5/7/2003Edgar L. Black IIT MICE Meeting at Columbia University Hydrogen/Focus Module Components assembly Details concept June 13,2003.

Slides:



Advertisements
Similar presentations
Euratom Mechanical operation on the TPL sector E.Delmas – December 8th /13 Disassembly and reassembly of a sector of the Toroidal Pumped Limiter.
Advertisements

Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
Liquid Hydrogen Absorber
RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Installation Quick Guide AD400 Cylindrical 6/01/13 Doc #
Photo KEK March-28, 2002 MICE Absorber and Test Cryostat Shigeru Ishimoto (KEK) Shoji Suzuki (KEK) Edgar Black (IIT) Mary Anne Cummings (NIU) (1) MICE.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
Goodson Tools and Supplies for Engine Builders
MICE Collaboration meeting at RAL 26 th Oct ~ 29 th Oct, 2004 Wrap up on Radiation Shielding Module Design Stephanie Yang 26 th October, 2004.
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
Engine Upper End Chapter 18.
1 Hose and Lines. 2 High side / low side System with an expansion valve High SideLow Side Condenser Evaporator Receiver/Drier Compressor Expansion valve.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
Agreement on scope of supply and extent of interface among different suppliers of the AFC module This talk covers the scope of supply on the Absorber Focus.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Module Vessel Connection Concept Steve Virostek Lawrence Berkeley National Laboratory AFC Module Meeting April 23, 2004.
Status of the Modular and Field- Period Replacement Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and L. El-Guebaly ARIES Meeting.
9/26/2003E.L.B. MICE Meeting 9/26/2003 Absorber design update Edgar L. Black IIT.
MICE Meeting at Columbia University June 13, 2003 Implementation of argon gas jacket Edgar L. Black IIT.
MICE Engineering Integration Update August 13, 2003 Edgar L. Black IIT.
Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
Absorber/vacuum windows and absorber assembly 1.Window Requirements 2.MICE experimental constraints 3.Welded vs. non-welded windows 4.Installation 5.Testing.
Progress on the Coupling Coil & Focus Coil Interface Engineering
MICE modules interface proposal FAC module Phone meeting Edgar Black IIT 2/13/2004.
Skilled Trades 1201 Residential Plumbing.
11/26/2002Edgar L Black IIT MICE Video Conference November 27, 2002 Summary of safety implementation for proposal.
MICE Meeting at Columbia University Absorber windows design comparisons E.L.Black/IIT June/2003.
Non-welded Window Option Edgar L. Black IIT August 15,2003.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
MICE Collaboration Meeting March 29 - April 1, CERN MICE Integration Edgar Black/IIT March Room.
5/7/2003Edgar L. Black IIT MICE Integration Meeting Hydrogen/Focus Module Components Details development May 9, 1003.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
Integration March 18, 2004 Latest MICE integrated lattice layout Edgar L.Black IIT.
Review of the mechanical design of the final focusing region of the HIF Point Design T. Brown ARIES Project Meeting January 8, 2003.
Disassemble, Assemble and Perform a Function Check on the M9
Flange facings Contact surfaces to seat the sealing gasket material.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
New Mexico FFA Agricultural Mechanics Career Development Event Engine Power.
Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.
“Fix Tube Sheet” Heat Exchanger
Residential Construction Window Installation Guide *Source: (1) Carpentry & Building Construction Feirer & Feirer (2) Sill to Sash; A Professionals Guide.
994 2½ ”- 10”. Modification Overview  Production for the 994 began in 1999 and is current.
Automotive Brake Systems, 5/e By James D. Halderman Copyright © 2010, 2008, 2004, 2000, 1995 Pearson Education, Inc., Upper Saddle River, NJ All.
Issues with variable thickness absorbers Iouri Ivaniouchenkov, RAL MICE Video Conference, 22 Jan
Copyright by Team 5- Group Document contains personal property from a team effort and Patent Protection will be supported, this is a message of intent.
LF866 2½”-10”. Product Overview  Production of the 2½” – 10” sizes began in  The LF866 utilizes a Type 2 bypass (Model LF619 single check).
December 13, 2006 Blanket and Shield Design Considerations for Magnetic Intervention G. Sviatoslavsky, I.N. Sviatoslavsky, M. Sawan (UW), A.R. Raffray.
MICE LH2 Absorber Safety Mary Anne Cummings Edgar Black (IIT) Abingdon, UK Oct. 30, 2003.
4D-200, 4D-700 2½”- 10”. Modification Overview  Production began in 2003 and was discontinued in  The 4D-700 (RPDA) uses a Type-II bypass (single.
375, 375XL 1¼” -2”. Modification Overview  Production of the 1¼” -2” 375 began in 2004 and is current.  The lead free version 375XL was introduced in.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
13 Engine Top End Construction Chapter Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives After studying.
Linear actuator Cylinders Single acting Double acting
LANDING GEAR SYSTEMS THIS TRAINING MANUAL HAS BEEN PREPARED FOR MAINTENANCE TECHNICIANS AND DOES NOT SUPERSEEDED INFORMATION CONTAINED IN APPLICABLE AIRCRAFT.
FIRST VIDEO CONFERENCE JANUARY 7, 2004 Edgar L. Black IIT
Automotive Engines Theory and Servicing
new straw end plug: D=10.6 mm straws support frame Levan option
HYDRAULICS & PNEUMATICS
Vacuum chamber for experiment HIHEX at FAIR
Required tools for installation of a V-1020C Speaker with V-9914M-5 Metal Bridge.
Valve Manifold Assembly/Disassembly
Experimental equipment Edgar L. Black February 17, 2019
909 3/4”-2”.
Required tools for installation of a V-1020C speaker with V-9914 bridge.
880V 21/2”-10”.
Challenges and Deadlines for Production
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

5/7/2003Edgar L. Black IIT MICE Meeting at Columbia University Hydrogen/Focus Module Components assembly Details concept June 13,2003

5/7/2003Edgar L. Black IIT MICE windows new attachment concept This design proposes an attachment for the windows assembly using Garlock Helicoflex or equivalent seal and a periphery wedge retainer for both, absorber and manifold windows. A tool is designed to protect the delicate windows for handling and to aid on the installation and removal of the windows for either of the chambers

5/7/2003Edgar L. Black IIT WINDOW INSERTION TOOL Tool/window assembly Manifold housing Vacuum chamber

5/7/2003Edgar L. Black IIT Method of operation Pre installation- The seals are installed in grooves machined in the seating flange of the manifold or vacuum chamber The window is attached to the leading end of the tool plunger. 1-The tool outer housing is bayonet inserted and locked in to the manifold or chamber shell which becomes the fulcrum for the operation of the tool

5/7/2003Edgar L. Black IIT Chamber Seating flange Tool housing Bayonet connection Tool housing Locking segments retracted

5/7/2003Edgar L. Black IIT 2-The tool plunger is guided and positioned aligned through the tool housing and seated on to the window seat By an integral mechanical device of the tool, the plunger is actuated to develop the operating compression of the seals ~800 lb/in Helium sealing force. Helium sealing level: Q< atm cm 3 /s

5/7/2003Edgar L. Black IIT Plunger Housing Locking segments retracted

5/7/2003Edgar L. Black IIT 3-With the same tool wedge shaped retaining segments (parts assembled on the window) are expanded in to the groove at the periphery of the manifold shell, wedging the window in place and maintaining the required operating compression for the seals at all temperature and pressure variations

5/7/2003Edgar L. Black IIT Locking segments expanded into the chamber groove

5/7/2003Edgar L. Black IIT To complete the installation, the window/plunger attachment is unlocked, the plunger is retracted and the tool assembly is removed. To remove a window the process on 1 and 2 are repeated and on 3- the segments are retracted

5/7/2003Edgar L. Black IIT

5/7/2003Edgar L. Black IIT

5/7/2003Edgar L. Black IIT