Bad News Bots E2 Project Design Review 8 – 4/3/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.

Slides:



Advertisements
Similar presentations
Bad News Bots E2 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland Concept Design Review.
Advertisements

MicroCART Micro processor C ontrolled A erial R obotics T eam Abstract MicroCART is a group of EE/CprE students tasked with developing an autonomous helicopter.
Robo-FootballE2 Project Design Review 1 - 1/31/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
Problem Solving Lab – Part B
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Tuesday March 25, 2008.
Preliminary Design Review HMS Bloodhound Matt Morris, Matt Prygoski, Jay Slaggert Fred Thwaites, Dan Zibton.
Bad News Bots E2 Project Design Review 6 - 2/21/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
Preliminary Design Review Week 6 Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday March 13, 2008.
Interactive Xylophonic Keyboard Mini-Mozarts October 12, 2006 Gordon Farmer Michael Johnson Eric Laumann Bryan Marek Philip Moss.
John Wloch Wind-Aid Preliminary Design Review 8 April 2008 Andy CrutchfieldJames Gates Keri Macaulay David Rupp.
Preliminary Design Review HMS ‘Hound Dog’ Matt Prygoski Matt Morris Dan Zibton Fred Thwaites Jay Slaggert Thursday February 7, 2008.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
John Wloch Wind-Aid Preliminary Design Review 1 April 2008 Andy CrutchfieldJames Gates Keri Macaulay David Rupp.
Pinwheel Technologies (C3)
Preliminary Design Review Week 7 Group A3: HMS “Bloodhound” Matt Prygoski Matt Morris Jay Slaggert Fred Thwaites Dan Zibton Thursday March 20, 2008.
Field Navigational GPS Robot Final Presentation & Review Chris Foley, Kris Horn, Richard Neil Pittman, Michael Willis.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Pratham Presenter: Nick Martin Team Leader: Matt Ryan Chief Engineer: Gabe Letona Fabrication: Reed Langton CADCAM: Fraterno Vila Electronics/Control Engineer:
Bad News Bots E2 Project Design Review 5 - 2/28/2008 Ryan Bove Kara Collins * Peter Courtney Kyle O’Reilly Benjamin Rowland.
PDR: 4/10/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Senior Project Design Review Remote Visual Surveillance Vehicle (RVSV) Manoj Bhambwani Tameka Thomas.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
A6: Team Rallye Potable Water Still Presented by: Full Group November 15, 2006.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Team HazardHawk Team HazardHawk Last Week  Trim Budget Complete ○ Select new driveshaft, sprocket, bearings ○ Select additional component: clips.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday, April 3, 2008.
Toteable, Potable Water A2 Nate Barbera Katie Kimar Ryan Reis Connie Slaboch.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday February 21, 2008.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
Functional Block Diagrams of Wunderbot 3 Subsystems.
AME Senior Design Group E3: Hewlett-Packers February 26, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Preliminary Design Review Week 9 THE DUKES OF HAZARD CAMILLE LEGAULT, NEIL KENNEDY, OMAR ROJAS, FERNANDO QUIJANO, AND JIMMY BUFFI March 20, 2008.
Laser Shoot-Out Game By Steven Noto and Laura Miller Advisor Steven Gutschlag February 15, 2000 Senior Project Status.
Interactive Xylophonic Keyboard Mini-Mozarts November 9, 2006 Gordon Farmer Michael Johnson Eric Laumann Bryan Marek Philip Moss.
Bad News Bots E2 Project Design Review 2 - 2/7/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Controller, Sensors and Motors Ding Ke Tutorial 1, UGB 230N.
THE POSTURE PEDOMETER CUMMERBUND February 2012 Program Review Team Members: Kelly Han Kyle Mauer Kevin Vo Advisors: Dr. Aziz Inan (Faculty) Srija Pidaparthy.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Eye Detector Project Midterm Review John Robertson Roy Nguyen.
Build-It-Yourself develops content and supporting platforms that inspire and guide kids to use technology creatively. Scratch Robotics Construction System.
John Wloch Wind-Aid Preliminary Design Review 11 March 2008.
Team HazardHawk Team HazardHawk 2008 April 24, 2008.
Active Stroke Rehabilitation
Mentors Workshop Control System Sub-System Mark McLeod Team 358 Festo/Hauppauge H.S. F For I Inspiration and R Recognition of S Science and T Technology.
Staircase Climber Project submitted by: Shraddha Joshi Soham Mohidekar
Bad News Bots E2 Project Design Review 4 - 2/21/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
University of Tehran 1 Microprocessor System Design IO Applications Omid Fatemi
Figure 12.1 The UP1-bot. Figure 12.2 Left: Radio Control Servo Motor and Right: Servo with Case and Gears Removed.
Final Demonstration Team 2A The Charles Machine Works Downhole Generator Project.
A.M.E.N. Autonomous Meteorological Embedded Network for Fire Fighting Fan Zhang, Dmitry Stomakhin, Flavio Sira, Brian Hansen.
Figure 12.1 The UP1-bot. Figure 12.2 Left: Radio Control Servo Motor and Right: Servo with Case and Gears Removed.
Team #5 Nicholas Baker Alejandro Haller Matthew Hudson Cristobal Riojas Sep 09, 2011 Fully automated machine that proves the concept of automating construction.
Bangarang Musical Engineering University of Notre Dame Department of Aerospace and Mechanical Engineering Group Members: Roberto Ayala, Ryan Bradley, Pat.
IN 1900 ICT Project Final Presentation. Group name : Code Squad.
Department of Communication Engineering, NCTU 1 Title of Your Project Name.
Scrumm meeting. Mechanical Done. Designed the top part Working on encoders Working on documentation What to do? Work on the top part Finish encoders.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday, April 10, 2008.
Bangarang Musical Engineering University of Notre Dame Department of Aerospace and Mechanical Engineering Group Members: Roberto Ayala, Ryan Bradley, Pat.
Bad News Bots E2 Project Design Review 7 - 3/20/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
CSE 341 Project : Ultrasonic Radar PRESENTED BY: NAME : AKIFA TASNEEM ID : SECTION: 02 1.
ELECTRONICS TELECOM STEM Teachers Summit Handout.
CSU-1 Project Updates Mechanical:
Robot Report “Emerson” Crawford Hampson EEL5666: IMDL April 8, 2010
Simple CNC machine Students: Mahmood Yunis Shadi Tahseen Hanani.
Robert Karas and Frank McCloskey
Software Development Process
Presentation transcript:

Bad News Bots E2 Project Design Review 8 – 4/3/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland

Previous Week’s Action Items E2 Interfacing Interface IR sensor with micro-processor Interface Servo Motor with Microprocessor, establish optimal rotation period and range CNC Machining Begin programming CNC sequencing and machining parts. Order Parts/Materials Order battery pack, brackets, and screws (all in-hand)

Current Project Status Complete Virtual Model All components in-hand All electronics, besides compass, Interfaced and functional Machining Parts

CNC Sequencing and Machining Parts Calibrating Electronics to our optimum settings Combining Code into final logic Concept Design Documentation No Showstoppers Current Project Status

Next Week’s Action Items Finish Machining all Parts Integrate electronics into one circuit Combine all code into one program Build prototype field

Questions/Comments Bad News Bots E2