Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
RFCC Module Update Derun Li Center for Beam Physics LBNL, Berkeley, CA MICO Weekly Phone Meeting March 21, 2011.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
Spectrometer Solenoids MICO 146 Steve Virostek LBNL June 6, 2011.
UPDATE of RFCC MOUDLE Derun Li, Steve Gourlay Lawrence Berkeley National Laboratory MICE MICO Meeting December 21, 2011.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
-1- Wang, Li The 23rd MICE Collaboration Meeting to 17 HIT/CHINA WANG, Li Institute of Cryogenics and Superconductivity Technology.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
Cooling Channel Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
Spectrometer Solenoid Testing Update S. Virostek and M. Zisman Lawrence Berkeley National Laboratory MICO Meeting—RAL May 17, 2010.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update S. Virostek and M. Green are visiting vendor today for progress update Vendor expects to complete.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #145 December 15, 2011.
Spectrometer Solenoid Lead Testing Update S. Virostek and Mike Zisman Lawrence Berkeley National Lab MICO Meeting January 19, 2010.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
MICE Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #26 University of California.
MICE Magnets - Virostek 11 MICE Magnets Steve Virostek Engineering Division Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
Spectrometer Solenoid Fabrication & Testing Update S. Virostek and Mike Zisman Lawrence Berkeley National Lab NFMCC 2010 Collaboration Meeting University.
MICE Coupling Coil Update Steve Virostek for Allan DeMello Lawrence Berkeley National Laboratory MICO January 23, 2013 January 23, 2013.
Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Abstract: The Muon Ionization Cooling Experiment (MICE) is an international effort sited at Rutherford Appleton Laboratory, which will demonstrate ionization.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
MICE Cooling Channel Magnets: Spectrometer Solenoid Procurement RF Module Coupling Coil Proposal Steve Virostek Lawrence Berkeley National Lab NFMCC 07.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
MICE Funding Update (U.S.) Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory CMPB Meeting August 1, 2007.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
MICE Spectrometer Solenoid Review A summary of P.Fabbricatore on behalf the review board Amalia Ballarino, Elwyn Baynham, Tom Bradshaw, Mike Courthold,
Spectrometer Solenoid Background Info Steve Virostek Lawrence Berkeley National Lab MICE Spectrometer Solenoid Review: Phone Meeting October 5, 2009.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
Progress on MICE RFCC Module for the MICE Experiment * Allan DeMello, Nord Andresen, Michael Green, Derun Li, Heng Pan, Steve Virostek, Michael Zisman.
Status of MICE Coupling Coil Magnets D. Li and M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory February 16, 2011 MICE CM29-Rutherford.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
1 MICE Coupling Coil Cryostating and Test Steve Gourlay March 1, Office of Science.
Spectrometer Solenoid Documents and Review Plans Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National.
Spectrometer Solenoid Fabrication Status and Schedule
MICE Coupling Coil Update
Presentation transcript:

Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO Meeting—RAL December 21, 2009

MICO90:Zisman2 Spectrometer Solenoid Status Vendor working on both magnets in parallel —magnet 2 being modified to accommodate additional 1-stage cooler —magnet 1 was modified to accommodate 4 th 2-stage cooler o with room for a single-stage cooler as well, if needed —based on review, some optimism that 4 th 2-stage cooler will not be needed First single-stage cooler at vendor now —order of another one for magnet 1 is under way Lead tests have been prepared but not yet run —small intermittent leaks have been hard to find o new person at vendor assigned to follow up on this Discharge circuit has been fabricated and partially tested —final testing will be done as part of “training” procedure

December 21, 2009MICO90:Zisman3 Magnet 2 Single Stage Cooler Magnet 2 cooler —should handle heat load from HTS leads

December 21, 2009MICO90:Zisman4 Single-Stage Cooler in Place Initial installation has been done —final connections not completed

December 21, 2009MICO90:Zisman5 Single-Stage Cooler Details Internal thermal connection will employ Cu strips, soft soldered and bolted to Cu plate —external bellows utilized for vacuum connection

December 21, 2009MICO90:Zisman6 Cryocooler Connections Cryocooler 2 and 3 connections on magnet 2 —connections from cooler to copper plates getting more instrumentation o connection from copper plate to shield unchanged from previous test –thermal connection is (at best) problematical

December 21, 2009MICO90:Zisman7 Discharge Circuit Fabrication completed for magnet 2 —awaits testing during “training” exercise (January)

December 21, 2009MICO90:Zisman8 Magnet 1 Modifications Changes to permit 4 th 2-stage cryocooler basically complete —based on review, will purchase additional single-stage cooler for this magnet also o at present, this looks like solution of choice –if magnet 2 works well, magnet 1 will surely work even better  shield connections on magnet 1 being greatly improved —hope is to have magnet 1 ready soon after magnet 2 is retested o should minimize schedule delay even if magnet 2 changes do not solve all problems –high likelihood of being able to train magnet 2 to full current –no guarantee that magnet 2 will operate without needing “top-up” of cryogens  carrying out thermal calculations now to examine this, but real proof awaits testing  proposed goal is >6 weeks between top-ups

December 21, 2009MICO90:Zisman9 Magnet 1 Shield Shield will have copper connections from cooler Stage 1 —shield will also be “beefed up” locally to improve heat transfer to edges o this is where cold-mass support intermediate temperature point is connected Improved heat transport to cold-mass supports thermal intercept Improved thermal connection from cooler Stage 1

December 21, 2009MICO90:Zisman10 Schedule Magnet 2 was supposed to be buttoned up by now —late due to illness at vendor o cooler partially installed o build-up of turret under way —expect to be ready to pump after Christmas o leak check probably early in January 2010 —likely mid-January before tests begin o will try to arrive at decision point in January –but early February is more likely o initial cool-down apparatus from Fermilab will be ready when needed –should ship this week

December 21, 2009MICO90:Zisman11 Spectrometer Solenoid Plans Continue with magnet 2 training to reach 270 A or beyond —quantify thermal margin using cold-mass heater Continue work on magnet 1 —about 2 months behind magnet 2 at present —would like results from magnet 2 test before deciding what to do about 4 th two-stage cooler o even if it means delaying magnet 1 progress a bit Evaluate power supplies to test proposed circuit modifications —this is “external” and thus less pressing —expect to do this with magnet 2

December 21, 2009MICO90:Zisman12 RFCC Module (1) All five cavities have been delivered to LBNL —not yet “ready to go” o need processing (electropolish) at LBNL —vendor already pressing for “option” order of five more cavities o this would be a Step 6 commitment Visited HIT two weeks ago to update plans for coupling coils —magnet production contract not yet placed with vendor o hold-up has been lack of complete set of fabrication drawings –resolved remaining issues for cold-mass drawings at meeting  last remaining step needed to place contract —some organizational changes o local HIT Project Manager will be Feng-yu Xu o Chief Engineer will be Li Wang (makes all technical decisions) o Prof. Chen (IHEP) will be liaison with Qi Huan Company

December 21, 2009MICO90:Zisman13 RFCC Module (2) Goal to have contract for cold mass fabrication in place by ~March 2010 —considered a “make or break” milestone! o hard to see MuCool CC delivered before next summer o web site for bid process has been set up In parallel, pressing to make HIT test facility operational —cryogenics issue —plan is to o get system modified o complete test of large coil (validates system) o use facility to test and train the three cold masses built by Qi Huan —dates for these still to be negotiated Generating revised Addendum to MOU to formalize plan —magnet cryostats may become U.S. responsibility o depends on results of bid process

December 21, 2009MICO90:Zisman14 Summary Seeing some light at the end of the tunnel —too early yet to tell whether it’s simply an oncoming train o encouraging signs at this point –should be clearer picture at Riverside meeting in March