CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.

Slides:



Advertisements
Similar presentations
MuTr Shielding & Grounding Preliminary 10/6/99 (G. Hart) Additions 1/4/01 (REM)
Advertisements

1 S. Lusin, LV Cabling, CERN 06 Apr 06 LV Cabling 06 Apr 06 S. Lusin Fermilab / CERN Cabling from USC to UXC, Power Distribution.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
HCAL RBX PRR Overview Jim Freeman RBX PRR March 1-2, 2001.
Power supply cable Charge injection 3 channels readout (external cables to the scope) 3 channels readout (internal cables) Set up for reading two cards.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
HCAL-Fermilab7 Feb 2003Hazen / Machado HF Electronics PMT Readout Update E. Hazen, J. Rohlf, E. Machado Boston University.
Update on Electronics Activities Jim Pilcher University of Chicago 20-Jan-2006.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
HF Video MeetingDec 2002E. Hazen HF Electronics PMT Readout Update E. Hazen, J. Rohlf, E. Machado Boston University.
E. Hazen, Boston University BU Meeting, Apr. 6, 2001 Front-end Readout of the CMS Hadronic Forward Calorimeter (HF) Conceptual Design (Summary) by Eric.
Walls crates cables gas chambers electronics CERN adb.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Upgrade developments in Clermont-Ferrand Romeo Bonnefoy and François Vazeille Tilecal upgrade meeting (CERN, 13 June 2014) ● Handling tools ● Deported.
ZTF Interconnecting Scheme Stephen Kaye
Marc Baarmand Total of 8 Calibration Boxes (CBOX) for HF  CBOX contains Small blue scintillator (UV → blue) 1×9 Splitter (each CBOX serves 9 PMT RO Boxes)
HF Cabling Upgrade Options T. Shaw 30-OCT HF 2012 Upgrade Meeting 30-OCT-10 T. Shaw.
Main Board Status MB2 v1 for FATALIC & QIE 10/06/2015Roméo BONNEFOY - LPC Clermont1 Roméo BONNEFOY François Vazeille LPC Clermont-Ferrand.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
March 12, 2006R. Abrams LCWS06 Bangalore1 ILC Prototype Muon Scintillation Counter Tests Robert Abrams Indiana University.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
1 Prototype Calibration System for Forward Hadron Calorimeter L. Almeida, M. Baarmand, L. Caraway, M. Hohlmann, T. Qureshi, I. Vodopianov FLORIDA TECH.
Preliminary Results of the Beetle Readout for the MaPMTs  Part 1: as presented on  Achievements since last LHCb week  Common Mode correction.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
Final FED 1 Testing Set Up Testing idea and current status Preliminary results Future development Summary M. Noy
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
Twisted Pair Cable A.Nomerotski 12/12/02  Dense assembly (OD 5-7 mm) with u Twisted pairs : total 21; 44-pin mm dual row Omnetics connector s differential.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA Electronics systems for the ClearPEM-Sonic scanner José C. DA SILVA, LIP-Lisbon Tagus LIP Group * *J.C.Silva,
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
Specifications Asic description Constraints Interface with PDM board Schedule Summary.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
1 H C A L HF Cable Plant Options HF Cable Plant Options December 22, 2010 T. Shaw.
Plans and Progress on the FPGA+ADC Card Pack Chris Tully Princeton University Upgrade Workshop, Fermilab October 28, 2009.
D. Attié, P. Colas, E. Delagnes, M. Riallot M. Dixit, J.-P. Martin, S. Bhattacharya, S. Mukhopadhyay Linear Collider Power Distribution & Pulsing Workshop.
1 (Gerard Visser – STAR Integration Meeting 5/16/2008) STAR Forward GEM Tracker Readout/DAQ Integration G. Visser Indiana University Cyclotron Facility.
May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG.
CDMS II Shielding To Installation To Construction From Design.
RF Phase Reference Distribution for the European XFEL Krzysztof Czuba Warsaw University of Technology, ISE For the RF Synchronization Team P. Jatczak,
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
Specifications Asic description Constraints Interface with PDM board Planning Summary.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
Mauro Citterio - Mi meeting
HF “Slice test box” installation
Calorimeter Mu2e Development electronics Front-end Review
HF Test station at P5 A.Mestvirishvili.
HF “Slice test box” fabrication and installation
Mini-drawers, FE-ASIC , Integrator
ROBOX modification plans
Front-end electronic system for large area photomultipliers readout
RPC Front End Electronics
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
RPC Electronics Overall system diagram Current status At detector
Presentation transcript:

CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University

CMS WeekDec 2002E. Hazen HF Electronics Installation Preliminary HF Readout Boxes 24 PMTs each Cable Route ~5m through shielding Electronics Housed in standard racks (3U card cages)

CMS WeekDec 2002E. Hazen HF QIE Crate Proposal QIE Board 6 Channels 4 Boards = 1 PMT box Clock and Control Module (3 boards) Standard 3U subrack (custom backplane) ROB 1ROB 2ROB 3ROB 4CCM Typically only 3 of 4 ROBs used Calibration module can occupy unused ROB site (up to 5 slots - 10cm)

CMS WeekDec 2002E. Hazen PMT Base PCB Base Supports 8 PMTs with HV distribution Rear detail showing dual coax (signal plus reference) for each PMT This is fine for current testing but should probably change to a solder termination for production.

CMS WeekDec 2002E. Hazen HF PMT Cabling Octal PMT Boards 16 (short) coax or other option? 12-pair Skew-Clear 6-channel QIE Boards Patch Panel Readout Box (24 PMTs)

CMS WeekDec 2002E. Hazen PMT to QIE connection Preliminary PMT Anode 93Ω coax 100Ω pair (or multi-coax) Coax shield ground at each PMT base Overall shield connected to QIE ground Separate Ground for each PMT QIE Signal Input QIE Reference Input PMT Box Two pairs per PMT channel Multi-pin shielded connectors

CMS WeekDec 2002E. Hazen PMT Box Patch Panel MDR-36 Connector Site Mini-coax compatible with existing PMT boards We plan to make a small PCB which connects 6 PMTs to one multi-pin connector. These can be retro-fitted to existing PMT boxes for the test beam. The final box could use a similar PCB or a larger one which would handle 24 PMTs.

CMS WeekDec 2002E. Hazen HF QIE Digitizer Board Change to 36 pin MDR Connector (12 pairs, each with GND) Optical Outputs change to Honeywell ST connector VCSEL (but still near rear) Electrically identical to HCAL version 3U Eurocard form factor

CMS WeekDec 2002E. Hazen Amphenol Skew-Clear TM Cable ● High-performance, compact ● Available in zero-halogen version (ATLAS, CMS) ● Terminates to convenient Mini-D connectors with overall metal shell

CMS WeekDec 2002E. Hazen Skew-Clear Cable Drawing Will supply zero-halogen version on request OD = 10mm (28AWG) or 12mm (24AWG)

CMS WeekDec 2002E. Hazen MDR Connector Proposed Pinout RefSignal Ref Return Signal Return Shield 12-pair Skew-Clear cable handles 6 QIE channels Each channel has: Pair 1: Signal, Signal Return, Shield Pair 2: Reference, Reference Return, Shield Overall Shield connected to metal connector backshell

CMS WeekDec 2002E. Hazen PMT + Cable + QIE Pedestal (noise) measurement HV=1100 V 50 Ω rms = Ω rms = 0.53 As expected, 100 ohm cable improves noise by sqrt(2)

CMS WeekDec 2002E. Hazen Coax Cable Noise vs Length

CMS WeekDec 2002E. Hazen Skew-Clear Cable Noise vs Length Scatter due to inconsistent results (probably a bad connection)

CMS WeekDec 2002E. Hazen HF Noise Test Summary ● PMT Test setup comissioned with QIE/HTR/DCC chain. ● Extensive testing done with two cable types, lengths from 1-6m: – Dual RG-174 coax with overall braid shield – Amphenol Skew-Clear(tm) 100Ω shielded pair ● Noise performance is excellent: – 9500e rms (1.5fC) for 6m skew-clear cable – 12500e rms (2.0fC) for 6m RG-174 coax cable (single pe is 8fC for PMT gain of 5E4)

CMS WeekDec 2002E. Hazen QIE Response to Pulser 4m RG-174 1m RG-174

CMS WeekDec 2002E. Hazen PMT Pulse Examples fC ~ 125 pe PMT pulsed using Nichia blue LED and avalanche pulser Coupled through 2m RG-174 coax QIE Samples (30ns each) ~ 35 pe

CMS WeekDec 2002E. Hazen Cable Matching Issues ● Problems with impedance matching: – RG-174 coax okay, but overall braid lowers impedance --> reflections – Paired cable (like skew-clear) is 100 ohm differential impedance only... single-ended impedance to ground is lower... not well matched to high-impedance setting of QIE. ● 93 ohm ribbon coax may be the best choice

CMS WeekDec 2002E. Hazen HF Front-End Status Summary

CMS WeekDec 2002E. Hazen Critical Issues for FE ● Cable / Connector: – Pair vs coax issue still open: must settle ASAP so new QIE prototype can proceed. Need proper PCBs to make meaningful measurements of dispersion, crosstalk. – ROBOX design follows: PMT board, patch panel. ● Crate issues: – Backplane design – Power & Cooling ● LVPS – How best to utilize 'common LV' scheme without compromising performance

CMS WeekDec 2002E. Hazen Web Page for HF Front-End New web page with cable/connector documentation. Will be expanded as more documents become available...

CMS WeekDec 2002E. Hazen HF Electronics Meeting Proposal ● Start with video conferences ● Follow up with 'workshop' style meeting at Boston or Fermilab (late Jan or early Feb)