T2K Target & Secondary Beamline - progress towards a neutrino Superbeam? Chris Densham.

Slides:



Advertisements
Similar presentations
WP2: Targets Proposed Outline Work Programme Chris Densham.
Advertisements

Matt Rooney RAL The T2K Beam Window Matt Rooney Rutherford Appleton Laboratory BENE November 2006.
The Current T2K Beam Window Design and Upgrade Potential Oxford-Princeton Targetry Workshop Princeton, Nov 2008 Matt Rooney.
Ottone Caretta & Chris Densham Technology Business Unit Rutherford Appleton Laboratory A new idea for NuFact targets and beam dumps BENE Nov 06 – Frascati,
Mike Fitton Engineering Analysis Group Design and Computational Fluid Dynamic analysis of the T2K Target Neutrino Beams and Instrumentation 6th September.
Chris Densham RAL High Power Targets Group To be a ‘one-stop shop’ (P. Hurh) for target technology Enable optimum physics performance via sound engineering.
K. McDonald 2 nd Oxford-Princeton Targetry Workshop 6 Nov 2008 High-Power Targets for Superbeams and Neutrino Factories (and Muon Colliders) K.T. McDonald.
Status of T2K Target 2 nd Oxford-Princeton High-Power Target Workshop 6-7 th November 2008 Mike Fitton RAL.
Above: Energy deposition in the superconducting magnet and the tungsten-carbide shield inside them. Approximately 2.4 MW must be dissipated in the shield.
K. McDonald EURO Meeting 26 Mar 2009 High-PowerTargets for Neutrino Beams and Muon Colliders K.T. McDonald Princeton U. EURO Meeting CERN, March 26, 2009.
30 June 2008M. Dracos, NuFact081 Challenges and Progress on the SuperBeam Horn Design Marcos DRACOS IN2P3/CNRS Strasbourg NuFact 08 Valencia-Spain, June.
The JPARC Neutrino Target
The MERIT experiment at the CERN PS Leo Jenner MOPC087 WEPP169 WEPP170.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
Solid Target Options NuFACT’00 S. Childress Solid Target Options The choice of a primary beam target for the neutrino factory, with beam power of
Packed Bed Target for Euronu DAVENNE, Tristan (RAL) ; LOVERIDGE, Peter (RAL) ; CARETTA, Ottone (RAL) ; DENSHAM, Chris (RAL) ; ZITO, Marco (CEA Saclay)
Harold G. Kirk Brookhaven National Laboratory A MW Class Target System for Muon Beam Production AAC 2014 San Jose, Ca July 14-18, 2014.
JHF2K neutrino beam line A. K. Ichikawa KEK 2002/7/2 Overview Primary Proton beamline Target Decay Volume Strategy to change peak energy.
Vacuum windows at JPARC Contents Introduction Vacuum windows at hadron beam line Helium gas cooling Vacuum windows at neutrino beam line primitive discussion.
A powder jet target for a Neutrino Factory Ottone Caretta, Chris Densham (RAL), Tom Davies (Exeter University), Richard Woods (Gericke Ltd)
Proton Accelerators for Science and Innovation Workshop at Fermilab
J-PARC upgrade T. Nakadaira (KEK / J-PARC). Outline J-PARC overview & on-going program Motivation of future experiment in J-PARC Overview of future experiment.
KT McDonald MAP Spring Meeting May 30, Target System Concept for a Muon Collider/Neutrino Factory K.T. McDonald Princeton University (May 28, 2014)
Next generation of ν beams Challenges Ahead I. Efthymiopoulos - CERN LAGUNA Workshp Aussois, France, September 8,2010 what it takes to design and construct.
Horn design for the CERN to Fréjus neutrino Super Beam Nikolas Vassilopoulos IPHC/CNRS.
Thermomechanical characterization of candidate materials for solid high power targets Goran Skoro, R. Bennett, R. Edgecock 6 November 2012 UKNF Target.
T2K Secondary Beamline – Status of RAL Contributions Chris Densham, Mike Fitton, Vishal Francis, Matt Rooney, Mike Woodward, Martin Baldwin, Dave Wark.
Summary Why consider a packed bed as a high power target?
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
Future upgrade of the neutrino beam-line for multi-MW beam 5 th Hyper-Kamiokande open Vancouver July Yuichi Oyama (KEK) (for T2K neutrino.
KT McDonald MAP Tech Board Meeting Oct 20, The MAP Targetry Program in FY11 and FY12 K. McDonald Princeton U. (Oct 20, 2011) MAP Technical Board.
1 Status of Neutrino Beamline Construction K. Nishikawa IPNS, KEK 2006 . 12 . 4.
HK Secondary Beam Issues Chris Densham STFC Rutherford Appleton Laboratory.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
F NuMI Beamline Accelerator Advisory Committee Presentation May 10, 2006 Mike Martens Fermilab Beams Division.
Collimation for the Linear Collider 15 th Feb 2005 Chris Densham RAL Elastic Stress Waves in candidate Solid Targets for a Neutrino Factory.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
Investigation of a “Pencil Shaped” Solid Target Peter Loveridge, Mike Fitton, Ottone Caretta High Power Targets Group Rutherford Appleton Laboratory, UK.
Megawatt targets for Neutrino Super-Beams (Apr. 4, 2013) RAL High Power Targets Group: Chris Densham, Tristan Davenne, Mike Fitton, Peter Loveridge, Matt.
Superbeam target work at RAL Work by: Ottone Caretta, Tristan Davenne, Peter Loveridge, Chris Densham, Mike Fitton, Matt Rooney (RAL) EURONu collaborators:
BENE/CARE Frascati November 2006 CJ Densham CCLRC Rutherford Appleton Laboratory Solid target studies in UK for T2K and for a neutrino factory JRJ.
SPL-SB and NF Beam Window Studies Stress Analysis Matt Rooney, Tristan Davenne, Chris Densham March 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES N. Simos, BNL EUROnu-IDS Target Meeting December 15-18, 2008 Superbeam Horn-Target Integration.
Status of UK contribution to LBNF beam and target system Chris Densham, Tristan Davenne, Otto Caretta, Mike Fitton, Peter Loveridge, Joe O’Dell, Andrew.
ESSnuSB Target Chris Densham, Tristan Davenne STFC Rutherford Appleton Laboratory 26 th May 2014.
Packed Bed Target Design Concept (for EURONu) Tristan Davenne, Ottone Caretta, Peter Loveridge, Chris Densham (RAL); Andrea Longhin, Marco Zito (CEA Saclay)
Engineering studies for CN2PY secondary beam. LAGUNA-LBNO General Helsinki, 26/08/20141 F. Sanchez Galan (CERN) on behalf of the CERN Secondary.
Target Proposal Feb. 15, 2000 S. Childress Target Proposal Considerations: –For low z target, much less power is deposited in the target for the same pion.
High Power Target Experience with T2K Chris Densham T2K Beamline Collaboration including RAL / KEK / Kyoto.
The Development of Fluidised Powder Target Technology for a Neutrino Factory, Muon Collider or Superbeam Chris Densham Ottone Caretta, Peter Loveridge.
1 Target Introduction Chris Densham STFC/RAL Mu2e Target, Remote Handling, and Heat & Radiation Shield Review Nov
T2K Target status PASI Meeting Fermilab 11 th November Chris Densham STFC Rutherford Appleton Laboratory On behalf of the T2K beam collaboration.
Chris Densham Figures of Merit for target design for neutrons, neutrinos… Chris Densham Rutherford Appleton Laboratory.
Horn and Solenoid options in Neutrino Factory M. Yoshida, Osaka Univ. NuFact08, Valencia June 30th, A brief review of pion capture scheme in NuFact,
KT McDonald MAP Spring Meeting May 30, Target System Concept for a Muon Collider/Neutrino Factory K.T. McDonald Princeton University (May 28, 2014)
EUROnu Super Beam Work package Marco Zito (IRFU/CEA-Saclay) For the WP2 team EURONu Review CERN April
Target work plan for LBNO study Chris Densham STFC Rutherford Appleton Laboratory.
Irradiated T2K Ti alloy materials test plans
Skeleton contributions to targets section
Tungsten Powder Test at HiRadMat Scientific Motivation
Beam Window Studies for Superbeams
WP2 (SuperBeam) Targets Status of Work Programme
Target and Horn status report
M. Calviani, A. Ferrari (EN/STI), P. Sala (INFN)
Accelerator R&D for Future Neutrino Projects
Beam Dump outline work plan (UK perspective)
EUROnu Beam Window Studies Stress and Cooling Analysis
Superbeam Horn-Target Integration
SPL-SB and NF Beam Window Studies Stress Analysis
Presentation transcript:

T2K Target & Secondary Beamline - progress towards a neutrino Superbeam? Chris Densham

Chris Densham UKNF Oxford 16 Sept 2008 OA3° OA0° (ref.: BNL-E889 Proposal)  Target Horns Decay Pipe Super-K.  Quasi Monochromatic Beam  x 2~3 intense than NBB Statistics at SK (OAB 2.5 deg,1 yr,22.5 kt) ~ 2200  tot ~ 1600  CC e ~0.4% at  peak Tuned at oscillation maximum Neutrino energy spectrum  x  OA2° OA2.5° T2K: Off-Axis Neutrino Beam

Chris Densham UKNF Oxford 16 Sept 2008 ― ‘Official’ T2K Roadmap ― (as quoted by Kobayashi-san 2 weeks ago at CARE) Day1 (up to Jul.2010) Next StepKEK RoadmapUltimate? [Not official any more] Power(MW) [3-4 MW] ? [Original objective] Energy(GeV)30 [50] Rep Cycle(sec) No. of Bunch688[8] Particle/Bunch1.2×10 13 <4.1× ×10 13 Particle/Ring7.2×10 13 <3.3× ×10 14 LINAC(MeV) RCSh=2h=2 or 1h=1 After 2010, plan depends on financial situation 3

Chris Densham UKNF Oxford 16 Sept 2008 Specified Beam Powers for T2K Secondary Beamline design – towards a Superbeam Start-up date: 1 st April 2009 (Japanese politics) Components built for Phase I: 0.75 MW –Beam window –Baffle (collimator) –Target + 1 st horn Phase II power: 1.66 MW –Expected within 5 years –Need to start work on target + 1 st horn system upgrade soon Components built for ultimate power:3-4 MW –Target station –Decay volume –Hadron absorber (beam dump)

Chris Densham UKNF Oxford 16 Sept 2008 T2K Secondary Beam Line DV TS BD Hadron Absorber (Beam Dump) graphite core in helium vessel Target station (TS) Target & horns in helium vessel Helium vessel and iron shields cooled by water Decay Volume (DV) 94m long helium vessel cooled by water 6m thick concrete shield ‘280 m’ neutrino detector 50 GeV PS ring Primary beam line Fast extraction Kamioka

Chris Densham UKNF Oxford 16 Sept Beam Graphite Blocks 4 MW Beam Dump / Hadron Absorber Displacement (max) = 8.5 mm at 4 MW

Chris Densham UKNF Oxford 16 Sept 2008 Hadron Absorber (November 2008)

Chris Densham UKNF Oxford 16 Sept 2008 T2K Target Station DV TS BD Hadron Absorber (Beam Dump) graphite core in helium vessel Target station (TS) Target & horns in helium vessel Helium vessel and iron shields cooled by water Decay Volume (DV) 94m long helium vessel cooled by water 6m thick concrete shield ‘280 m’ neutrino detector 50 GeV PS ring Primary beam line Fast extraction Kamioka

Chris Densham UKNF Oxford 16 Sept 2008 Proton Beam Window + pillow seals. Installed October 2008

Chris Densham UKNF Oxford 16 Sept 2008 Baffle / Collimator –installation imminent

Chris Densham UKNF Oxford 16 Sept 2008 T2K Target area Inner iron shields Inner concrete shields Support structure = Helium vessel (being constructed by Mitsui Ship. Co.) BaffleTarget and 1st horns 2nd horns 3rd horns Beam window

Chris Densham UKNF Oxford 16 Sept 2008 Specification of Phase 1 Target Design Graphite rod, 900 mm (2 interaction lengths) long, 26 mm (c.2σ) diameter c.20 kW (3%) of 750 kW Beam Power dissipated in target as heat Helium cooled (i)to avoid shock waves from liquid coolants e.g. water and (ii)to allow higher operating temperature Target rod completely encased in titanium to prevent oxidation of the graphite Helium cools both upstream and downstream titanium window first before cooling the target due to Ti-6Al-4V material temperature limits Pressure drop in the system should be kept to a minimum due to high flow rate required (max. 0.8 bar available for target at required flow rate of 32 g/s (30% safety margin)) Target to be uniformly cooled (but kept above 400°C to reduce radiation damage) It should be possible to remotely change the target in the first horn Start-up date: 1 st April 2009

Chris Densham UKNF Oxford 16 Sept 2008 Graphite to titanium diffusion bond Graphite-to-graphite bond Flow turns 180° at downstream window Inlet manifold Outlet manifold Upstream Window Target Design: Helium cooling path

Chris Densham UKNF Oxford 16 Sept 2008 IG43 Graphite diffusion bonded into Ti-6Al-4V titanium, Special Techniques Group at UKAEA Culham Diffusion Bond + Graphite-Graphite bonding test Aluminium intermediate layer, bonding temperature 550ºC Soft aluminium layer reduces residual thermal stresses in the graphite Graphite-Graphite bonding Graphite transfer to Aluminium

Chris Densham UKNF Oxford 16 Sept 2008 Steady state target temperature 30 GeV, Hz, 750 kW beam Radiation damaged graphite assumed (thermal conductivity 20 [W/m.K] at 1000K- approx 4 times lower than new graphite) Maximum temperature = 736˚C

Chris Densham UKNF Oxford 16 Sept 2008 Pressures (gauge) Pressure drop = bar Helium cooling velocity streamlines Maximum velocity = 398 m/s

Chris Densham UKNF Oxford 16 Sept 2008 Prototype Target Integration with 1 st Magnetic Horn – August 2008

Chris Densham UKNF Oxford 16 Sept 2008 Target installed within 1 st magnetic horn

Chris Densham UKNF Oxford 16 Sept 2008

Pulsed beam induced thermal stress waves in target graphite Max. Von Mises Stress = 7 MPa - cf graphite strength ~37 MPa – should be OK 8 bunches/spill Bunch length: 58ns (Full width) Bunch spacing: ~600(300) ns Rep. rate: 0.47 Hz Spill width ~5  s

Chris Densham UKNF Oxford 16 Sept MeV proton fluence ~10^21 p/cm2 c. 1 year operation in T2K (phase 1, 750 kW) We don’t expect targets to last long! Targets can be changed within magnetic horn Radiation Damage in IG43 Graphite - data from Nick Simos, BNL

Chris Densham UKNF Oxford 16 Sept 2008 Target Remote Replacement Commissioning (Nov 2008) Installation of manipulators into hot cell Offering up target replacement system to magnetic horn Disconnecting target from horn Withdrawing target from horn

Chris Densham UKNF Oxford 16 Sept 2008 Options for Neutrino Superbeams Static target difficult beyond 1 MW beam power – problems include: –Power dissipation –Thermal stress –Radiation damage –High helium flow rate, large pressure drops or high temperatures Expect to replace target increasingly often as beam power increases Is it possible to combine a moving target with a magnetic horn? New target technology may be necessary above c. 1 MW beam power

Chris Densham UKNF Oxford 16 Sept 2008 Liquid mercury jets for neutrino facilities In principle, the problem of pulsed beam interactions with a mercury target may be solved for an open jet injected into a high-field (c.20 T) solenoid However, many difficult engineering, materials and radiochemistry issues remain to be solved What candidates are there for a neutrino Superbeam target, e.g. T2HK (T2K Phase 2) or at the SPL at CERN?

Chris Densham UKNF Oxford 16 Sept 2008 EUROnu proposal for CERN SPL Superbeam forsees mercury jet ( a la MERIT)… But…

Chris Densham UKNF Oxford 16 Sept 2008 Helium Beam window beam Helium Powder hopper A flowing powder target for a Superbeam or Neutrino Factory? See Otto Caretta’s talk Magnetic horn

Chris Densham UKNF Oxford 16 Sept 2008 Summary:Targets for a Neutrino Superbeam Yield ~ target production & capture efficiency × reliability Target efficiency much simulated/optimised, however system reliability is generally unknown Graphite targets achievable for deposited powers up to ≈ 30 kW for multi-GeV proton beams Limits of solid target technology not yet demonstrated Important to distinguish between beam power (750 kW for T2K) with beam power deposited in target (20 kW for T2K) Open liquid metal jets may be feasible for a future neutrino factory or muon collider, but not necessarily for a Superbeam New ideas probably required for Superbeam targets e.g. different materials (Be?), flowing powders?