Tracker Week – UCSB Gantry Status – Febuary 10, 2004 – Dean White 1 Gantry Status University of California Santa Barbara UCSB Gantry Team: Andrea Allen.

Slides:



Advertisements
Similar presentations
Clean Room Plans Monday, August 23, Hybrids--- Frames--- SensorsModules.
Advertisements

Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Status Brussels GANTRY Ê We have observed a significant influence due to temperature 4 we had a lot of problems with our cooling system (ventilation) Ë.
Module Production Brussels Ê Problems with vacuum chambers in plate solved 4 Almost all plates back in Brussels (repaired in Aachen) Ë Problem with rotation.
Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara Dean White.
US Tracker Production Meeting, March 8, 2005 J. Incandela 1 Slides for the US Si Tracker Weekly Production Meeting J. Incandela March 8, 2005.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.
1 UCSB Module Assembly Week of 5/16-5/20. 2 UCSB Parts Inventory 5/23/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd
TEC Production in the US J. Incandela Level 2 Manager US CMS Silicon Tracker Project October 8, 2003.
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
US Production Report - September 4, Incandela 1 US Production Report CMS Tracker Steering Committee 4 September 2003 J. Incandela University of.
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
1 Hybrid & Module Testing Status Week of 4/25-4/29.
Recent TOB Developments First LT failure and Stereo Module Status J. Incandela With slides provided by E. Chabalina, A. Affolder, Dean White.
US CMS Silicon Tracker : Schedule J. Incandela University of California Santa Barbara US CMS Silicon Tracker Project Manager Fermilab PMG April 9, 2004.
Slide 1CMS Database Issues-Derek BargeDOE review, January 20, 2004 CMS Database Issues Derek Barge.
CMS Week – UCSB Gantry Status – March 15, 2005 – Dean White 1 Weekly Status Report Production: 84 hybrids bonded last week, all tested fine. 45 modules.
1 UCSB Module Assembly Week of 5/23-5/27. 2 FNAL & UCSB Inventory HybridsSensorsFrames FNALUCSBFNALUCSBFNALUCSB STHPKITSTHPKITSTHPKITSTHPKIT L12pu /
1 UCSB Module Assembly Week of 4/11 – 4/15. 2 UCSB Parts Inventory 4/4/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
1 CMS week 15/03/05, Module Production Meeting, Dean White - UCSB Status of Sensor Bias Connection Dean White For the US CMS Group.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
1 UCSB Module Assembly Week of 5/9-5/13. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
Finding ST Sensors that cause CMN: A Follow up to TSC Meeting N. 215 Prof. J. Incandela UC Santa Barbara US CMS Tracker Project Leader Tracker Steering.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
US Module Production Prof. J. Incandela US CMS Tracker Project Leader For the US CMS Tracker Group Tracker Meetings - CERN Feb. 13, 2004.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave Staszak.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
Status of TOB Modules & Rods J. Incandela For the US CMS Tracking Group Tracker Week, Feb
Slide 1-OGP status & module reinforcementDOE review, January 20, 2004 Status of OGP & Module reinforcement Andrea Allen Development Technician DOE Review.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
1 UCSB Module Assembly Week of 5/2-5/6. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
1 UCSB Module Assembly Week of 4/25 – 4/29. 2 UCSB Parts Inventory 5/2/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
2S Module Workshop, 30 Jan 2012 Module positioning and cooling contacts 2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN  The objectives  Module positioning.
Status Brussels GANTRY Ê Overview of the pilot run (second week of October) 4 aims and achievements 4 accuracy on position and angles 4 residual features.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
Status Brussels GANTRY Ê Recovered from the Gantry PC crash during Pilot Run R6 4 same situation as before the Pilot Run is achieved for R6 Ë Comparison.
Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
CMS Tracker Week, CERN, February Feb 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
Brussels Module Production Ê We have producted 57 R6 modules and 26 R5N modules 4 of which 67 grade A and 9 grade B and 7 outside specifications Ë We have.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
1 SVT Status Update Yuri Gotra CLAS12 Silicon Vertex Tracker TCB Meeting March 13, 2015.
Status Brussels GANTRY Ê New measurements of pin positions 4 using short pins rather than long ones 4 improved the precision Ë Cross-check of precision.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
Brussels Gantry Ê Problems with vacuum chambers in plate 4 mostly solved by the workshop in Aachen (thanks) Ë Problem with rotation motor (U-motor) 4 motor.
Ladder Assembly All tools and jigs produced Glue dispensing works
Phase 2 Outer Tracker Module analysis
Status Brussels GANTRY
US Module Production Status
Vienna Module Production
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
Module Production in Brussels
OGP Surveying & DB Entry
Module Production in Brussels
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
TOB Module Production Overview and Plan
Hybrid & Module Testing Status
Wirebonding UCSB FNAL Machines
Hybrid & Module Testing Status
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Hybrid & Module Testing Status
Hybrid & Module Testing Status
FNAL Hybrid Testing Status
Presentation transcript:

Tracker Week – UCSB Gantry Status – Febuary 10, 2004 – Dean White 1 Gantry Status University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave Staszak Russell Taylor Dean White

Tracker Week – UCSB Gantry Status – Febuary 10, 2004 – Dean White 2 TEC Module Production Completed 1 st TEC R6 assembly plate. Produced 4 modules on it in mid-December. All within gantry module specifications. Plan to produce 30 TEC R6 modules over 2 week period (3/day) starting next week.

Tracker Week – UCSB Gantry Status – Febuary 10, 2004 – Dean White 3 TOB Module Production Just completed 150 module production run over 2 week period (15 modules/day) 5 TOB r-phi assembly plates in the curing cabinet.

Tracker Week – UCSB Gantry Status – Febuary 10, 2004 – Dean White Module Production Run Delta Sili1X3 Sili2X1 Sili1 Sili2 Angle Red arrows show cuts

Tracker Week – UCSB Gantry Status – Febuary 10, 2004 – Dean White Module Production Run Sili1 to Frame Angle Sili2 to Frame Angle

Tracker Week – UCSB Gantry Status – Febuary 10, 2004 – Dean White Module Production Run Hybrid Y2-Y2nom Delta Sili1X1 HybridX1

Tracker Week – UCSB Gantry Status – Febuary 10, 2004 – Dean White Module Production Run 8 modules flaged during 150 module run. Module #ProblemLocation 5061Hybrid Y2-Y2nom = 245umPlate 4, module Sili1/Sili2 angle = 11 mdegPlate 4, module Sili1/Sili2 angle = 11 mdegPlate 2, module Sili1/Sili2 angle = 14 mdegPlate 2, module Sili1/Sili2 Angle = 20 mdeg Sili2 frame angle = 12 mdeg Plate 2, module Sili2 frame angle = 11 mdeg Sili2 X3-X3nom = 32 um Plate 1, module Sili1/Sili2 angle = 17 mdegPlate 2, module Hybrid Y2-Y2nom = 221umPlate 4, module 1

Tracker Week – UCSB Gantry Status – Febuary 10, 2004 – Dean White Module Production Run Although angular placement of individual sensors with respect to the frame was quite good (2 flags for 300 sensors placed), there was some difficulty meeting the sensor to sensor angle (5 flags). Since we now have data on 150 modules, we will be adding U rotation corrections to each position on the assembly plates if needed. We will also update the basic X and Y corrections that we have been using. Even with these corrections the 10 mdeg angle between sensors seems quite tight. Could this be opened up to 15 mdeg? The 2 modules flaged for hybrid placement each had one end of the PA very close to the sensor, but both were wirebonded without problem. These 2 modules were both built at the same position. After finding no obvious mechanical problem with the position, we added.5mm thick silicon rubber on the feet of our hybrid tool to keep the hybrid from sliding around on the tool. Modules made after that were fine. We plan to add it to our other hybrid tools.

Tracker Week – UCSB Gantry Status – Febuary 10, 2004 – Dean White Module Production Run Overall production went smoothly (15 modules/day for 10 days in a row). After-cure surveying of 15 modules and production of 15 new modules (5 plates) could be accomplished by 3:00 if no problems were encountered. This seems to be about max production for 2 technicians per 8 hour day if parts reception and preparation are also included. Module gluing items: Using syringe pistons without a hole. Get more consistent dispensing. Can use one syringe of DC 3140 for all five plates of modules during a day. Mix RTV12 and Tra-Duct 2902 for every assembly plate. Do not use syringe tip position check tool. Manually check for misaligned tips. Also check tip length after assembling on glue tool. Built tip length test fixture to easily do this check (avoids potential gantry E-stop if tip is too long).

Tracker Week – UCSB Gantry Status – Febuary 10, 2004 – Dean White 10 Additional Assembly Plates 10 more module assembly plates are in different stages of design and construction: 2 more TOB R-phi plates – dwgs are in the Physics machine shop, parts are expected to be done by the end of February. 2 more TOB stereo plates – dwgs are in the Physics machine shop, parts are expected to be done by the end of February. 2 more TEC R6 plates – dwgs are in the Physics machine shop, parts are expected to be done by the end of February. 2 TEC R5N plates – design in progress. Plan to make 1 st modules in March 2 TEC R5S (stereo) – design in progress

Tracker Week – UCSB Gantry Status – Febuary 10, 2004 – Dean White 11 Misc. Gantry Items 5 sets of U600BASE/32MB Controller & 4EN-PC Expansion cards for the European gantries will arrive at UCSB by mid February. Order placed in mid- Dec.