Role of Fusion Energy in the 21 st Century Farrokh Najmabadi Prof. of Electrical Engineering Director of Center for Energy Research UC San Diego UCLA May.

Slides:



Advertisements
Similar presentations
key drivers of the energy future
Advertisements

1 Summary Slides on FNST Top-level Technical Issues and on FNSF objectives, requirements and R&D Presented at FNST Meeting, UCLA August 18-20, 2009 Mohamed.
FES International Collaboration Program: Vision and Budget Steve Eckstrand International Program Manager Office of Fusion Energy Sciences U.S. Department.
Comments on Progress Toward and Opportunities for Attractive Magnetic Fusion Power Plants Farrokh Najmabadi FPA workshop Jan 23-25, 1999 Marina Del Rey,
Overview of the ARIES “Pathways” Program Farrokh Najmabadi UC San Diego 8 th International Symposium on Fusion Nuclear Technology Heidelberg, Germany 01–
Summary and Closing Remarks Farrokh Najmabadi University of California San Diego Presentation to: ARIES Program Peer Review August 18, 2000 UC San Diego.
Fusion Development Path: A Roll-Back Approach Based on Conceptual Power Plant Studies Farrokh Najmabadi UC San Diego Fusion Power Associates Annual Meeting.
Why on Earth Fusion? Fusion: Energy Source for the Future AAAS Annual Meeting John Clarke & Jae Edmonds 19 February 2005 Joint Global Change Research Institute.
Page 1 of 14 Reflections on the energy mission and goals of a fusion test reactor ARIES Design Brainstorming Workshop April 2005 M. S. Tillack.
Characteristics of Commercial Fusion Power Plants Results from ARIES-AT Study Farrokh Najmabadi Fusion Power Associates Annual Meeting & Symposium July.
Prospect for Attractive Fusion Power (Focus on tokamaks) Farrokh Najmabadi University of California San Diego Mini-Conference on Nuclear Renaissance 48th.
September 6-7, 2007/ARR 1 Power Management Technical Working Group: Status and Documentation A. René Raffray Mark Tillack University of California, San.
Overview of Advanced Design White Paper Farrokh Najmabadi Virtual Laboratory for Technology Meeting June 23, 1998 OFES Headquarters, Germantown.
Summary Report of the Energy Issues Working Group Organizer: Farrokh Najmabadi Covenors:Jeffrey Freidberg, Wayne Meier, Gerald Navaratil, Bill Nevins,
Fusion Development Path: A Roll-Back Approach Based on Conceptual Power Plant Studies Farrokh Najmabadi UC San Diego 9 th International Symposium on Fusion.
Thoughts on Fusion Nuclear Technology Development and the Role of ITER TBM Farrokh Najmabadi Prof. of Electrical Engineering Director of Center for Energy.
ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 1 Groundrules, Bases, and Definitions to Scope “The Next Step” L. Waganer The Boeing Company.
Role of ITER in Fusion Development Farrokh Najmabadi University of California, San Diego, La Jolla, CA FPA Annual Meeting September 27-28, 2006 Washington,
INTERNATIONAL ENERGY AGENCY AGENCE INTERNATIONALE DE L’ENERGIE 1 Dr. Robert K. Dixon Head, Energy Technology Policy Division International Energy Agency.
Challenges of a Harmonized Global Safety Regime Jacques Repussard Director General IRSN IAEA 2007 Scientific Forum.
Power Extraction Research Using a Full Fusion Nuclear Environment G. L. Yoder, Jr. Y. K. M. Peng Oak Ridge National Laboratory Oak Ridge, TN Presentation.
From ITER to Demo -- Technology Towards Fusion Power Farrokh Najmabadi Professor of Electrical & Computer Engineering Director, Center for Energy Research.
1 "Magnetic Fusion: Issues, Metrics, Gaps and a Road Map to Energy " Dale Meade Fusion Innovation Research and Energy® Princeton, NJ ARIES Project Meeting.
© OECD/IEA 2010 Cecilia Tam International Energy Agency Martin Taylor Nuclear Energy Agency The Role of Nuclear Energy in a Sustainable Energy Future Paris,
The Energy Challenge With Thanks to Dr. Steve Koonin, BP for energy charts Farrokh Najmabadi Prof. of Electrical Engineering Director of Center for Energy.
Role of Fusion Energy in the 21st Century
The Fission-Fusion Hybrid At last! A solution that has found a problem Jeff Freidberg MIT.
Opting for “Long Term Operations” Technical, economic and regulatory considerations MARC Conference June 8, 2010 Sean Bushart, EPRI Sr. Program Manager.
Realization of Fusion Energy: How? When? Farrokh Najmabadi Professor of Electrical & Computer Engineering Director, Center for Energy Research UC San Diego.
Fusion: Bringing star power to earth Farrokh Najmabadi Prof. of Electrical Engineering Director of Center for Energy Research UC San Diego NES Grand Challenges.
Overview of the ARIES “Pathways” Program Farrokh Najmabadi UC San Diego US-Japan Workshop on Power Plants Study and Related Advanced Technologies with.
Sustainability at NMSU A part of the integrated planning process.
Page 1 of 11 An approach for the analysis of R&D needs and facilities for fusion energy ARIES “Next Step” Planning Meeting 3 April 2007 M. S. Tillack ?
From ITER to Demo -- Technology Towards Fusion Power Farrokh Najmabadi Professor of Electrical & Computer Engineering Director, Center for Energy Research.
ARIES Project Meeting, L. M. Waganer, Dec 2007 Page 1 Restructuring System Cost Accounts and Algorithms L. Waganer December 2007 ARIES Project.
An Expanded View of RAMI Issues 02 March 2009 RAMI Panel Members: Mohamed Abdou (UCLA), Tom Burgess (ORNL), Lee Cadwallader (INL), Wayne Reiersen (PPPL),
Managed by UT-Battelle for the Department of Energy Stan Milora, ORNL Director Virtual Laboratory for Technology 20 th ANS Topical Meeting on the Technology.
The energy of future. World’s reserves of fuel are going to be exhausted in about 50 years. It’s also predicted that the gas and the coal resources will.
ARIES “Pathways” Program Farrokh Najmabadi University of California San Diego ARIES brainstorming meeting UC San Diego April 3-4, 2007 Electronic copy:
Thoughts on Fusion Competitiveness Initiative Farrokh Najmabadi, George Tynan UC San Diego University Fusion Initiatives Meeting, MIT 14-15, February 2008.
Role of Integrated Assessment Modelling (IAM) in climate change policy analysis The Global Integrated Assessment Model (GIAM) An ABARE-CSIRO joint initiative.
1 1 by Dr. John Parmentola Senior Vice President Energy and Advanced Concepts Presented at the American Security Project Fusion Event June 5, 2012 The.
Page 1 of 11 Progress developing an evaluation methodology for fusion R&D ARIES Project Meeting March 4, 2008 M. S. Tillack.
1 Nuclear Energy Division MIT Report on the Future of Nuclear Power in the United-States : review and discussion Eric Proust Director, Industrial Affairs.
ENERGY FOR THE 21 ST CENTURY the Potential for Nuclear Power Luis Echávarri Director-General, OECD Nuclear Energy Agency IAEA Scientific Forum at the General.
Programmatic issues to be studied in advance for the DEMO planning Date: February 2013 Place:Uji-campus, Kyoto Univ. Shinzaburo MATSUDA Kyoto Univ.
KIT Objectives in Fusion by 2020 Workshop on the European Fusion Roadmap for FP8 and beyond April 13 – 14, 2011; IPP Garching.
Summary and Closing Remarks Farrokh Najmabadi UC San Diego Presentation to ARIES Program Peer Review August 29, 2013, Washington, DC.
AMBITIOUS TARGETS FOR ENERGY RD & D MEETING PLANETARY EMERGENCIES.
PERSISTENT SURVEILLANCE FOR PIPELINE PROTECTION AND THREAT INTERDICTION ARIES Pathways Study Kick-off Meeting Ken Schultz 3 April 2007 Determining the.
Page 1 of 9 Power Management Technical Working Group Structure and Goals ARIES Project Meeting June 2007 M. S. Tillack and A. R. Raffray.
Future Direction of the U.S. Fusion Materials Program Dr. Pete Pappano US Department of Energy Fusion Energy Sciences Fusion Power Associates Annual Meeting.
045-05/rs PERSISTENT SURVEILLANCE FOR PIPELINE PROTECTION AND THREAT INTERDICTION Technical Readiness Level For Control of Plasma Power Flux Distribution.
Assessment of Fusion Development Path: Initial Results of the ARIES “Pathways” Program Farrokh Najmabadi UC San Diego ANS 18 th Topical Meeting on the.
Advanced Design Activities in US Farrokh Najmabadi University of California, San Diego Japan/US Workshop on Fusion Power Plants & Related Technologies.
Comments on Fusion Development Strategy for the US S. Prager Princeton Plasma Physics Laboratory FPA Symposium.
Towards An Attractive Fusion Power Plant Farrokh Najmabadi Forum on Next Step Device April 27, May 1, 1998 U. Wisconsin, Madison, Wisconsin.
Energy Challenge Farrokh Najmabadi Prof. of Electrical Engineering Director of Center for Energy Research UC San Diego UC President Board of Science and.
US Participation in the
Pilot Plant Study Hutch Neilson Princeton Plasma Physics Laboratory ARIES Project Meeting 19 May 2010.
Fusion power: Visions and the Development Path in the ITER Era
Closed Loop Wind Farm Control
Overview of the ARIES “Pathways” Program
Advanced Design Activities in US
Status of the ARIES Program
Review of Project Goals
US/Japan Workshop on Fusion Power Plant Studies
TRL tables: power conversion and lifetime
BP China Management 120.
TWG goals, approach and outputs
Presentation transcript:

Role of Fusion Energy in the 21 st Century Farrokh Najmabadi Prof. of Electrical Engineering Director of Center for Energy Research UC San Diego UCLA May 1, 2007 Farrokh Najmabadi Prof. of Electrical Engineering Director of Center for Energy Research UC San Diego UCLA May 1, 2007 With Thanks to Dr. Steve Koonin, BP, for energy data.

The Energy Challenge Facts and Fiction

 With industrialization of emerging nations, energy use is expected to grow by ~ 4 fold in this century (average 1.6% annual growth rate) US Australia Russia Brazil China India S. Korea Mexico Ireland Greece France UK Japan Malaysia Energy use increases with Economic Development

Energy supply will be dominated by fossil fuels for the foreseeable future ’04 – ’30 Annual Growth Rate (%) Total Source: IEA World Energy Outlook 2006 (Reference Case ), Business as Usual (BAU) case

We are NOT running out of fossil fuels R/P Ratio 41 yrs. R/P Ratio 67 yrs. R/P Ratio 164 yrs. Proven Yet to Find Unconventional Reserves & Resources (bnboe)  The issue is the distribution of fossil fuels, i.e., Energy Security

CO 2 concentration in the atmosphere is rising due to fossil fuel use  The global temperature is increasing  There is a plausible causal connection between CO 2 concentration and global temperature (global warming) But this is a ~1% effect in a complex, noisy system Scientific case is complicated by natural variability, ill-understood non-linear behavior, etc.  The global temperature is increasing  There is a plausible causal connection between CO 2 concentration and global temperature (global warming) But this is a ~1% effect in a complex, noisy system Scientific case is complicated by natural variability, ill-understood non-linear behavior, etc.

CO 2 concentration will grow geometrically!  The earth absorbs anthropogenic CO 2 at a limited rate The lifetime of CO 2 in the atmosphere is ~ 1000 years The atmosphere will accumulate emissions during the 21 st Century  Impact of higher CO 2 concentrations is uncertain ~ 2X pre-industrial is a widely discussed stabilization target (550 ppm) Reached by 2050 under BAU Scenario shown.  To stabilize CO 2 concentration at 550 ppm, emissions would have to drop to about half of their current value by the end of this century This in the face of a five fold increase in energy demand in the next 100 years (1.6% per year emissions growth) Modest emissions reductions only delay the growth of concentration (20% emissions reduction buys 15 years).  The earth absorbs anthropogenic CO 2 at a limited rate The lifetime of CO 2 in the atmosphere is ~ 1000 years The atmosphere will accumulate emissions during the 21 st Century  Impact of higher CO 2 concentrations is uncertain ~ 2X pre-industrial is a widely discussed stabilization target (550 ppm) Reached by 2050 under BAU Scenario shown.  To stabilize CO 2 concentration at 550 ppm, emissions would have to drop to about half of their current value by the end of this century This in the face of a five fold increase in energy demand in the next 100 years (1.6% per year emissions growth) Modest emissions reductions only delay the growth of concentration (20% emissions reduction buys 15 years).  Reducing emissions is an enormous, complex challenge; technology development must play the central role.

Many sources contribute to the emission of greenhouse gases

There is a growing acceptance that nuclear power should play a major role France  Large expansion of nuclear power, however, requires rethinking of fuel cycle and waste disposal, e.g., Reprocessing, deep burn of actinides, Gen IV reactors.

Need a few good engineers!  Energy debate is dominated by activists and lobbyists. Left: “Energy challenge can be readily met by conservation and renewables alone.” Right: “Limiting greenhouse emissions are so costly that it will wreck the economy.” or “Uncertainty in the CO 2 impact justifies inaction.”  Scientists and engineers are NOT involved in the debate Most proposals by activist and hyped by popular media either violate physical laws, or are beyond current technology, or would not make any sizeable impact.  No carbon-neutral commercial energy technology is available today. Solution CANNOT be legislated. Subsidies do not work! Energy market is huge (T$ annual sale, TW of power).  Energy debate is dominated by activists and lobbyists. Left: “Energy challenge can be readily met by conservation and renewables alone.” Right: “Limiting greenhouse emissions are so costly that it will wreck the economy.” or “Uncertainty in the CO 2 impact justifies inaction.”  Scientists and engineers are NOT involved in the debate Most proposals by activist and hyped by popular media either violate physical laws, or are beyond current technology, or would not make any sizeable impact.  No carbon-neutral commercial energy technology is available today. Solution CANNOT be legislated. Subsidies do not work! Energy market is huge (T$ annual sale, TW of power). Get Involved and Educate!

We Should Be Ready to Accelerate Fusion Development!  With the industrialization of the emerging nations, the demand for energy will increase by many folds.  Few options available: Energy EfficiencyOnly has reduced the growth rate Fossil fuelsCO 2 and Climate Change RenewableIntermittency, high cost, environmental impact Nuclear (fission)Waste disposal, proliferation  There would be a large increase in energy R&D in the next 5-10 years.  With the industrialization of the emerging nations, the demand for energy will increase by many folds.  Few options available: Energy EfficiencyOnly has reduced the growth rate Fossil fuelsCO 2 and Climate Change RenewableIntermittency, high cost, environmental impact Nuclear (fission)Waste disposal, proliferation  There would be a large increase in energy R&D in the next 5-10 years.  We need to be prepared to put fusion option on the table.

Fusion Option: How to get from ITER to an attractive final product?

ITER Integration of fusion plasma with fusion technologies A 1 st of the kind Power Plant! “Fusion Power: Research and Development Requirements.” Division of Controlled Thermonuclear Research (AEC).

Configuration Optimization Concept Exploration/Proof of Principle Theory, Simulation and Basic Plasma Science MFE PE(s) MFE ITER (or FIRE) Burning Plasma Materials Testing Materials Science/Development MFE IFMIF Engineering Science/ Technology Development Component Testing MFE CTF US Demo Demonstration Complete ITER Ops Phase 1 Complete IFMIF Ops 80 dpaPrelim. IFMIF Ops 150 dpa Internal Components Design Advanced driver & Target R&D; Blankets; Divertors; Tritium Systems; Remote handling Advanced Tokamaks Spherical Torus Compact Stellarator Reverse-field Pinches Design Studies MFE Program Integration of fusion plasma with fusion technologies?

We need to develop a 5,000 ft view of fusion development

What do we need to bridge the gap between ITER and attractive power plants?  Do we have a detailed map for fusion power development?  How do we optimize such a development path? Metrics will be needed for cost/benefit/risk tradeoffs What can we do in simulation facilities and what requires new fusion devices?  How can we utilize existing devices to resolve some of these issues? Preparation for lunching new facilities. Resolving issues that can make a difference in any new facilities.  Do we have a detailed map for fusion power development?  How do we optimize such a development path? Metrics will be needed for cost/benefit/risk tradeoffs What can we do in simulation facilities and what requires new fusion devices?  How can we utilize existing devices to resolve some of these issues? Preparation for lunching new facilities. Resolving issues that can make a difference in any new facilities.  Serious money requires a plan with an attractive product with a reasonable time frame and clear milestones! We need to overcome the perception that fusion is always 30 years away and it is NOT really an energy program. Judge is the energy industry not other scientists!  Serious money requires a plan with an attractive product with a reasonable time frame and clear milestones! We need to overcome the perception that fusion is always 30 years away and it is NOT really an energy program. Judge is the energy industry not other scientists!

A holistic/integrated optimization approach should drive the development path. Traditional Approach: Ask each scientific area (e.g., plasma, blanket)  What are the remaining major R&D areas?  Which of the remaining major R&D areas can be explored in existing devices or simulation facilities (e.g., fission reactors)? What other major facilities are needed? Traditional Approach: Ask each scientific area (e.g., plasma, blanket)  What are the remaining major R&D areas?  Which of the remaining major R&D areas can be explored in existing devices or simulation facilities (e.g., fission reactors)? What other major facilities are needed? Holistic/Integrated Approach: Fusion energy development should be guided by the requirements for an attractive fusion energy source  What are the remaining major R&D areas? What it the impact of this R&D on the attractiveness of the final product.  Which of the remaining major R&D areas can be explored in existing devices or simulation facilities (i.e., fission reactors)? What other major facilities are needed? Should we attempt to replicate power plant conditions in a scaled device or Optimize facility performance relative to scaled objectives Holistic/Integrated Approach: Fusion energy development should be guided by the requirements for an attractive fusion energy source  What are the remaining major R&D areas? What it the impact of this R&D on the attractiveness of the final product.  Which of the remaining major R&D areas can be explored in existing devices or simulation facilities (i.e., fission reactors)? What other major facilities are needed? Should we attempt to replicate power plant conditions in a scaled device or Optimize facility performance relative to scaled objectives

Elements of the case for fusion power were developed through interaction with representatives of U.S. Electric utilities and energy industry  Have an economically competitive life-cycle cost of electricity  Gain Public acceptance by having excellent safety and environmental characteristics No disturbance of public’s day-to-day activities No local or global atmospheric impact No need for evacuation plan No high-level waste Ease of licensing  Reliable, available, and stable as an electrical power source Have operational reliability and high availability Closed, on-site fuel cycle High fuel availability Capable of partial load operation Available in a range of unit sizes Fusion physics & technology Low-activation material

Existing facilities fail to address essential features of a fusion energy source

ITER is a major step forward but there is a long road ahead. Present Experiments

A holistic/integrated optimization approach should drive the development path. Traditional Approach: Ask each scientific area (e.g., plasma, blanket)  What are the remaining major R&D areas?  Which of the remaining major R&D areas can be explored in existing devices or simulation facilities (e.g., fission reactors)? What other major facilities are needed? Traditional Approach: Ask each scientific area (e.g., plasma, blanket)  What are the remaining major R&D areas?  Which of the remaining major R&D areas can be explored in existing devices or simulation facilities (e.g., fission reactors)? What other major facilities are needed? Holistic/Integrated Approach: Fusion energy development should be guided by the requirements for an attractive fusion energy source  What are the remaining major R&D areas? What it the impact of this R&D on the attractiveness of the final product.  Which of the remaining major R&D areas can be explored in existing devices or simulation facilities (i.e., fission reactors)? What other major facilities are needed? Should we attempt to replicate power plant conditions in a scaled device or Optimize facility performance relative to scaled objectives Holistic/Integrated Approach: Fusion energy development should be guided by the requirements for an attractive fusion energy source  What are the remaining major R&D areas? What it the impact of this R&D on the attractiveness of the final product.  Which of the remaining major R&D areas can be explored in existing devices or simulation facilities (i.e., fission reactors)? What other major facilities are needed? Should we attempt to replicate power plant conditions in a scaled device or Optimize facility performance relative to scaled objectives

ARIES studies emphasize holistic R&D needs and their design implications Plasma Blankets Divertors Magnets Vacuum vessel Traditional approach Power control Power and particle management Fuel management Maintenance Safety Waste Cost Concurrent engineering/physics

Examples of holistic issues for Fusion Power  Power management: Demonstrate extraction of power core high- grade heat, divertor power handling, nuclear performance of ancillary equipment.  Fuel management: Demonstrate “birth to death” tritium management in a closed loop with self-sufficient breeding and full accountability of tritium inventory.  Safety: Demonstrate public and worker safety of the integral facility, capturing system to system interactions.  Plant operations: Establish the operability of a fusion energy facility, including plasma control, reliability of components, inspectability and maintainability of a power plant relevant tokamak.  Power management: Demonstrate extraction of power core high- grade heat, divertor power handling, nuclear performance of ancillary equipment.  Fuel management: Demonstrate “birth to death” tritium management in a closed loop with self-sufficient breeding and full accountability of tritium inventory.  Safety: Demonstrate public and worker safety of the integral facility, capturing system to system interactions.  Plant operations: Establish the operability of a fusion energy facility, including plasma control, reliability of components, inspectability and maintainability of a power plant relevant tokamak.

Divertor First wall P rad P cond In-vessel PFC’s PP P injected P fusion core power rf antennas, magnets, diagnostics, etc. edge power P rad P cond P neutron Blanket Flow Diagram of Power Management

The integrated approach leads to important choices in R&D.  Interaction between components and disciplines often dictate the optimized solution. For example, Improved plasma performance (e.g., increased power density) should be balanced against constraints such as divertor power handling. First wall, divertor, and in-vessel components should not imped a high- performance plasma operation (e.g., material choices) R&D requires integrated testing of power technologies in the presence of a fusion plasma with prototypical edge plasma conditions. Does not allow problem to be solved by transferring to another system: A 100% radiating plasma transfers the problem from divertor to the first wall. Allows Prioritization of R&D. For example, is it better to develop a high b plasma or a high efficiency blanket? Most technologies for current experiments & ITER are NOT transferable to a power plant. Is this an optimum approach?  Interaction between components and disciplines often dictate the optimized solution. For example, Improved plasma performance (e.g., increased power density) should be balanced against constraints such as divertor power handling. First wall, divertor, and in-vessel components should not imped a high- performance plasma operation (e.g., material choices) R&D requires integrated testing of power technologies in the presence of a fusion plasma with prototypical edge plasma conditions. Does not allow problem to be solved by transferring to another system: A 100% radiating plasma transfers the problem from divertor to the first wall. Allows Prioritization of R&D. For example, is it better to develop a high b plasma or a high efficiency blanket? Most technologies for current experiments & ITER are NOT transferable to a power plant. Is this an optimum approach?

Integration of a fusion plasma and fusion technologies is essential  Fusion roadmap and R&D prioritization should be driven by integrated response of the system.  Fusion development requires an experimental device to perform integrated testing of a fusion plasma and fusion technologies in order to provide the data base necessary to convince utilities to proceed with the Demo and for the licensing authorities to license that device. This is the primary mission of CTF  Fusion roadmap and R&D prioritization should be driven by integrated response of the system.  Fusion development requires an experimental device to perform integrated testing of a fusion plasma and fusion technologies in order to provide the data base necessary to convince utilities to proceed with the Demo and for the licensing authorities to license that device. This is the primary mission of CTF

Further Thoughts

We should focus on an aggressive plan for accelerated fusion development  We will not be able to compete with Asian Superconducting tokamaks and ITER in a timely manner.  However, we can leap-frog the rest of the world by focusing on the pace-setting issues – Plasma and fusion technologies. This can be done in parallel with ITER!  We can aim at a Fusion Pilot Plant: A steady-state demonstration device with the capability to produce copious amount (> 100 MW) of fusion power and provide an integrated test bed for all aspect of a fusion power plant. This device does NOT have to be a net energy producer! (Q =1-2 is enough!) It would resolve the remaining issues of fusion plasma physics. It would set the necessary technical/regulatory data base for moving towards a fusion power plant.  We will not be able to compete with Asian Superconducting tokamaks and ITER in a timely manner.  However, we can leap-frog the rest of the world by focusing on the pace-setting issues – Plasma and fusion technologies. This can be done in parallel with ITER!  We can aim at a Fusion Pilot Plant: A steady-state demonstration device with the capability to produce copious amount (> 100 MW) of fusion power and provide an integrated test bed for all aspect of a fusion power plant. This device does NOT have to be a net energy producer! (Q =1-2 is enough!) It would resolve the remaining issues of fusion plasma physics. It would set the necessary technical/regulatory data base for moving towards a fusion power plant.

Are we ready to accelerate fusion development?  We probably have the plasma basis to proceed with such a device (a physics basis is needed).  We do NOT have the Engineering Sciences basis to move forward.  We do NOT have the people! (Very few students in fusion technology area, very few universities involved.)  Proposal: A Concept Exploration Program for Fusion Engineering Sciences: Small Grants, involve as many universities as possible. Clear goals and milestones, reward performers and drop non- performers. This will allow a new generation of fusion scientists to come forward to take the leadership of this area.  We probably have the plasma basis to proceed with such a device (a physics basis is needed).  We do NOT have the Engineering Sciences basis to move forward.  We do NOT have the people! (Very few students in fusion technology area, very few universities involved.)  Proposal: A Concept Exploration Program for Fusion Engineering Sciences: Small Grants, involve as many universities as possible. Clear goals and milestones, reward performers and drop non- performers. This will allow a new generation of fusion scientists to come forward to take the leadership of this area.

In Summary, …

A CO 2 constrained world provides a major opportunity for fusion develoment  Serious money requires a plan with an attractive product with a reasonable time frame and clear milestones! We need to overcome the perception that fusion is always 30 years away and it is NOT really an energy program. Judge is the energy industry not other scientists!  A detailed development plan for fusion is needed which provides all of data base necessary to proceed with the Demo.  An integrated approach would result in an optimized R&D program  An aggressive fusion development is possible. We can leap-frog the rest of the world by focusing on the pace-setting issues – integration of a fusion plasma with fusion technologies. This can be done in parallel with ITER!  We need to initiate a “ concept development ” -type program aiming at increasing involvement of universities in fusion technologies.  Serious money requires a plan with an attractive product with a reasonable time frame and clear milestones! We need to overcome the perception that fusion is always 30 years away and it is NOT really an energy program. Judge is the energy industry not other scientists!  A detailed development plan for fusion is needed which provides all of data base necessary to proceed with the Demo.  An integrated approach would result in an optimized R&D program  An aggressive fusion development is possible. We can leap-frog the rest of the world by focusing on the pace-setting issues – integration of a fusion plasma with fusion technologies. This can be done in parallel with ITER!  We need to initiate a “ concept development ” -type program aiming at increasing involvement of universities in fusion technologies.

Thank you! Any Questions?

Development of fusion has been constrained by funding! $M, FY FED ITER Demo Current cumulative funding ~ 1 week of world energy sale