7/16/03LC TB Summary1 LC TB Goals and Organization Detector groups have made significant progress Individual detector groups have been working on TB efforts.

Slides:



Advertisements
Similar presentations
U.S. Department of the Interior U.S. Geological Survey Beyond the Archive Task Team Discussion at WGISS #25 February, 2008 Lyndon R. Oleson U.S. Geological.
Advertisements

U.S. Department of the Interior U.S. Geological Survey Data Services Task Team Proposal Discussion at WGISS #25 February, 2008 Lyndon R. Oleson U.S. Geological.
Network Summit – Network Tools The Role and Working Methods of Regional Networks in the European Union Colm Mc Colgan General Manager ERNACT Network.
FCMAT Response & Preparation: Process Outline October 25, 2006.
Copyright © 1997 CompassPoint Nonprofit Services What Does a Strategic Plan Look Like & How Do You Keep It Relevant? Anushka Fernandopulle CompassPoint.
Calorimetry Summary Dhiman Chakraborty, NIU Linear Collider Workshop UC Santa Cruz, 29-june-2002.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Dhiman ChakrabortyCal+mu+p-id+test-beam summary LC workshop, Cornell, 16 July, '03 2 Calorimetry Performance goals Electromagnetic Calorimetry (ECal)
A Final Word ILC Jan 8th, 2005 Eric Torrence University of Oregon.
UCLC Meeting UCLC Raison d’etre Steps to proposal (Oct 15 submission) Plans for Today Ritchie Patterson June 30, 2002.
ILC Spanish Meeting – Gandía, 1 de Diciembre de /25 ILC Communication and Outreach ILC Communication and Outreach Perrine Royole-Degieux
D. Peterson, “WWS R&D Panel Project Registry”, ALCPG, Snowmass, 20-August World Wide Study Detector R&D Panel Project Registry Web Site web site:
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
EGEE is a project funded by the European Union under contract IST NA2 Dissemination John DYER Activity Leader All Activity Meeting, CERN 18.
1 EUDET Status Report NA1 Management Joachim Mnich Extended Steering Committee Meeting September 11, 2006.
CHIPP Workshop on Detector R&D June - University of Geneva Common R&D for astroparticle physics: Activities of ApPEC and ASPERA Bernard Revaz and.
User Group Priorities for Development. Assumptions ER system still remains in place –Capture individual user input –Repository of good ideas that will.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Test beams for Introduction and plan for discussion EUDET contract to end Dec ‘Mombusho’ to end…. Canada funding secure till April 2012.
Convenors: David Harris & Elspeth Haston: RBGE. CETAF members are free to join the CETAF Digitisation Working Group (contact:
ARISS meeting ESTEC 2014 ARISS Europe - Regional Scheduling Procedures Francesco De Paolis – IKØWGF.
Charge to the Workshop (and a report from WWS) Hitoshi Yamamoto July 11, 2005 ACFA8, Daegu, Korea.
Managing Projects and People Summary Define the scope Plan the goals, milestones and deliverables Determine each person’s realm Assign work Monitor.
Lucie Linssen, CLICdp, (bi-)monthly meeting, July 21st CLICdp news CLICdp (bi-)monthly meeting July 21 st 2014.
Summary, Action Items and Milestones 1 st HiPCAT THEGrid Workshop July 8 – 9, 2004 Univ. of Texas at Arlington Contact Jae Yu or Alan.
ILD workshop 119 participants (including last minute registrations which are not on the WEB) 2 days of contributions lively discussions, which had to be.
Beam Test Activities LC Test Beam Activities VLCW06 July 20, 2006 Jae Yu Facility updates Beam Test Activities FNAL ILC-Task Force Conclusions.
Comenius – ACE 2011 Active Citizenship Europe Project meeting Almaden Spain 27 March – 01 April AT1-COM
ARIP Technical Committee Convener Call 07 April
CTI Technical Committee Convener Call 11 May
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
PROMCODE Technical Committee Convener Call 14 February
Management Tools K. Pommès. Management Tools - The Project Planning Design Purchasing Production Installation To follow the project through its phases.
 Service System Structural Proposals European Perspective.
Physics and Performance Evaluation Group NuFact 07 Okayama University, Japan August 6, 2007 Walter Winter Universität Würzburg for the executive committee:
9/2/2004 TB Strategy J. Yu 1 LC Test Beam Funding and Strategy Large number of detector R&D groups made great progress Technology decision provides great.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
Overview of a Plan for Simulating a Tracking Trigger (Fermilab) Overview of a Plan for Simulating a Tracking Trigger Harry Cheung (Fermilab)
1 EUDET Summary and Outlook Joachim Mnich Annual Meeting 2007 Palaiseau, October 10th Outline:  Summary and Outlook EUDET  Introdution to FP7 discussion.
Introduction This afternoon session is mainly targeting the extracting PDF information from LHC measurements (present and future) This is a follow-up of.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
Fabiola Gianotti, 13/05/2003 Simulation Project Leader T. Wenaus Framework A. Dell’Acqua WP Geant4 J.Apostolakis WP FLUKA Integration A.Ferrari WP Physics.
On S1Global Writeup S1G Writeup Meeting Nobu Toge 1.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Advances In Software Inspection
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
OWASP Foundation OWASP Where we are.. Where we are going.
IWG-Env Subgroup on Water Statistics Projects and Activities
Focus on Internationalization 58% 16% 15% 4.5% 2% Relatively few WDA members in Asia But a fair number of Asians use the WDA website Australasian Section.
Mar. 31, 2003CAL Testbeam Discussion J. Yu 1 Calorimeter Test Beam Goals 1.Test of hardware technologies Feasibilities, properties and performances of.
Atlas Software May, 2000 K.Amako Status of Geant4 Physics Validation Atlas Software Week 10 May, Katsuya Amako (KEK)
TeraGrid Project Management Tim Cockerill Sr Project Manager NCSA April 6, 2009.
ECFA European Committee for Future Accelerators Report from the chairman M. Krammer HEPHY, Vienna, Austria November 21, 2013RECFA CERN1.
ITeach Session 3 of 16 Communicating and Collaborating with Outlook .
Durham TB R. Frey1 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U.
Goals of the consultation meetings From the ToR, the goals of the meeting in the first year should be: communicate that the panel exists; collect input.
CALICE Collaboration Meeting March 2013 Roman Pöschl LAL Orsay Report from the Technical Board CALICE Collaboration Meeting Hamburg/Germany March 2013.
Roman Pöschl LAL Orsay Testbeam plans 2012/13 CALICE Collaboration Meeting Heidelberg September 2011.
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
Final CALICE OsC meeting: Status and summary of project
Test beams future plans - Discussion session-
European Network for Novel Accelerators (EuroNNAc)
Adrian Bevan, Dave Brown, Marco Ciuchini, and Achille Stocchi
LC Test Beam Activities
European Network for Novel Accelerators (EuroNNAc)
ILC Detector R&D in Japan
Technical Board – DCAL Software
3-6-9 MONTH Action Plan Region:
Session #5 Closing Status November , 2003
Presentation transcript:

7/16/03LC TB Summary1 LC TB Goals and Organization Detector groups have made significant progress Individual detector groups have been working on TB efforts independently –ECAL and HCAL testbeam performed already in Europe and Asia –US Calorimeter group leading the effort –Some documents for requirements exist: e.g. Calorimeter group It is time for more systematic organization for a coherent effort for Test Beam –Better if groups work together for preparing common needs –One communication channel to outside  Provides stronger arguments and accomplish better supports –Provide focus to detector development efforts Information on available TB facilities compiled –E. Ramberg from FNAL gave detailed status report on MTBF Need to collaborate with European and Asian colleagues

7/16/03LC TB Summary2 Summary of TB Needs H.E.Fisk

7/16/03LC TB Summary3 Kick-off LCTB group with the responsibilities –Sets the goals and determines directions for coherent TB preparation for all detector groups –Keep up with progress through regular meetings –Sets priorities if conflict arises –Represents LC TB efforts to outside and facilities –Collaborate with European and Asian TB groups Discussion session had some 30 members –Set action items for the next few months Setup communication (mail list, web page and meetings) by Sept., 2003 Compile a TB requirement document that includes all detector groups, if possible, in all regions, by Jan meeting Contact the leaders of LCRD and UCLC for separate sections in the upcoming proposals: Sept Complete the list of subgroup reps.: Sept. 2003

7/16/03LC TB Summary4 Subgroups GroupsRep. CalRepond/Magill TRKD. Karlen MUOFisk will take to the group… Beam MonitoringM. Woods will work on the document Beam-lineWill recruit later Trigger/DAQWill recruit later Facility InfrastructureWill recruit later