Introduction: Standard Test Method for Density (unit weight), Yield, and Air Content (Gravimetric) of Concrete –Apparatus –Sample –Procedure ACI Certification.

Slides:



Advertisements
Similar presentations
Procedures for finishing slabs-on-ground Chapter 7.
Advertisements

Jody Stouffer & Brian Wohleben – Lee County High School.
Tests to Verify Low Strength Concrete ACI Georgia Chapter Virgil D. Skipper Seminar June 2009 Robert Jenkins, P. E.
Manual Set-Up for Density by Hydrometer Method ASTM D1298, D287, D6822 and IP160 Feb
1 MFGT104 Materials and Quality Chap 14: Tensile Testing Viscosity and Melt Index Professor Joe Greene CSU, CHICO MFGT 104.
BIODIGESTORES. Materials 1.1 PVC macho adaptor ½” 2.2 five gallon buckets with the bottoms removed 3.1 PVC hembra adaptor ½” 4.2 non-corrosive washers.
Use and Maintenance of Micro-pipettes
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
1 ASTM : American Society of Testing and Materials.
Oct. 22, 2012 Generosity Ludicrous: causing or deserving laughter because of absurdity Do Now: What is a microliter? How many microliter are in one liter?
1 PREPARING CEMENTS. 2 INSTRUCTIONS FOR PREPARING POWDER PREPARING CEMENTS shake powder before use  shake powder before use  don‘t compress powder in.
Dr. Sophia Hassiotis.  Laboratory set up  Personal Protective equipment  Directions for mixing  Slump test  Cylinder casting  Cleaning up your station.
Connecting crank and pivot shaft assemblies. Press fits, or interference fits are sometimes used in manufacturing to reduce manufacturing costs or liabilities.
Volumetric Analysis Apparatus. The Volumetric Flask.
Higher Physics – Unit – Density and Pressure.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
CONSTRUCTING A FIVE CABIN LATRINE
Common Laboratory Glassware and Volumetric Glassware Prepared By Michigan Department of Environmental Quality Operator Training and Certification Unit.
Materials of Construction Dr. TALEB M. AL-ROUSAN
Performing a titration A bluffers guide! Preparing a standard solution 4 Accurately weigh a weighing bottle, recording the mass 4 Add approximately x.
WORKABILITY OF CONCRETE BY
TechConnect Concrete Math.
LINEAR MEASUREMENT.
Intro to Concrete 18.0 & 19.0 Class notes.
Plain & Reinforced Concrete-1 CE-313
Intro to Power Tools Ag Mech I Class Notes. Objectives AM15.01 Explain how power tools are used in agricultural mechanics. AM15.02 Know and demonstrate.
The Cathedral of Our Lady of the Angels. Los Angeles, California Rafael Moneo.
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
Hydraulic Slump. Equipment Slump cone & pan 5/8” x 24” long bull-nose rod Concrete scoop 12” ruler Bucket & sponge.
Measuring Metric Length
AGGREGATES.
UNIT: CONCRETE/MASONARY
Sampling and Testing Concrete Mixes MATERIAL TESTING LABORATORY
Some Tools of the Physical Scientist
Physical Pharmacy SURFACE TENSION
Examination Procedures Goods Sold by Volume
Manual Density Business Today
Sam Krueger.  Entertainment Center  Preliminary design  Initial  36 plies, glass epoxy  [0 11 /±45 1 /90 5 ] s  No core  Modified design  36 plies,
Concrete Field Sampling
GOVERNMENT ENGINEERING COLLEGE, BHARUCH (014) Chemical Engineering department SEM-iii Sub: fluid flow operation topic: orifice meter & rotAmeter Guid by:
SPRING BOX. Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements.
Overdriven Nails in Structural Sheathings Overview.
General Laboratory Techniques Dry Lab Chemistry 1105.
Hussam Khalid Al Mubarak Abdullah Nasser Al Motairi Omar Al Shalhoub
Er. Hiralal Agrawal EXECUTIVE ENGINEER.. Apparatus:  Concrete cube moulds of 15 cm size in required numbers.  Standard tamping bar (steel) of 16mm diameter.
1 Determination of Slump of Hydraulic Cement Concrete Determination of Slump of Hydraulic Cement Concrete (ASTM Designation: C 143) Mohammed Abdullah Al.
ADVANCED MECHANICAL DRAFTING
UNIT: CONCRETE/MASONARY Concrete Proportions Modified by Georgia Agricultural Education Curriculum Office July, 2002.
Marshall & Superpave Mix Design
Direct Shear Test.
FORGING PROCESSES COMMON FORGING OPERATIONS INCLUDE: 1. Upsetting
Machining Turning Definition: A machining operation in which a single point cutting tool removes material from a rotating workpiece to form a cylindrical.
Weighbridge Training Course Beijing - September 2017
Physics Support Materials Higher Mechanics and Properties of Matter
WORKABILITY TESTS OF CONCRETE
MEASURING INGREDIENTS
BORDER SEAL After finish the festooning of all polished surfaces and carving of the cast in the post dam area. Now the next step is to do border seal.
Flasking and wax elimination
Techniques in Molecular Biology 2017 Fall Lecture -2-
Knife Skills 12. Knife Skills 12 Objective Prepare a workstation for knife work.
Dedicated to Quality Partners In Quality
Techniques in Molecular Biology 2017 Fall Lecture -2-
Use and Maintenance of Micro-pipettes
BIODIGESTORES.
What is CONCRETE SLUMP TEST –
2018 Revisions to NYCDOB Code
Common Laboratory Glassware
WORKABILITY OF CONCRETE
PIPE TESTING
Building Good Boxes ACPA Spring Short Course School
Presentation transcript:

Introduction: Standard Test Method for Density (unit weight), Yield, and Air Content (Gravimetric) of Concrete –Apparatus –Sample –Procedure ACI Certification –Section 4 [ASTM C138]

Apparatus –Balance 0.1 lbs accuracy or within 0.3% of the test load [Whichever is greater] at any point within the range of use. Range of use shall be from mass of the measure empty to [measure plus i.e. air meter bowl - 10#s for.25 cft.- 40#s (Range of use) - 50#s ACI Certification –Section 4 [ASTM C138]

Apparatus Tamping Rod – A round,Straight Steel Rod, 5/8 inch dia. –24 in. in length –Tamping end rounded to a hemispherical tip – 5/8 in. ACI Certification –Section 4 [ASTM C138]

Apparatus Internal Vibrator – 7000 vibrations per min.or more –Outside dimension 0.75in and less than 1.50in. –The length of the shaft shall be at least 24 in. ACI Certification –Section 4 [ASTM C138]

Apparatus Strike-off Plate – A flat rectangular metal plate at least ¼ in. thick or a glass or acrylic plate at least ½ in. thick with a length and width at least 2in. Greater than the diameter of the measure with which it is to be used. ACI Certification –Section 4 [ASTM C138]

Apparatus Mallet – A mallet (with a rubber or rawhide head) having a mass of 1.25±0.50lb for use with measures of 0.5 cft or smaller –Mass of 2.25±0.50lb for greater than 0.5 cft. ACI Certification –Section 4 [ASTM C138]

Sample ASTM C172 – 1” nominal max size aggregate –0.2 cft capacity measure ACI Certification –Section 4 [ASTM C138]

Procedure Rod for slumps > 3” Rod or vibrate bet.1”-3” Vibrate < 1” ACI Certification –Section 4 [ASTM C138]

Procedure Rod 25 times <= 0.5 cft Rod 50 times = 1 cft Rod 1 per 3sqin. > 1cft Rod bottom layer not touching the bottom of pale For two top layers penetrate 1 in. into layer below ACI Certification –Section 4 [ASTM C138]

Procedure –After each layer is rodded, tap the sides times –The force should close voids and release air bubble from mix –Add the final layer so as to avoid overfilling ACI Certification –Section 4 [ASTM C138]

Procedure –Fill and vibrate the measure in two approximately equal layers –Do not allow vibrator to touch or rest on bottom or sides during bottom layer vibrating –When vibrating final layer, penetrate only 1 inch into layer below. –No air pockets should be left in mix when withdrawing vibrator –Continue vibration until proper consolidation is achieved ACI Certification –Section 4 [ASTM C138]

Procedure –Concrete must not contain a substantial excess or deficiency of concrete –An excess of concrete protruding approx 1/8 in. above the top of the mold –A small quantity of conc. May be added to correct the dificiency –If there is an excess, remove with a scoop or trowel immediately after consolidation but before struck -off ACI Certification –Section 4 [ASTM C138]

Procedure –Strike-off should be pressed on top of surface about 2/3 of the surface and withdrawing the plate in a sawing motion to finish area originally covered –The place the plate on the top of the measure to cover the original 2/3 of the surface and advance it with a vertical pressure and sawing motion until it slides of the edge –Several final strokes with the inclined edge of the plate will produce a smooth finished surface –After the strike-off, clean all excess concrete from exterior measure and determine mass ACI Certification –Section 4 [ASTM C138]