RockSat-C 2011 ISTR Payload Subsystem Integration and Testing Report Universities/Institutions Team Members Date.

Slides:



Advertisements
Similar presentations
RockSat-C 2012 CoDR Minnesota Sound Wreckers Conceptual Design Review University of Minnesota Alexander Richman Jacob Schultz Justine Topel Will Thorson.
Advertisements

Protocol & Test Review Spaceport America Student Launch University/Institution Team Members Date.
Proposal Analysis Review NMSGC Student Launch University/Institution Team Members Date.
Data Test Review Spaceport America Student Launch University/Institution Team Members Date.
Flight Readiness Review New Mexico Space Grant Consortium University/Institution Team Members Date.
RockSat-C 2012 LRR Launch Readiness Review University/Institution Team Members Date.
Univ. of XXXXXXXXX 1 Things To Include: Team Photo Team Logo/Name.
Team Name Conceptual Design Review Team Members Date Fall 2011 Rev A
Colorado Space Grant Consortium Virginia Space Grant Consortium 1 University A University B Team # Logo 1 Logo 2.
RockSat-C 2012 SITR Full Mission Simulation Report University/Institution Team Members Date.
Individual Subsystem Testing Report Team Name University/Institution Team Members Date.
Team Name Conceptual Design Review University/Institution Team Members Date.
RockSat-C 2011 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
Team Name Final Presentation Team Members Date Fall 2010 Rev A
Team Name Conceptual Design Review Team Members Date Fall 2010 Rev A
Team Name Critical Design Review Team Members Date Fall 2011 Rev A
Full Mission Simulation Test Report Team Name University/Institution Team Members Date.
Team Name Final Presentation Team Members Date Rev
RockSat-C 2011 ISTR Individual Subsystem Testing Report Team Name School Date 1 Team Members
Team Name Final Presentation Team Members Date. User notes –You may reformat to fit your design but make sure you cover the following points –You may.
Payload Subsystem Integration and Testing Report Team Name 1 Team Name 2 Team Name N Universities/Institutions Team Members Date.
LSU 10/09/2007System Design1 Project Management Unit #2.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Critical Design Review Team Name University/Institution Team Members Date.
RockSat-C 2012 ISTR Individual Subsystem Testing Report Zero Tilt Frostburg State University Kaetie Combs, Francisco Diaz, Sean Hughes, Jared Hughes, Andrew.
Miscellaneous Notes: This is a bare-bones template – make it fancier if you wish, but be sure to address at least the items listed here. Basically this.
2014 CDR Team Name Critical Design Review CDR CDR Delieverables 1.Mechanical drawings in pdf format 2.Electrical schematics in pdf format 3.Completed.
Group 8: Shenanigans Mike Ostrowski Josh Patsey Michelle Boomer Tom Parks Levent Niazi.
Team Name Flight Readiness Review (this is a bare-bones template – make it fancier if you wish, but be sure to address at least the items listed here)
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
User notes: –Please use this template to create your Proposal Analysis Review –You may reformat this to fit your design, but make sure you cover the information.
AGENDA Introduction to Virtual Mechanic Demo Architectural diagram and summary QA steps and user acceptance testing Bugs in the software Feedback from.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
User notes: –The purpose of the flight readiness review is to determine if your experiment is ready to fly. If it is not ready – it will not fly –You must.
1IT Project Management, Third Edition Chapter 4 Chapter 4: Project Integration Management.
Individual Subsystem Testing Report New Jersey Space Grant Consortium with Rutgers University Stevens Institute of Technology 2/13/2012.
RockSat-C 2012 ISTR Individual Subsystem Testing Report Minnesota Sound Wreckers University of Minnesota 2/13/12 1 Alexander Richman Jacob Schultz Justine.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
2013 DR / ISTR Team Name Design Review (DR) & Individual Subsystem Test Review (ISTR) University/Institution Team Members Date 1.
RockSat-C 2012 SITR Full Mission Simulation Report Harding University William Waldron, Joshua Griffith, Drew Cancienne, Edmond Wilson, David Stair 22 April.
RockSat-C 2012 SITR Full Mission Simulation Report University of Minnesota Alexander Richman Jacob Schultz Justine Topel Will Thorson 4/23/2012.
Team Name Final Presentation Team Members Date. User notes –You may reformat to fit your design but make sure you cover the following points –You may.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
2013 CoDR Team Name Conceptual Design Review University/Institution Team Members Date 1.
RockSat-C 2013 FMSTR Full Mission Simulation Report University/Institution Team Members Date.
Status Update Instructions (Required by NASA/Wallops) These completed slides are due to no later than Wednesday, March 6 th, 2013,
RockSat-C 2012 ISTR Individual Subsystem Testing Report Harding Flying Bison RockSat-C 2012 Rocket Team Harding University 13 February Team Members.
Section 1: Mission Overview Mission Statement Mission Objectives Expected Results System Modifications Functional Block Diagrams 2.
2014 CoDR Team Name Conceptual Design Review University/Institution Team Members Date 1.
Preliminary Design Review Metro State College of Denver Matthew Hanley, Daniel Bass 14 November 2008.
Tethered Aerostat Program Critical Design Review Team Name Critical Design Review College Team Members Date 1.
Tethered Aerostat Program Concept Design Review Team Name Conceptual Design Review University/College Team Members Date.
Tethered Aerostat Program Concept Design Review College of Menominee Nation Conceptual Design Review College of Menominee Nation Marilyn Madosh, Larry.
2016 PDR Team Name Preliminary Design Review University/Institution Team Members Date 1.
2016 STR Team Name Subsystem Testing Review (STR) University/Institution Team Members Date 1.
RockSat-C 2013 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
Planetary Lander PDR Team Name
Team Name Critical Design Review
Individual Subsystem Testing Report
Team Members Class and Date
School/Team member names Date
Team Name Conceptual Design Review
FRIDAY SLIDES TEMPLATE
Participant Name FRC Team #
Design Process AKA Modular Design ECE 445.
SUNDAY SLIDES TEMPLATE
<Your Team # > Your Team Name Here
<Your Team # > Your Team Name Here
<Your Team # > Your Team Name Here
Presentation transcript:

RockSat-C 2011 ISTR Payload Subsystem Integration and Testing Report Universities/Institutions Team Members Date

RockSat-C 2011 ISTR –This template shall be followed as closely as possible. User Notes

RockSat-C 2011 ISTR –Briefly remind everyone what your mission is. Mission Overview

RockSat-C 2011 ISTR -A Functional block diagram of the entire system should be presented here. -By now, your payload should have excellent block diagrams after CDR completion. -Use this diagram as a basis/reference as you explain to me how things integrated together. -Be sure to define subsystem acronyms Functional Block Diagram

RockSat-C 2011 ISTR -How did you integrate your various subsystems? -To what level (Full system or just subsystem to subsystem?) -i.e. -Power board verified, then connected to main board -Powered up main board and verified voltages at all sensors -Connected control board.... Blah, blah, blah -After testing electrical boards, mounted to RockSat-X plate -Mounted mechanical boom to plate -Connected mechanical boom to control board... Blah, blah, blah -Show pictures! I am hoping to see components fitting together Integration Procedure Integrating the tether spool onto the power and unpowered hubs (EXAMPLE Picture and description)

RockSat-C 2011 ISTR -What went wrong? -What will be done to remedy the problem? -What lesson (if any) was learned? -Pictures! -What went right? -Pictures -Best practices -What advice could you give to next year’s team? Results

RockSat-C 2011 ISTR -Once integrated, did you test any of the integrated subsystems? -Why did you perform the test that you did? -If you didn’t test integrated subsystems, why not? -If you had a failure, which prevented testing, how will you move forward? -Pictures! Integrated Subsystem Testing Control board mounted to main board Testing functionality of push-button state changes in software (EXAMPLE)

RockSat-C 2011 ISTR -Did everything work as planned? -Did all electronics communicate? -Did the software work with all subsystems? -Did the sensors return reasonable data? -Will the sensors need calibration? -Most importantly, just summarize your findings -What needs to change before flight? -Action items… Testing Results Push-button Software Control: Success Successfully changed software states through push-buttons. No changes required for flight Main and Control boards could NOT be integrated into structure due hole misalignment. Next revision of board will have correct hole alignment. EXAMPLE

RockSat-C 2011 ISTR –What is your plan from now until your first Day In The Life (DITL) testing report? Currently scheduled for 4/20/2011 SITR to DITL 1

RockSat-C 2011 ISTR –Issues and concerns –Closing remarks Concluding Remarks

RockSat-C 2011 ISTR –Additional data not immediately relevant to the presentation –You should include copies of updated: Mechanical Drawings Electrical Schematics Power Budget ICDs Appendix