Feb 2006Jean-Sébastien Graulich PID Front End Electronics, Outlook after DAQ Workshop 02 Jean-Sebastien Graulich, Univ. Genève o Introduction o Tracker.

Slides:



Advertisements
Similar presentations
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE meeting at LBNL 10.Feb.2005 DAQ system for KEK test beam Hardware Software Processes Architecture SciFi.
Advertisements

MICE Fiber Tracker Electronics AFEII for MICE (Front end readout board) Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs.
Mice VC Nov 2005Jean-Sébastien GraulichSlide 1 The ADC Problem in MICE o Reminder: Spill, Readout and Digitization o Acquisition Rate vs dead time o Conventional.
CHL -2 Level 1 Trigger System Fully Pipelined Custom ElectronicsDigitization Drift Chamber Pre-amp The GlueX experiment will utilize fully pipelined front.
Daresbury Aug 2005Jean-Sébastien Graulich Detector DAQ Overview and Needs Jean-Sebastien Graulich, Univ. Genève o Introduction o Detector Systems Overview.
April 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Goal for BTF o Status o First results o To be done.
Tracker DAQ Makoto Yoshida (Osaka Univ.) MICE Frascati 2005/6/27.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 DDAQ Hardware Architecture o General Architecture o Tracker Baseline o TOF Baseline & Options o EmCal Baseline.
MICE Tracker Readout Overview channel AFE II-t boards - 8 Visible Light Photon Counter (VLPC) cassettes - 4 cryostats.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ for BTF o BTF Overview o Hardware Overview o DAQ Software Description o What’s next o Summary Jean-Sebastien.
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE Tracker KEK Mar. 30, 2005.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 Does IPM System Matches MICE needs ? Personal Understanding and Remarks o General Considerations o Front.
MICE DAQ and Controls ReviewJean-Sebastien GraulichSlide 1 DAQ Overview o Terminology o Requirements o Front End Electronics o Trigger System o DAQ Hardware.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DDAQ Pending Issues o Detector FEE o Software framework o Trigger o Data Storage Jean-Sebastien Graulich,
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Report on FEE for PID o Reminder o TOF o EMCAL o Summary Jean-Sebastien Graulich, Geneva.
TOF Front End electronics
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
STaRBoard Jamal Rorie 5/09/06. Data Collection TDC Leading Edge Lo Level Discriminator Mean Timer 1:3 Splitter ADC Leading Edge Hi Level Discriminator.
Introduction MICE DAQ Workshop Fermilab February 10, 2006 A. Bross.
VC Sept 2005Jean-Sébastien Graulich Report on DAQ Workshop Jean-Sebastien Graulich, Univ. Genève o Introduction o Monitoring and Control o Detector DAQ.
MICE CM17 Feb 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM16 o Detector DAQ software o Front End Electronics o Schedule Milestones o.
Ionization Profile Monitor Project Current Status of IPM Buffer Board Project 10 February 2006 Rick Kwarciany.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
MICE Workshop Sept 2004 AFEII for MICE Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs between them. AFE has 8 identical.
M. Bonesini DAQ Meeting1 M. Bonesini INFN Milano Some Considerations for MICE TOF Stations FE electronics (mainly TOF0)
1 MICE/AFE II t Update IIT Analog Front End (AFE) Test Stand AFE Conceptual Design Report (CDR) Terry Hart, Illinois Institute of Technology, February.
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
RENO Electronics - QBEE - 장 지 승 ( 전남대학교 ) RENO Collaboration Meeting,
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
VC MICO Report July 07Jean-Sébastien GraulichSlide 1 Main news  DAQ test bench running in Geneva 2 LDCs connected to 2 different PCs, 1 GDCs DAQ trigger.
TOF Electronics Qi An Fast Electronics Lab, USTC Sept. 16~17, 2002.
MICE CM18 June 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM17 o Detector DAQ software o Front End Electronics o Schedule Milestones.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM15 o Detector DAQ software o Interface DDAQ / Mice Control & Monitoring.
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
Mice CM Oct 2005Jean-Sébastien GraulichSlide 1 MICE Collaboration Meeting Oct05 Review of DAQ Workshop and DAQ Issues Jean-Sebastien Graulich, Univ. Genève.
A First Look at the June Test Beam DAQ Hardware architecture Talk Presented 8 April, 2008 John Anderson HEP Electronics Group Argonne National Laboratory.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
M. Bonesini – CM 291 PID detectors summary M. Bonesini Sezione INFN Milano Bicocca.
January 17, MICE Tracker Firmware Dead Time and Muon Detection Studies for the MICE Tracker Tracker Data Readout Basics Progress in Increasing Fraction.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Report on DAQ & CAM o Detector DAQ Status Hardware Trigger Software o Controls and Monitoring (CAM) o.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
C.Beigbeder, D.Breton, M.El Berni, J.Maalmi, V.Tocut – LAL/In2p3/CNRS L.Leterrier, S. Drouet - LPC/In2p3/CNRS P. Vallerand - GANIL/CNRS/CEA SuperB -Collaboration.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
"North American" Electronics
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
Tracker TriP-t Test Stand
Jean-Sebastien Graulich, Geneva
Designing electronics for a TOF Forward PID for SuperB D. Breton & J
AFE II Status First board under test!!.
Ewald Effinger, Bernd Dehning
Muon Recording Studies and Progress for the MICE Tracker
ZDD status BESIII Collaboration Meeting, September 2012
Presentation transcript:

Feb 2006Jean-Sébastien Graulich PID Front End Electronics, Outlook after DAQ Workshop 02 Jean-Sebastien Graulich, Univ. Genève o Introduction o Tracker o TOF o EmCal o Conclusions and Plan

Feb 2006Jean-Sébastien GraulichSlide 2 Introduction  DAQ WS02 took place at Fermilab, Feb 10 – Feb 11  10 people registered, 5 more connected by phone  Workshop goals Review on Front End Electronics Review on Data Storage and Online Computing Rem: No discussion on Control and Monitoring

Feb 2006Jean-Sébastien GraulichSlide 3 On the Agenda  Talks on Front End Electronics for DDAQ J.S. GraulichBaseline hardware architecture T. HartAFE IIt I. RusinovStretcher/Integrator Solutions K. BowieTeV IPM – Front-End Board R. KwarcianyTeV IPM – Reciever Board M. BonesiniTOF Front End Electronics J.S. GraulichIPM for MICE ?  Talks on Data Storage and Computing M. EllisData Storage (and Computing needs)  + A lot of discussions

Feb 2006Jean-Sébastien GraulichSlide 4 WS Goals (A. Bross)  Advance us towards making final decisions on the DAQ and front-end electronics  Why is this important?  Straw man timeline: Taking Data 6/07 DAQ System Debug 3/07 DAQ System Install 12/06 DAQ System Procure 8/06 DAQ System Final Spec 7/06 DAQ System TB (BTF) 6/06

Feb 2006Jean-Sébastien GraulichSlide 5 AFE II-t (T. Hart)  VME to PC data throughput should be fine for MICE - If MICE uses a data word format similar to that used for the KEK tests, each muon event with charge and time information will have about 65,280 bytes. - (600 muons/sec)  (65,280 bytes) = 37.3 MB/sec. This is achievable with the 47.4 MB/sec capability mentioned earlier.  Full digitization of charges and times limit reconstruction rate to about 225 muons/spill. - Total digitization time for 32 channels on a TRIP-t chip is about 4.4  s or about 225 muons/sec. - If only discriminator information is used (Hit or no hit?), maximum instantaneous rate is about 7000 muons/sec. - MICE/AFE II t CDR discusses this in detail.

Feb 2006Jean-Sébastien GraulichSlide 6 MICE/AFE II-t Plans (T. Hart)  Prepare CDR and TRD.  Set up IIT test stand to become part of the D0 AFE II t tests.  Determine special MICE requirements and test AFE II t boards for these.  Set up RAL test stand for tracker quality control.

Feb 2006Jean-Sébastien GraulichSlide 7 TOF FEE Summary Baseline: Constant Fraction Discriminator (CFD)  Advantage:  Advantage: Easy Cabling and No need for ADC  Drawback:  Drawback: No information at all on the charge (Energy Deposit)  Cost (TDC excluded):  Cost (TDC excluded): ~ 230 EUR/ch (CFD) (please update! Sorry) Option 2 : Measure the charge with CAEN QDC Option 3 : Measure the charge with Tev-IPM QIE  Advantage:  Advantage: More Precise Time Walk correction and Good Charge Measurement (useful for PID)  Drawback:  Drawback: Not available yet, not tested Requires Splitters and delay cables  Cost (TDC excluded):  Cost (TDC excluded): ~ 150 EUR/ch (Discri) (please update! Sorry) 200 EUR/ch (QDC) or ~ 160(?) EUR/ch (QIE) Assuming free splitters and delay cables (from HARP) Option 4 : Use Time over Threshold Discri (NINO)  Advantage:  Advantage: Easy Cabling and Good precision and Charge Information  Drawback:  Drawback: Not available yet, not tested, not linear in charge  Cost (TDC excluded):  Cost (TDC excluded): ~ 50 EUR/ch (Board production) Same as EmCal

Feb 2006Jean-Sébastien GraulichSlide 8 EmCal FEE Summary Option 1. Conventional gated QDC  Advantages Familiar, proven design Standard VME board, well documented Support from the company (CAEN), the equipment have a long live after MICE  Drawbacks The module does NOT exist yet, prototype could be delivered at the end of the year  Cost Transformers (since PMt have differential outputs) + Discriminators (150 EUR/Ch) + TDC ( 60 EUR/ch) + QDC (200 EUR/ch) + Delay Cables

Feb 2006Jean-Sébastien GraulichSlide 9 Problem With Option 1.  850 microsecond RF Flat top  Multiple events per burst rejected  #events vs dead Time -> QDC with 500 ns Digitization time !!!

Feb 2006Jean-Sébastien GraulichSlide 10 EmCal Charge Measurement Options Option 2. QIE (TeV IPM)  Advantages No dead time Precise Charge measurement The transformer can probably be included in the front end board (if we re-layout the board…) Could be used for TOF (or CKOV) charge measurement  Drawbacks Not a plug-and-play system Not Linux based -> require software work Not VME readout, makes the DAQ more tricky.  Cost + QIE+Buffer+Timing (160(?) EUR/ch) + Discriminators (125 EUR/Ch) + TDC ( 60 EUR/ch)

Feb 2006Jean-Sébastien GraulichSlide 11 QIE General Description The system is designed for a PC based DAQ The system is not yet fully commissioned 4 different cards are needed Among them 2 are PCI cards for which there is no Linux driver available An outdated driver exists for the Data Buffer cards The Front End Board is the QIE Card. It integrates the charge received on the input over a given time (the sampling period) and transfer it to the Buffer Card in a free running continuous mode. No dead time. Data in coincidence with the “Gate” signal is tagged (one bit in the header) The Buffer Card is also doing Data Sparcification It is possible to store only the data which is tagged as being in coincidence with the “Gate” It has a very large buffer memory (enough to store 400 ms of continuous sampling at 15 MHz) The Timing Card is also doing the Control for the QIE Cards It is doing the initialization of the QIE Card, under request from the PC It provides the sampling clock (here 15 MHz, up to 35 MHz possible) It has two external TTL (Lemo) inputs. The interpretation of the input signals is determined by firmware. They can be used as gate inputs. Input Signal Timing card (PCI) Timing fanout QIE cards (16x 8 ch) Data Buffer (2*8 ch) (PCI) Host PC (LabView) “Gate”

Feb 2006Jean-Sébastien GraulichSlide 12 EmCal Charge Measurement Options Option MHz Flash ADCs  Advantages No Splitter, no delay, no discri, no TDC ! Cabling very easy Equipment has a long life after MICE  Drawbacks Transformer -> Shaper Time resolution not tested  Cost Flash ADC (450 EUR/ch) 2 ns rise time Shaper V thr t thr >30 ns rise time If we can fit the rising edge, time resolution can be much higher than the 5 ns of the sampling rate.

Feb 2006Jean-Sébastien GraulichSlide 13 FEE Conclusions  Decision 3 FEE Options will be tested in Geneva before BTF NINO for TOF QIE-IPM for EmCal 200 MHz Flash ADCs for EmCal  Plan Bring everything for test in Geneva - QIE-IPM system from Fermilab. - PMTs + cables for TOF and EmCal Setting up a test lab at CERN Test DAQ system and VME-PCI interface first Test NINO chip using CERN/MIC test board Test QIE-IPM as soon as we receive the parts Test Struck 200 MHz Flash ADC