement Results for the Permanent Magnet Undulators for the Linac Coherent Light Source Facility II D. Arbelaez BeMa2014, 01/02/2014.
Magnetic Measurements For The LCLS Undulator System
LCLS Undulator Fiducialization
Phase Adjustments: K vs
PERMANENT MAGNET QUADRUPOLE FOR THE LINAC 4 CCDTL
Undulator System Components Status Dean Walters
Undulator Line Design Liz Moog, Advanced Photon Source April 24, 2002
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
LCLS Undulator System Status and Schedule
LCLS FEL Parameters Heinz-Dieter Nuhn, SLAC / SSRL April 23, 2002
Heinz-Dieter Nuhn – LCLS Undulator Group Leader May 14, 2009
LCLS Undulator System Status and Schedule
Undulator Physics Diagnostics / Commissioning Strategy Heinz-Dieter Nuhn, SLAC / SSRL August 11, 2004 Undulator Overview FEL Parameters Diagnostics and.
Final Break Length Choice AC Conductivity Wakefields
Breakout Session SC3 – Undulator
LCLS Undulator Magnetic Measurements
Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS July 11, 2007
Presentation transcript:

LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn, SLAC / LCLS October 14, 2004 Undulator Overview Requirement Documents Undulator Fields and Tapering Cradle Components and Motion MMF Physics Requirements Undulator Overview Requirement Documents Undulator Fields and Tapering Cradle Components and Motion MMF Physics Requirements

LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Linac Coherent Light Source Near Hall Far Hall Undulator

LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review

LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Undulator Segment Prototype

LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Undulator Requirement Documents Index URL:

LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Undulator Type planar hybrid Magnet Material NdFeB Wiggle Planehorizontal Gap6.8mm Period Length30.0 ± 0.05mm Effective On-Axis Field1.249T Standard Effective K ± 0.015% Range of Effective Undulator Parameter K (3.4804) Accumulated Segment Phase Error Tolerance 10degrees (at any point along segment) Module Length3.40m Number of Modules33 Undulator Magnet Length112.2m Standard Break Lengths cm Nominal Total Device Length m Quadrupole Magnet Technology EMQ Nominal Quadrupole Magnet Length 7cm Integrated Quadrupole Gradient 3.0T Undulator Type planar hybrid Magnet Material NdFeB Wiggle Planehorizontal Gap6.8mm Period Length30.0 ± 0.05mm Effective On-Axis Field1.249T Standard Effective K ± 0.015% Range of Effective Undulator Parameter K (3.4804) Accumulated Segment Phase Error Tolerance 10degrees (at any point along segment) Module Length3.40m Number of Modules33 Undulator Magnet Length112.2m Standard Break Lengths cm Nominal Total Device Length m Quadrupole Magnet Technology EMQ Nominal Quadrupole Magnet Length 7cm Integrated Quadrupole Gradient 3.0T Summary of Nominal Undulator Parameters

LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Micro Tapering V: K values The following list contains the nominal K values for the 33 undulator segments for the 6.8 mm gap height: This amount of tapering requires only a negligible adjustment for break lengths. After achieving goal performance, tapering beyond saturation point is desirable. (up to 0.56% total) This amount of tapering requires only a negligible adjustment for break lengths. After achieving goal performance, tapering beyond saturation point is desirable. (up to 0.56% total) Undulator SegmentK eff To compensate energy loss from spontaneous radiation

LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Undulator Pole Canting Canting comes from wedged spacers 4.5 mrad cant angle Gap can be adjusted by lateral displacement of wedges 1 mm shift means 4.5 microns in gap, or 8.2 Gauss B eff adjusted to desired value Source: Liz Moog Suggested by J. Pflueger, DESY

LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Canting the poles helps in many ways Facilitates final setting of B eff Remote control of position allows run-time adjustment Allows compensating for temperature effect on field strength: ±1.0°C temperature error would require ±1.2 mm lateral shift of undulator Source Liz Moog

LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Effective B field vs. x Measured slope of 6.6 Gauss/mm agrees with calculations (~ 5.7 Gauss/mm for 3 mrad cant) Field variation allowance between segments is  B/B = 1.5x10 -4, or  B = 2 Gauss, which translates to  x = 0.3 mm ( or 1 micron in gap) Source Liz Moog See I. Vasserman’s Talk for Prototype Measurements

LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Using Undulator Roll-Away and K Adjustment Function Neutral; K=3.4965;  x=+0.0 mmFirst; K=3.5000;  x=-1.5 mm Last; K=3.4929;  x=+1.5 mmRollAway; K=0.0000;  x=+100 mm PowerTp; K=3.4804;  x=+7.0 mm

LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Cradle Components Cradle Components include Undulator strongback arrangement mounted on horizontal slides Vacuum chamber support BPM Quadrupole WPM sensors HLS sensors (diagnostics chamber) The undulator strongback arrangement (segment) is mountable on and removable from the cradle with the vacuum chamber in place and without compromising the alignment of the vacuum chamber. Undulator strongback can be taken off the cradle for magnetic measurements Complete cradle assembly will be aligned on Coordinate Measurement Machine (CMM). Cradle Components include Undulator strongback arrangement mounted on horizontal slides Vacuum chamber support BPM Quadrupole WPM sensors HLS sensors (diagnostics chamber) The undulator strongback arrangement (segment) is mountable on and removable from the cradle with the vacuum chamber in place and without compromising the alignment of the vacuum chamber. Undulator strongback can be taken off the cradle for magnetic measurements Complete cradle assembly will be aligned on Coordinate Measurement Machine (CMM).

LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Motions of the Cradle and of Cradle Components Remotely Controlled Motion: Cradle: x, y, roll x, y motion of cradle ends are coupled roll motion capability is to be used to keep roll constant Undulator: x Horizontal slide stages move undulator strongback independent of cradle and vacuum chamber Manual Adjustment: Cradle Movers to fixed support girder (AMP) Quadrupole and BPM position to cradle. Remotely Controlled Motion: Cradle: x, y, roll x, y motion of cradle ends are coupled roll motion capability is to be used to keep roll constant Undulator: x Horizontal slide stages move undulator strongback independent of cradle and vacuum chamber Manual Adjustment: Cradle Movers to fixed support girder (AMP) Quadrupole and BPM position to cradle.

LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review MMF Physics Requirements Earth Magnetic Field Compensation Establish environmental magnet field in MMF to be equal to the environmental field at target location in undulator hall to better than 0.01 T. MMF Temperature Average ambient MMF temperature needs be 20.0 ± 0.1 o C to match the ambient undulator hall temperature of 20.0 ± 0.2 o C. Magnetic Undulator Shimming to Reduce phase error below 10 degrees at 0.15 nm. Reduce 1 st Field Integral below ±40×10 -6 Tm Reduce 2 nd Field Integral below ±50×10 -6 Tm 2 Definition of Standard Undulator Axis (SUSA) so that SUSA is Parallel to Undulator Center Line Effective K along SUSA is ± Alignment of Quadrupole on Cradle with respect to CA*. Tolerance: 40  m (rms). Routine Operational Checking of Undulator Segments Remove 3 segments / month from undulator hall and replace with spares Characterize magnetic field of removed segments and prepare for re-installation. Earth Magnetic Field Compensation Establish environmental magnet field in MMF to be equal to the environmental field at target location in undulator hall to better than 0.01 T. MMF Temperature Average ambient MMF temperature needs be 20.0 ± 0.1 o C to match the ambient undulator hall temperature of 20.0 ± 0.2 o C. Magnetic Undulator Shimming to Reduce phase error below 10 degrees at 0.15 nm. Reduce 1 st Field Integral below ±40×10 -6 Tm Reduce 2 nd Field Integral below ±50×10 -6 Tm 2 Definition of Standard Undulator Axis (SUSA) so that SUSA is Parallel to Undulator Center Line Effective K along SUSA is ± Alignment of Quadrupole on Cradle with respect to CA*. Tolerance: 40  m (rms). Routine Operational Checking of Undulator Segments Remove 3 segments / month from undulator hall and replace with spares Characterize magnetic field of removed segments and prepare for re-installation. *Cradle Axis (CA) is identical to SUSA when undulator segment is in neutral horizontal position See J. Welch’s and I Vasserman’s talks for details

LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Requirements and Specifications are available from the LCLS WEB site. The main Physics Requirements Document (PRD) outlining the requirements for the undulator system is PRD The MMF specifications are found in PRD Main Physics Task to be done at the MMF are Undulator magnetic field tuning to specifications under same surrounding magnetic field and temperature conditions as at target location in undulator hall. Quadrupole and BPM alignment on cradle with respect to undulator strongback Characterization of undulators that have been used in operation All undulator segments will be tuned identically. Micro-tapering implies that every undulator core be at a slightly different K value, which will be accomplished by horizontal positioning. Requirements and Specifications are available from the LCLS WEB site. The main Physics Requirements Document (PRD) outlining the requirements for the undulator system is PRD The MMF specifications are found in PRD Main Physics Task to be done at the MMF are Undulator magnetic field tuning to specifications under same surrounding magnetic field and temperature conditions as at target location in undulator hall. Quadrupole and BPM alignment on cradle with respect to undulator strongback Characterization of undulators that have been used in operation All undulator segments will be tuned identically. Micro-tapering implies that every undulator core be at a slightly different K value, which will be accomplished by horizontal positioning. Conclusions

LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review End of Presentation