CSE9020 Semester 2 2003 Week 02 / 1 CSE9020 and CSE3200 CASE STUDY This is Week 2. The unit material is located at the web site

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Advertisements

Risk Management Policy & Procedures An Overview for Staff Prepared by MSM Compliance Services Pty Ltd.
Software Quality Assurance Plan
Supporting people with a learning disability Introduction to Project Management Presenter: Steve Raw FInstLM, FCMI.
Project Plans CSCI102 - Systems ITCS905 - Systems MCS Systems.
Gu & Maher University of Sydney, October 2004 DECO2005 Monitoring Team Process.
CSE9020 Wk04 / 1 CSE9020 CASE STUDY Week 4 Notices –The final Friday in Week 13 is the 24th October Questions –Unit Administration - Supervisor’s Roles.
Managing the Information Technology Resource Jerry N. Luftman
CSE9020 / 2003 Wk01 / 1 CSE9020 CASE STUDY Week1 Welcome to unit CSE9020 (and possibly CSE3200) better known as ‘The Case Study’ for Semester 2, 2003 I.
Lecture 2b: Software Project Management CSCI102 - Introduction to Information Technology B ITCS905 - Fundamentals of Information Technology.
CSE9020 / 2004 Wk01 / 1 CSE9020 CASE STUDY Week1 Welcome to unit CSE9020 (and possibly CSE3200) better known as ‘The Case Study’ for Semester 1, 2004 John.
Quality is about testing early and testing often Joe Apuzzo, Ngozi Nwana, Sweety Varghese Student/Faculty Research Day CSIS Pace University May 6th, 2005.
TEL382 Greene Chapter /27/09 2 Outline What is a Disaster? Disaster Strikes Without Warning Understanding Roles and Responsibilities Preparing For.
Project Management Session 7
Chapter 5: Project Scope Management
SOX & ISO Protect your data and be ready to be audited!!!
Project Scope Management
Internal Auditing and Outsourcing
Miguel Nunes Information Systems Project Management IS Project Resources.
What is Business Analysis Planning & Monitoring?
AICT5 – eProject Project Planning for ICT. Process Centre receives Scenario Group Work Scenario on website in October Assessment Window Individual Work.
Project Implementation Monika Balode Joint Technical Secretariat Lead Partner Seminar 16 October 2009, Šiauliai.
COMP 208/214/215/216 Lecture 2 Teams and Meetings.
Security Policies Jim Stracka The Problem Today.
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
Requirements Walk-through
Best Practices for Graduate Supervision December 10, 2014 Your Role in Graduate Studies.
Project Management Methodology Project Closing. Project closing stage Must be performed for all projects, successfully completed or shut off by management.
Z26 Project Management Introduction lecture 1 13 th January 2005
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Unit Guide C ertificate IV in Project Management Qualification Code.
Working in the IT Industry.  On completion of this unit a learner should: 1. Know the characteristics that are valued by employers in the IT industry.
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Lecture 3 Managing the Development Project SFDV Principles of Information Systems.
Private & Confidential1 (SIA) 13 Enterprise Risk Management The Standard should be read in the conjunction with the "Preface to the Standards on Internal.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
Project monitoring and Control
Risk Management Policy & Procedures An Overview for Staff Prepared by MSM Compliance Services Pty Ltd.
Project Life Cycle.
Audit Sampling: An Overview and Application to Tests of Controls
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 4 Project Scope Management.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Unit Guide C ertificate IV in Project Management Qualification Code.
Information Commissioner’s Office Sheila Logan Operations and Policy Manager Information Commissioner’s Office Business Matters 20 May 2008.
Welcome to Session 3 – Project Management Process Overview
Project Kick-off Meeting Presented By: > > > > Office of the Chief Information Officer.
Professional Certificate in Electoral Processes Understanding and Demonstrating Assessment Criteria Facilitator: Tony Cash.
Apply Quality Management Techniques Project Quality Processes Certificate IV in Project Management Qualification Code BSB41507 Unit Code BSBPMG404A.
Meeting Management/Planning. Today Go over basics of meeting management Introduce key elements of creating a plan.
BSc Honours Project Introduction CSY4010 Amir Minai Module Leader.
Project Management Workshop James Small. Goals Understand the nature of projects Understand why Project Management is important Get an idea of the key.
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Project Quality Processes C ertificate IV in Project Management
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
Overview of RUP Lunch and Learn. Overview of RUP © 2008 Cardinal Solutions Group 2 Welcome  Introductions  What is your experience with RUP  What is.
Fundamentals of Governance: Parliament and Government Understanding and Demonstrating Assessment Criteria Facilitator: Tony Cash.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Safety Training - Unit Management Why it is essential, who needs it and how to go about it February 2015 Dr Emer Bell Integrated Risk Solutions.
BSc Honours Project Introduction CSY4010 Amir Minai Module Leader.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
Office 365 Security Assessment Workshop
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Outcome TFCS-11// February Washington DC
COMP 208/214/215/216 Lecture 2 Teams and Meetings.
Guidance notes for Project Manager
How to conduct Effective Stage-1 Audit
Employee engagement Delivery guide
Time Scheduling and Project management
Executive Project Kickoff
Presentation transcript:

CSE9020 Semester Week 02 / 1 CSE9020 and CSE3200 CASE STUDY This is Week 2. The unit material is located at the web site There may be alterations from week to week - take a quick look - at least weekly.

CSE9020 Semester Week 02 / 2 CSE9020 CASE STUDY Week1 Room Allocations: Lecture Theatre - S Block, Link Theatre 6.00pm Evening Supervisor Sessions: B Monday - Erling Breaden B Monday - Dempsey Chang B Monday - Santosh Kulkarni B Monday - Joseph All rooms are booked from 7.30pm

CSE9020 Semester Week 02 / 3 CSE9020 CASE STUDY Week 2 Questions –Students not in a team –Unit administration –Client Team Organisation The Project Plan Risks and Risk Management The Business Case The Quality Plan

CSE9020 Semester Week 02 / 4 CSE9020 CASE STUDY- Team Organisation One member will be the Coordinator One member will be the Quality Controller and Reviewer One member will organise system testing One member will organise test data One member will be setting agendas for meetings and taking minutes of meetings These can be rotated around the members

CSE9020 Semester Week 02 / 5 CSE9020 CASE STUDY Opportunities from CSE9020 Case Study Exposure to Problem Solving Creative Thinking Opportunity to maximise opportunities Team Working Communications - Development and Practice Time Management

CSE9020 Semester Week 02 / 6 CSE9020 CASE STUDY The Project Plan The Project Plan Document must have these components: 1. An Introduction 2. The Objectives of the Project - and should contain the ‘users’ requirements (have you read the Wool Sales article ?) 3. Deliverables and delivery dates (there’s not much flex here) 4. A Gantt chart

CSE9020 Semester Week 02 / 7 CSE9020 CASE STUDY 5. All activities must be identified 6. And supported by who is doing what 7. ‘Costs’ are to be shown as individual effort (hours) and the Project must be reviewed and a short report included with the submission.

CSE9020 Semester Week 02 / 8 The Project Plan Project Objectives are to be identified Project Scope is to be identified Project Responsibilities are to be identified (these may alter later as the project progresses and emphases change) Project Risks are to be identified and a brief description of management of the risk included Task Effort Estimates - at his stage these can only be rough assumptions, which will be further refined as the project progresses.

CSE9020 Semester Week 02 / 9 Risks and Risk Management

CSE9020 Semester Week 02 / 10 CSE9020 CASE STUDY Risk Analysis is normally part of the development of a Project. You might give some thoughts to these items: Risk means probabilities, threats and opportunities Risk management means weighing up the pros and cons before making a decision Risk analysis generally indicates that there is some choice in behaviour or actions

CSE9020 Semester Week 02 / 11 Risks Australian Standard AS NZS states that ‘risks are the consequences of uncertainty’ There are 2 elements : –the likelihood of an event –the consequence of its occurrence

CSE9020 Semester Week 02 / 12 Risks Risk Management is the use of –policies –processes –procedures to the tasks of –identifying –analysing –assessing –treating –and monitoring risk

CSE9020 Semester Week 02 / 13 Risks Information Technology is invariably associated with ‘new’ technology Risk events can emerge from –the experience or inexperience) of the project team –the nature of the technology used (‘cutting edge’, or ‘established’, –the number of stakeholders and their experience/understanding and stability –the duration of the project –size of the project team –effects of other commitments of the project group

CSE9020 Semester Week 02 / 14 Risk Management Risk Management often is related to individual business processes - for example: Investments, Information Technology project management, worker safety, insurance Other business risks : - exposure of company, customer, employee confidential and private information to unauthorised access exposure of business processes to corruption and failure

CSE9020 Semester Week 02 / 15 Risk Management Role: Risk Management Architects Skills: Information Security, Law and regulations, Risk Managers Produce: Architecture Principles, Models Standards, Patterns Enterprise Business Activities Role: Independent Assessment and Validation Skills: Internal Audit, Risk Assessment, Management Reporting Produces: Assessment Repots, Management Assurance Opportunity

CSE9020 Semester Week 02 / 16 Risk Management Architecture Levels of Abstraction Security Trust and Confidence Quality Strategic Tactical Operational Data Application Process Technology Strategic Security Confidentiality, Integrity, Availability e.g. Information Protection Policy, Privacy Policy Tactical Security Confidentiality, Integrity, Availability e.g. Risk Assessment, Incidence Response Operational Security Confidentiality, Integrity, Availability e.g. Password Protection, Biometrics,Firewalls

CSE9020 Semester Week 02 / 17 CSE9020 CASE STUDY Risks need to be managed for a successful outcome Risk making and taking is (in most cases) fundamental to an organisation which is developing, progressing, expanding, and entrepreneurial And now, the big question :- What do you see are the ‘risks’ in your project ? And, How are you going to manage them ?

CSE9020 Semester Week 02 / 18 Information Suggestions It is likely that each group, and each Supervisor, will have their own thoughts on what your project product will produce. You have an article on CRM which should give you a starting point for what you are going to develop and there is another on Team Construction. Just a word or caution : - don’t be too ambitious. The Unit is primarily designed to make you familiar with the processes, procedures and quality requirements of a project. (So, if you want to be an instant expert with vb.net, this is not the appropriate venue)

CSE9020 Semester Week 02 / 19 Information Suggestions Remember, you are designing a database, not the full database system - and certainly not an on line transaction system Your Supervisor will (probably) dissuade you from developing a Web-Accessible database Business Case

CSE9020 Semester Week 02 / 20 The Business Case

CSE9020 Semester Week 02 / 21 The Business Case Document It is due in Week 4 This is your report to the Client setting out the reasoning why (in this discipline) a computer based solution to the Client’s problem is both desirable and should be developed Or you could view it a being a ‘Business Opportunity’ to research many con-incident aspects which could lead to or be a result of, road accidents

CSE9020 Semester Week 02 / 22 The Business Case This is supplemented by the Requirements Definitions Document The purpose of this is to 1. State the purpose of the system functions (and keep this to the ‘workable’ level - e.g. create a database which will contain ……….) 2. Indicate what content (in general terms) will be the core of the system outputs

CSE9020 Semester Week 02 / 23 The Business Case 3. Convince the Client that you are both on the same wavelength As a means of achieving this, it’s a good technique to ‘talk’ in the client’s language - a Research Region is... a Highway is... a Registration Number is... a query, report, output is... Remember, your client may never have heard of the term ‘yottabyte’, or a relational table, or a join, or a multidimensional analysis, or even a database (and may not know about Microsoft or Linux or even RedHat)

CSE9020 Semester Week 02 / 24 Meetings Meetings can consume much time, particularly if they are not organised and controlled The next few slides give some pointers which will improve the productivity and benefits of meetings

CSE9020 Semester Week 02 / 25 Meetings Meetings should not ‘happen’ - they should be arranged There should be a number of specific items to be discussed These items should be detailed, referenced and supported by previous decisions, directions, agreements Items should be introduced by the Chair, or by named members attending the meeting

CSE9020 Semester Week 02 / 26 Meetings Those people expected to attend a meeting should be given prior notice of the items to be discussed Those people expected to attend should be given adequate and accurate details of the nature of the items to be discussed Those people should be given sufficient time to become familiar with, or to be able to generate comments on, the items to be discussed at the meeting

CSE9020 Semester Week 02 / 27 Meetings Those required to attend a meeting should be given a firm time, location and venue for the meeting - a map may be necessary if the attendees are unfamiliar with the location or venue e.g. Campus and Building/Level/Rooms at the Caulfield or Clayton Campuses. Those required to attend should give an acceptance of their attendance. If there is an ability to attend at a particular time, location or venue, a decision must be made to –proceed as planned –reschedule –notify those unable to attend of the conclusions, directions, and outcomes of the meeting

CSE9020 Semester Week 02 / 28 Meetings Meetings should have a stated commencement time, and an expected closure time There must be an agenda The agenda must be circulated to all those expecting to attend All relevant materials, or references to them, must be included in the meeting outline

CSE9020 Semester Week 02 / 29 Meetings Agendas should be discussed and approved at the previous meeting Failing that, each member expecting or required to attend should receive a formal statement of the agenda Attendees, apologies and non-attendances should be recorded

CSE9020 Semester Week 02 / 30 Meetings Meetings can also be arranged and held via telephone and s. It is a good move for the ‘minute taker’ to keep a record of the proceedings.

CSE9020 Semester Week 02 / 31 CSE9020 CASE STUDY and CSE3200 The Unit material is located at the web site and the reference to the Thomsett Project Risk list is

CSE9020 Semester Week 02 / 32 CSE9020 CASE STUDY Week1 Room Allocations: Lecture Theatre - S Block, Link Theatre 6.00pm Evening Supervisor Sessions: B Monday - Erling Breaden B Monday - Dempsey Chang B Monday - Santosh Kulkarni B Monday - Joseph All rooms are booked from 7.30pm

CSE9020 Semester Week 02 / 33 Details Rod Simpson –Office: C4.46 –Phone: –I’m normally in every day except Wednesdays

CSE9020 Semester Week 02 / 34 CSE9020 CASE STUDY Week2 Finally : Building Evacuation: There are no Floor Wardens on the Campus in the evenings If the Building Evacuation Warning System activates: –Collect your belongings –Exit by the EXIT doors –Do not use Lifts or Escalators –Head for the lawn (common) outside K Block - leave the Campus at your discretion TREAT EVERY EVACUATION ALERT AS REAL