0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.

Slides:



Advertisements
Similar presentations
Common Portal Definitions AZ-SLDS Program Team July 2011 FOR EXAMPLE USE ONLY.
Advertisements

Project Management Tips Rick Rozzelle – Moderator Cathy Rinehart–Kansas Jim McMahon–Louisiana Deb Holdren - Georgia.
From Students… …to Professionals The Capstone Experience 09/14: Team Status Reports Dr. Wayne Dyksen Department of Computer Science and Engineering Michigan.
Instructions (Delete this slide.) 1.Required Template a.Do not edit the master slides. b.Do not change the organization or number of slides. c.Make your.
What’s up? (Delete this slide.) 1.What follows is the required skeleton for your presentation. 2.Do not change the organization or number of slides. Make.
Team Spider Interim Presentation. Team Spider Members Sponsor  Telecom Consulting Group N.E. Corp. (TCN) Advisor  Professor Raghu Reddy Students  Adam.
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
Technical Specification / Schedule Department of Computer Science and Engineering Michigan State University Spring 2007 Team : CSE 498, Collaborative Design.
Nov. 13, 2003CS WPI1 CS 509 Design of Software Systems Lecture #11 Thursday, Nov. 13, 2003.
Technical Specification / Schedule Department of Computer Science and Engineering Michigan State University Team : CSE 498, Collaborative Design.
6. & 7. Teams: Technical Specification / Schedule Project Title Team Member 1 Team Member 2 Team Member 3 Team Member 4 Department of Computer Science.
6. & 7. Team Technical Specifications and Schedule Wayne Dyksen Brian Loomis Department of Computer Science and Engineering Michigan State University Spring.
Meet the Team Abraham Taleb  4 th Year Industrial Engineer Jose Rodriguez  5 th Year Industrial Engineer Aaron Heyman  5 th Year Industrial Engineer.
What’s up? (Delete this slide.) 1.What follows is the required skeleton for your presentation. 2.Do not change the organization or number of slides. Make.
0-1 Team 1 Status Report (1 of 3) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team 1: Auto-Owners.
0-1 Team ?? Status Report (1 of 3) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team 1: Auraria.
EMBA Project Scope Management J. S. Chou, P.E., PhD.
Life Cycle Time Line Fall 2000 Spring 2001 Organization Plan.
Time & Expense Forms MRC Consulting. Project Goals Provide an automated web based Time & Expense reporting system for MRC Consulting and its clients.
These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer.
Distributed Software Development VLab project plan.
Travel Website Enhancement Project Project Update First Name Last Name.
Web (Website) Records Management. Agenda:  Brief Definitions and Outline – NARA  Vendors  Member Q & A  Who has formal policies for web/website management?
Project Scope Management Project management Digital Media Department Unit Credit Value : 4 Essential Learning time : 120 hours.
Rapid Application Development. What is RAD……..?  Rapid Application Development (RAD) is a software development process.  first developed during the.
Chapter 5 – The Client. Definition of the Client n Differences between Internal and External Clients.
Project Status Report Presenter Name Presentation Date.
Project Dragon Small Business Website Content Management System.
Example Template for Project Presentation
Comprehensive Everglades Restoration Plan Web evergladesplan.org.
© 2002 United Security Applications ERM USA A web Reporting tool for Legacy Databases. © 2003 United Security Applications.
A Fast and competitive world Today’s business enterprises function in an extremely fast, competitive and changing environment. A scenario where only.
Distributed Software Development QR Marks The Spot Project Plan Presentation Nicolas Jacquemoud.
Final Class Diagram for C++ Implementation Clickermatic Software Clicker.
Activity Monitoring Tool MIS 2008/2009 Software Project - Group 1 1/4 Architecture Technical Manager.
Phase One – Project Initiation and Set Up Project Name Your Area Health Service.
From Students… …to Professionals The Capstone Experience 01/25: Team Status Reports Dr. Wayne Dyksen Department of Computer Science and Engineering Michigan.
Becoming a Business Analyst An industry perspective.
PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management.
SEC.FAIL Information Security Defense Lab Setup. SEC.FAIL Instructions Each team will need to operate on a separate system profile. For the labs, you.
Images were sourced from the following web sites: Slide 2:commons.wikimedia.org/wiki/File:BorromeanRing...commons.wikimedia.org/wiki/File:BorromeanRing...
FILE TRANSFER SPEEDS OVER HTTP AND FTP Yibiao Li 06/01/2009 Christmas Meeting 2008/09.
Buy Indian Stock Images with High Resolution from Visuals Stock Pvt. Ltd. Web Site : - Contact No.
Contact Us.
Avast Antivirus Support Number USA,UK, AUS-Helpdesk
The Capstone Experience
How To Add A Xerox Printer To Google Chrome
Frio River Cabins - Frio Vacation Homes - Frio Country Resort
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Computer courses in Chandigarh CBitss Technologies, SCO: , Level 3rd, Sector 34A, Chandigarh,, Contact :

DESIGN PROJECT PRODUCTION PHASES DEFINE, STRUCTURE, DESIGN, BUILD AND TEST, DELIVERY ® Copyright 2012 Adobe Systems Incorporated. All rights reserved.
PBAN’s Use of SharePoint
The Capstone Experience
The Capstone Experience
The Capstone Experience
DESIGN PROJECT PRODUCTION PHASES DEFINE, STRUCTURE, DESIGN, BUILD AND TEST, DELIVERY ® Copyright 2012 Adobe Systems Incorporated. All rights reserved.
Status Report Presentation Team [Team Name]
LUCAS SURVEY 2015: an update on current survey
CSE 498, Collaborative Design
The Capstone Experience
Status Report Presentation Team [Team Name]
Firebase Vs. MongoDB: Choose the Best Database of 2019
Meet Us
Voyager Travel Adventures
Contact Us
Call Us : Pursatya Arts – Best Web Designing Company In Ambala.
SDLC (Software Development Life Cycle) Role Play
Presentation transcript:

0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description Point 1 –Description Point 2 Team #: Team Name

0-2 Team # Status Report (2 of 4) Server Systems / Software –Description &/or Status Point 1 –Description &/or Status Point 2 Development Systems / Software –Description &/or Status Point 1 –Description &/or Status Point 2 Web Site –Status Point 1 –Status Point 2 Team #: Team Name

0-3 Team # Status Report (3 of 4) Project Definition –Description Point 1 –Description Point 2 –Description Point 3 –Description Point 4 Technical Specification Document –Status Point 1 –Status Point 2 –Status Point 3 –Status Point 4 Team #: Team Name

0-4 Team # Status Report (4 of 4) Risks –Risk 1 Description Mitigation –Risk 2 Description Mitigation –Risk 3 Description Mitigation – Risk 4 Description Mitigation Team #: Team Name