MERIT review, Dec. 2005CERN AB-ATB1 CERN Installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.

Slides:



Advertisements
Similar presentations
MERIT Pump/Probe Data Analysis Outline  The pump/probe program  Particle detector response correction  Pump/probe analysis results NFMCC Collaboration.
Advertisements

Test Beams Around the World (well, a very small world…) CERN (transparencies from Horst Breuker from CERN AIDA meeting) DESY (transparencies from Norbert.
Harold G. Kirk Brookhaven National Laboratory The CERN Target Experiment Schedule and Budget MERIT Review BNL December 12, 2005.
Harold G. Kirk Brookhaven National Laboratory Targetry Plans and Status MUTAC Review FNAL March 17, 2006.
MERIT Review Meeting: Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug CERN Cryogenics for Experiments Accelerator Technology Department Presented by Adrian.
Harold G. Kirk Brookhaven National Laboratory MERIT Experiment Status NFMCC Collaboration Meeting FNAL March 17-20, 2008.
MERcury Intense Target (MERIT) Experiment – or nTOF-11 Pre-installation Safety Review Ilias Efthymiopoulos Adrian Fabich (CERN - AB-ATB-EA) Pre-installation.
VRVS, Jan. 2006CERN AB-ATB1 Safety Review Solenoid & Cryogenics CERN AB-ATB VRVS session, Jan
VRVS, Jan. 2006CERN AB-ATB1 MERIT layout in TT2/TT2A/TT10 CERN AB-ATB VRVS session, Jan
Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.
Harold G. Kirk Brookhaven National Laboratory The MERIT High-Power Target Experiment Muon Collider Design Workshop BNL December 3-7, 2007.
Collaboration meeting, Ocotober 2005A.Fabich, CERN AB-ATBResponse from the APC, 1 MERIT beam request A.Fabich CERN AB-ATB
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
NFMCC Meeting - 13 March 2006 I.Efthymiopoulos, A.Fabich, CERN AB-ATB-EA1 MERcury Intense Target (MERIT) Experiment Installation Issues I. Efthymiopoulos.
2.April 2004A.Fabich, H.Kirk Summary for proposal of TT2A target test H.Kirk, A.Fabich March 2004 week 9 morning: Cryogenics,
March 2006I.Efthymiopoulos, CERN1 MERcury Intense Target Experiment Installation Issues I. Efthymiopoulos – CERN, AB Dept. Thanks to: A.Fabich, H.Haseroth,
MERcury Intense Target (MERIT) Experiment – or nTOF-11 Mercury System Safety Review Ilias Efthymiopoulos Adrian Fabich (CERN - AB-ATB-EA) Hg-system Safety.
The MERIT High-Power Target Experiment H. Kirk (BNL) CERN November 1, 2007.
MERIT Experiment Status MERcury Intense Target K. McDonald for the MERIT Collaboration August 30, 2007 TT2/TT2A: MERIT Build.272: Offices & Control Room.
MERIT pre-installation review: Preliminary conclusions A.Fabich.
Timing Issue for Mercury Target Hee Jin Park (SUNY Stonybrook, BNL) Ilias Efthymiopoulos (CERN) Adrian Fabich (CERN)
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
16.Feb.2005MC meeting, LBNL1 CERN infrastructure A.Fabich, CERN AB-ATB All information available at
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
Update on Cryotarget System Jian-ping Chen GMn Collaboration Meeting, Feb. 24, 2014  Overview  Maintenance/Modifications During Down  Installation Status.
16th March 2005, ENG target A.Fabich, CERN AB/ATB 1 Status of the TT2A target experiment Status of the TT2A target experiment A.Fabich CERN AB/ATB ENG/BENE.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
1.Sep.2004A.Fabich, CERN AB/ATBORNL target workshop Workshop on high power targets at ORNL A.Fabich CERN AB/ATB 1. August 2004 message from the research.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Installation issues - update, July 2006A.Fabich1 MERIT installation: Update July 2006 A.Fabich CERN AB-ATB July 2006.
MERIT Hg System Final Design Review Hg Target System Controls V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science &
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
A. Fabich, CERN MERIT collaboration meeting, CERN, 7-8 February 2008 MERIT beam intensities, Feb 08A. Fabich, CERN1.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
The Stripping Foil Test Stand in the Linac4 Transfer Line
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
July 2005A.Fabich, CERN AB-ATB1 MERIT (ntof11) experiment: Diagnostics A.Fabich CERN AB-ATB July 2005.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
30th March 2007A.Fabich, CERN AB-ATB1 MERIT - Status of the Experiment A. Fabich CERN AB-ATB MERIT safety review (3)
Power controls, Sept. 2006A.Fabich1 MERIT installation: Controls for the 5MW power-supply A.Fabich CERN AB-ATB September 2006.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
HiRadMat status report Adrian Fabich HiRadMat EAM, 4. March 2016 EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th.
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
March 2006I.Efthymiopoulos, CERN1 MERcury Intense Target Experiment Installation Issues I. Efthymiopoulos Thanks to: A.Fabich, H.Haseroth, F.Haug, J.Lettry,
The Next Generation of a Gamma Irradiation Facility GIF++
Status of HESR 18th March Gießen Dieter Prasuhn.
MERcury Intense Experiment Experiment Layout
G0 Detector Working Group Meeting
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Target and Horn status report
The Proposed TT2A Target Experiment
MERIT beam intensities
Status on the PS/SPS  MERIT (nTOF11) interface
The Proposed TT2A Target Experiment
MERIT pre-installation review: Preliminary conclusions
Hee Jin Park (SUNY Stonybrook, BNL) Ilias Efthymiopoulos (CERN)
MERIT beam request A.Fabich CERN AB-ATB
Advanced Research Electron Accelerator Laboratory
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
MERIT – status and schedule
East Hall under construction
Presentation transcript:

MERIT review, Dec. 2005CERN AB-ATB1 CERN Installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec

MERIT review, Dec CERN AB-ATB CERN installation, 2 Contents Layout TT2A and periphery Beam line Control room Proton beam Installation Proton synchrotron beam Safety Cryogenics, fire, access, radiation, chemicals interlocks Schedule Budget

MERIT review, Dec CERN AB-ATB CERN installation, 3 Layout - beam elements Q-triplet for focusing to target (separate power ) Approx. position Hg loop Solenoid / target V-dipole Attenuator MTV screens XCLD collimator

MERIT review, Dec CERN AB-ATB CERN installation, 4 Layout MERIT experiment MERIT physical integration TT2A/TT2 Draftsman started on ACAD drawing week 49 Ready by January 2006 Transport & installation solenoid base plate and transport vehicle: “kinematics” cryogenics/power to solenoid Control room: ISR or elsewhere (?) Are cables installations required between TT2 & CR? Can all communication be based on Ethernet network? List of communication connections Required for definition of place and distance to TT2A to be defined by March 2006

MERIT review, Dec CERN AB-ATB CERN installation, 5 Pulse list program Based on pulse list July hiptarget/default/Documents/subsystems/ProtonBeam/pulselist.xls hiptarget/default/Documents/subsystems/ProtonBeam/pulselist.xls Total dose limited to 3*10 15 protons on target. Nominal momentum 24 GeV/c Corrected intensity/bunch Previously guaranteed: Intensity/bunch  4*10 12 protons (h=8) Total maximum  32*10 12 protons (h=8) Updated: Intensity/bunch 2-2.5*10 12 protons (h=16) total maximum > 32*10 12 protons/pulse (h16) h16 provides potential for increased intensity Baseline: harmonic 16 Pulse length up to 20 ms possible (beyond 2  s: p=14 GeV/c) Updated pulse list by beginning Jan 2006 Define priority list Needs to be approved by collaboration by end Jan Request MD time in 2006; set-up time in 2007

MERIT review, Dec CERN AB-ATB CERN installation, 6 splitting h8  h16 creates bunch pairs Bunch pairs located in bucket n and n+1 dn experiment = 0,2,4,6,8, 16,18,20,22,24, 32,40, 48,56,... Inhomogeneous intensity distribution causes intensity limits  MD required Pump-probe method PUMP: 6 bunches = 15*10 12 protons PROBE: 2 bunches = 5*10 12 protons Possible Chosen dn n=1

MERIT review, Dec CERN AB-ATB CERN installation, 7 Proposition for Priorities General approach Repeat each parameter configuration twice Increase intensity to moderate 1.5*10 13 protons/pulse Do basic program, MHD first Each proton pulse configuration is performed at B=15 T (solenoid) and B=0 T (horn) Consider effort for PS operation to change settings 0. beam setup 1. MHD 2. beam position 3. Pulse structure a) Cavitation b) 50 Hz operation 4. Spot size 5. Intensity Pulse should include operation scenarios.

MERIT review, Dec CERN AB-ATB CERN installation, 8 Beam profile measurement 3 Monitor types considered Based on beam properties to be measured MTV screens “almost” readily available Minor effort Minimum budget SEM-grid None available - needs new construction Costly: >50 kChF Manpower these days very little at CERN Wire scanner “Slow” measurement Baseline: MTV screens Transverse beam parameters Position & spot size  MTV screens Direction  2  MTV screens & collimator Divergence  not a direct measurement Rely on beam simulations Estimate from spot size monitors Longitudinal beam parameters Measured by pick-ups in the PS & TT2 line upstream of MERIT Log values and make available the information for the MERIT collaboration Parameters measured: Bunch length Bunch spacing Pulse length Intensity

MERIT review, Dec CERN AB-ATB CERN installation, 9 Safety Partly settled, partly in negotiation with CERN safety commission ODH Generally followed up by AT-ECR Monitors to be installed TT2/A (AT-ECR) TT10 (ATB-EA) Fire Followed up by ATB-EA Identification of fire risk Monitors to be installed in TT2/A Mechanics Followed up by ATB-EA Pressure vessel Radiation Followed up by ATB-EA Activation of mercury -> ISO2191 Transport of activated material Chemicals Mercury handling Interlock, access Followed up by ATB-EA Implementation by TS-CSE power magnet cryogenics access Beam/radiation

MERIT review, Dec CERN AB-ATB CERN installation, 10 Schedule at CERN Target date: November 2006! Infrastructure to be finished before arrival of solenoid/mercury loop Followed by installation and commissioning including all systems Consider restrictions by Installation delay (manpower, tendering, ordering,...) Access limitations (2006 beam run)

MERIT review, Dec CERN AB-ATB CERN installation, 11 Power installation - schedule To be inserted

MERIT review, Dec CERN AB-ATB CERN installation, 12 ATB schedule To be inserted

MERIT review, Dec CERN AB-ATB CERN installation, 13 Budget breakdown 2005 MERIT budget code at CERN + 49 kChF -31 kChF spent to date Balance 9.Dec. 05: 18 kChF Summary NatureEstimate [kChF] Expended [kChF] Travel10 (2005)7 Power supply 110 (all)10.6 Designer-3.8 Cables95 (all)10.2

MERIT review, Dec CERN AB-ATB CERN installation, 14 Budget estimate 2006 (CERN) To come soon (within weeks) Water cooling PS: 5 kChF DC cable installation 20 kChF including material and manpower AC cable installation 10 kChF Total estimate 2006 (draft) power: 100 kChF until spring 2006 cables: 95 kChF until Feb cryogenics: 360 kChF until Nov Beam diagnostics:15 kChF Particle detectors:40 kChF AB-ATB: 50 kChF(draftsman, transport, safety,...) Travel 5 x 3000 ChF = 15 kChF

MERIT review, Dec CERN AB-ATB CERN installation, 15 EDMS Electronic Document Management System /AB / All official documents at CERN are passed here “version” handling integrated Approval processes integrated Will be used by CERN collaboration members. Can be used worldwide. Can also be used for a parameter list document.

MERIT review, Dec CERN AB-ATB CERN installation, 16 Conclusions MERIT integration (planning) on track. Installation of power/cables on track. Safety issues carefully considered. Critical items Cryogenics must proceed to schedule Start tender soon