John Wloch Wind-Aid Preliminary Design Review 26 February 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.

Slides:



Advertisements
Similar presentations
Robo-FootballE2 Project Design Review 1 - 1/31/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
Advertisements

PDR: 2/7/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
Develop a Solution Plan (Project Scheduling). Tools of the Trade Schedule Formats Gantt ChartsGantt Charts PERT/CPM ChartsPERT/CPM Charts DSM (design.
Revolutionary Technologies Group C1 Nicholas Arch, Nicholas Fraser, Robert Huth, Patrick Noble, Michael Toomey Preliminary Design Review March 20, 2008.
John Wloch Wind-Aid Critical Design Review 4/22/2008 Andy CrutchfieldJames Gates Keri Macaulay David Rupp.
John Wloch Wind-Aid Preliminary Design Review 19 February 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
Preliminary Design Review HMS Bloodhound Matt Morris, Matt Prygoski, Jay Slaggert Fred Thwaites, Dan Zibton.
Small-Scale Solar Power Solar Power Rangers ~ Phillip Hicks 31 January 2008.
Single Category Classification Stage One Additive Weighted Prototype Model.
P09451 Thermo-Electric Module for Large Scale Systems Bryan McCormick-ME(Team Lead) Andy Freedman- ME John Kreuder- ME Jon Holdsworth- EE Gabriela Santa.
Preliminary Design Review Week 6 Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday March 13, 2008.
Small-Scale Solar Power Solar Power Rangers ~ Kevin Kastenholz 13 March 2008.
John Wloch Wind-Aid Preliminary Design Review 8 April 2008 Andy CrutchfieldJames Gates Keri Macaulay David Rupp.
Preliminary Design Review HMS ‘Hound Dog’ Matt Prygoski Matt Morris Dan Zibton Fred Thwaites Jay Slaggert Thursday February 7, 2008.
John Wloch Wind-Aid Preliminary Design Review 1 April 2008 Andy CrutchfieldJames Gates Keri Macaulay David Rupp.
Small-Scale Solar Power Solar Power Rangers ~ Kevin Kastenholz 7 February 2008.
PDR: 2/21/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
PDR: 1/31/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
AME Senior Design Group E3: Hewlett-Packers February 19, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
PDR: 2/22/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
Bangarang Musical Engineering University of Notre Dame Department of Aerospace and Mechanical Engineering Group Members: Roberto Ayala, Ryan Bradley, Pat.
John Wloch Wind-Aid Preliminary Design Review 25 March 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
A6: Team Rallye Potable Water Still Presented by: Full Group November 15, 2006.
Turbinator Technologies Concept Design Review Group C4: Turbinator Technologies April 22 nd and 24 th, 2008 Bryan Delaney, Robert Herzog, John Larson,
Team HazardHawk Team HazardHawk Last Week  Trim Budget Complete ○ Select new driveshaft, sprocket, bearings ○ Select additional component: clips.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday February 21, 2008.
PDR: 3/20/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
AME Senior Design Group E3: Hewlett-Packers February 26, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
AME Senior Design Group E3: Hewlett-Packers March 11, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Interactive Xylophonic Keyboard Mini-Mozarts November 9, 2006 Gordon Farmer Michael Johnson Eric Laumann Bryan Marek Philip Moss.
Bad News Bots E2 Project Design Review 2 - 2/7/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
The goal of this project is to provide inexpensive electricity to citizens of third world countries who have limited access to electricity. The scope of.
Milki Wakweya Jennifer Long Fairman Campbell Pranav Boda Advisor: Dr. Ajjarapu.
Micro Wind for Remote Sites James Jarvis APRS World, LLC
Hybrid Wind and Solar Generation System MAY Team: Daoxi Sun, Riley O'Connor, Trevor Webb, Shihao Ni, Xiaokai Sun, Ben Ryan Advisor, Client: Venkataramana.
Motors Make the world go ‘round By Jackson Greer, Room 305.
Status Report #7 Portable Solar Power Supply Team# 13 Eric Camacho John Michael McLeod Ky Dinhquoc Nguyen Kelechi (Kc) Nwogu 03/23/2011.
Status Report #8 Portable Solar Power Supply Team# 13 Eric Camacho John Michael McLeod Ky Dinhquoc Nguyen Kelechi (Kc) Nwogu 04/06/2011.
1 Modeling Electrical Energy In A Home With Renewable Stored Energy William Thorne Spring 2015 Physics Seminars March 25 th, 2015.
John Wloch Wind-Aid Preliminary Design Review 11 March 2008.
Free Space Optical Communications Senior Design Project Fall 2011 TEAM AWESOME.
Free Space Optical Communications Senior Design Project Fall 2011 TEAM AWESOME.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
Kurran Kelly – Lead Designer Silas Van Natter – Team Lead Josh Van Patten – Team Budget Manager Brandt Pedrow – Team Liaison and Recorder Branden Bakken.
Wind-Diesel & H 2 Activities in Canada March 10, 2011 Carl Brothers, P.Eng., Frontier Power Systems Ramea Wind-Diesel Project Ramea, NL.
AME Senior Design Group E3: Hewlett-Packers March 18, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Status Report #6 Portable Solar Power Supply Team# 13 Eric Camacho John Michael McLeod Ky Dinhquoc Nguyen Kelechi (Kc) Nwogu 02/28/2011.
Инвестиционный паспорт Муниципального образования «Целинский район»
(x – 8) (x + 8) = 0 x – 8 = 0 x + 8 = x = 8 x = (x + 5) (x + 2) = 0 x + 5 = 0 x + 2 = x = - 5 x = - 2.
Alternative Portable Power Systems. Amateur Radio Considerations Radio communications during power outage Remote operation Extra points during contesting.
Project Meeting 12 Paul Capelli, Matt Bernstein, Jared Segal.
The Production Process What are the four stages of production? How are things mass produced?
Revolutionary Technologies Group C1 Nicholas Arch, Nicholas Fraser, Robert Huth, Patrick Noble, Michael Toomey Preliminary Design Review February 21, 2008.
BWC XL.1 BWC XL.1  New Technology Throughout  8.2 ft. Rotor Diameter  Excellent Low Wind Performance (DC-DC Boost Circuit)  First 1 kW Class Turbine.
Revolutionary Technologies Group C1 Nicholas Arch, Nicholas Fraser, Robert Huth, Patrick Noble, Michael Toomey Preliminary Design Review February 7, 2008.
A6: Team Rallye Potable Water Still Presented by: Mike McConnell November 2, 2006 Nicole Del Rey Mike McConnell Tim Rodts Eric Sabelhaus.
Mid-Term Presentation February 28, Team Members Charlie Mraz EE Team Leader Analog Design PCB Layout Allen Joiner EE Power Supply Purchasing/Finance.
John Wloch Wind-Aid Preliminary Design Review 5 February 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
AME Senior Design Group E3: Hewlett-Packers February 7, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
AME Senior Design Group E3: Hewlett-Packers (Robo-football Quarterback) March 27, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
照片档案整理 一、照片档案的含义 二、照片档案的归档范围 三、 卷内照片的分类、组卷、排序与编号 四、填写照片档案说明 五、照片档案编目及封面、备考填写 六、数码照片整理方法 七、照片档案的保管与保护.
공무원연금관리공단 광주지부 공무원대부등 공적연금 연계제도 공무원연금관리공단 광주지부. 공적연금 연계제도 국민연금과 직역연금 ( 공무원 / 사학 / 군인 / 별정우체국 ) 간의 연계가 이루어지지 않고 있 어 공적연금의 사각지대가 발생해 노후생활안정 달성 미흡 연계제도 시행전.
Жюль Верн ( ). Я мальчиком мечтал, читая Жюля Верна, Что тени вымысла плоть обретут для нас; Что поплывет судно громадней «Грейт Истерна»; Что.
PSX-R. What is the PSX-R? PSX-R is a separate high quality power supply PSX-R acts like a giant battery PSX-R supplies regulated smooth DC power to the.
IT 242 Week 6 Exercise Toolwire® Lab To purchase this material link 242-Week-6-Exercise-Toolwire-Lab For more.
IT 244 Week 7 Access Control Cryptography To purchase this material link 244-Week-7-Access-Control-Cryptography.
Discrete Mathematics CS 2610
Presentation transcript:

John Wloch Wind-Aid Preliminary Design Review 26 February 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp

Current Status – On Schedule Project is advancing through theoretical stages Component selection is continuing Results of trade studies have been discussed. Ready to move forward in purchasing components. Ready to move project to practical design stage. Wind-Aid Show Stoppers: None at this time We are on schedule, per group and class project timetables

Last Week Action Items: Combine individual trade study results Blade design (28” blades) 12 V Voltage Regulator 70 lbs on base will withstand 30 mph wind Identify 3 key features prototype will demonstrate Package Requirements (3’x1.5’x1’) Ease of Assembly (1 person, <1 hour) Power Switch Capabilities Wind-Aid Air-X Blades

Wind-Aid 12 V Voltage Regulator*--Power Handling Capability *Windstream Power LLC

Next Week Action Items: Individual Trade Studies Complete formal trade studies Upload to website Order/Acquire components for prototype Generator Blades DC-DC Converter/Voltage Regulator Materials for base and tower Batteries Wind-Aid

Questions?