IGen Fuser Bearing Project P11511. Agenda Meeting Timetable Start Time Review Topic 2:20Introductions 2:25Project Description 2:35Customer Needs 2:40Risk.

Slides:



Advertisements
Similar presentations
Advanced Information Systems Development (SD3043)
Advertisements

Multidisciplinary Senior Design Rochester Institute of Technology Dresser-Rand Painted Post P10459 MSD II Update Presentation 4/9/10 Team: Phil Eaton (ME)
Policy & Procedures Manuals for Supportive Housing Anne Cory Corporation for Supportive Housing MHSA Operations TA Call 2/2/11
Composite Filament Winding Machine: P09226 Shijo George Christofer Brayton Alex Sandy Tiago Santos Daniel Weimann Project Manager Electrical Engineer Chief.
Network Design and Implementation
Derek Meinke (ME, PM) Matthew Liff (ME) Tony Zhang (EE) Zaw Htoo (ISE)
Learning Objectives  Recognize the need for an investigation  Investigate the scene of the accident  Interview victims & witnesses  Distinguish.
Derek Meinke (ME, PM) Matthew Liff (ME) Tony Zhang (EE) Zaw Htoo (ISE)
P11511 Project Review. Project Team, Faculty, and Customer Project Team: – Project Lead: Kevin Argabright (ME) – Team Members: John Fitch Dean (ME) Mike.
Fuser Bearing Failure Analysis Kevin Argabright Michael Buonaccorso John Fitch Dean Justin Eichenberger.
Composite Filament Winding Machine: P09226 Christofer Brayton Shijo George Alex Sandy Tiago Santos Daniel Weimann Dr. Alan Nye Dr. David Orlicki Electrical.
6/10/2015SYSTEMS LEVEL DESIGN REVIEW 1 HEALTH-MONITORING OF A RECIPROCATING COMPRESSOR MSD1 – P12453 SYSTEMS LEVEL DESIGN REVIEW.
Overview Lesson 10,11 - Software Quality Assurance
Project Status Update II R09230: Open Architecture, Open Source Unmanned Aerial Vehicle for Imaging Systems A. Benjamin Wager (ME) B. Michael Skube (ME)
Software Development Process. Process Improvement Using the Shewhart Cycle 1.PLAN - Plan a change aimed at improvement, collect data, and establish a.
EDGE™ Centering Magnet Device P08028 By: Aaron Burger.
Project Status Update R10004: OS/OA Low Energy Printing Mechanical Engineers: Dean Culver Shawn Hoskins Derek Meinke Tim Salter.
iGen Fuser Bearing Project P11511
IGen Fuser Bearing Project P Agenda Meeting Timetable Start Time Review Topic 2:20Introductions 2:25Project Description 2:35Customer Needs 2:40Risk.
Motor Coupling Design Review The 2004 Idaho Future Truck needs a system to couple the AC induction motor to the power train. + = Motor Future Truck Happy.
IGen Fuser Bearing Project P Agenda Meeting Timetable Start Time Review Topic 3:30Introductions 3:35Project Description 3:45Customer Needs 4:00Risk.
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Design Reviews Objectives of the Design Review Participants for a successful.
Team 10 Air Conditioning Experiment Members –Sean Gallagher –Pamela McDowell –Brian Davison –Prathana Vanarath Sponsors –Dr. Wexler –Dr. Advani Advisor.
Ground Scouts P09207 Project Manager: Stewart Wadsworth Faculty Guide: Dr. Sahin Starting: Ending:
R I T Team Members: Dan Lester → Team Lead Chris Feuerstein → Lead Engineer/Electrical Lead Mike Schwec → Electrical Support Jacob Hillmon → Electrical.
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2006 R I T Design Reviews Objectives of the Design Review Participants for a successful.
8 February 2013P Xerox Bearing Tester Detailed Design Review [1]
Stoimen Stoimenov QA Engineer QA Engineer SitefinityLeads,SitefinityTeam6 Telerik QA Academy Telerik QA Academy.
The objective of this project was to design a dynamic similarity test rig to replicate the operating conditions of the main crank bearing in the Dresser-Rand.
Risk Assessment and Secretary Training. Secretary Write and send general notices to the society Notifies members about General meetings Liaises with Societies.
Chapter 17 Acquiring and Implementing Accounting Information Systems
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 27 Slide 1 Quality Management 1.
Systems, Design and Manufacturing Kernel Company Profile Rev 5.1 Dec, 2014.
S/W Project Management
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
Automatic Shift Controls for ATV Sponsored by: Joel Notaro Polaris Industries Advised by : Professor George Slack Project Family: Modular, Scalable, Open.
Software Project Management Lecture # 10. Outline Quality Management (chapter 26)  What is quality?  Meaning of Quality in Various Context  Some quality.
MSD I – Mid Project Presentation Winter 08/09 P09454: Design & Testing of Centrifugal Pump Components.
Motor Assisted Wheelchair Design Review 09/10/15.
Understand production and operations.
through Introduction  Particle Imaging Velocimetry (PIV) uses a sheet laser beam to illuminate particles that cross the sheet.  The particles.
DAVID ANDERSON RYAN DUNN BRYON ELSTON ELIZABETH FISCHER ROBERT MENNA GUIDE : BILL NOWAK CUSTOMER: DR. MICHAEL SCHRLAU (ME DEPARTMENT) P13375 : Computer.
Connecting with Computer Science2 Objectives Learn how software engineering is used to create applications Learn some of the different software engineering.
MSD Total Supplier Performance and Inventory Control Keleigh Bicknell, William Darlington, Alex Resnick, Brian Woodard.
P Magnetically Levitated Propeller Group Members: Eli, Zach, Mike, Joe, & Bernie.
Essential Standard 2.00 Understand nature of business. 1.
THROUGH NERANJAN DHARMADASA JAMES BROWN P09451: Thermo-Electric Module for Large Scale Systems.
May 10, 2013P Xerox Bearing Tester Final Project Review.
Unit 17: SDLC. Systems Development Life Cycle Five Major Phases Plus Documentation throughout Plus Evaluation…
P16680: AATech Universal Oil and Bag System System Design Review 9/29/15.
Magnetically Levitated Propeller Bernie Garcia (ME, Team Leader), Joe Bernardini (ME, Scribe), Elijah Sensenig (EE, System Integrator), Zachary Louison.
Magnetically Levitated Propeller Bernie Garcia (Me, Team Leader), Joe Bernardini (ME, Scribe), Elijah Sensenig (EE, System Integrator), Zachory Louison.
Electrophotographic Cascade Development Apparatus Team 15503:Zach Foggetti (ME) Dalton Mead (ME) Bridget Kearney (EE) Ruishi Shen (ISE) Tom Wossner (ME)
January 16, 2009Senior Design I - System Level Design Review System Level Design Review Senior Design I Low Energy Printing Project P09505.
Test Plan SP1: Time To Train User Plan: Gather a group of people and teach them individually how to use the system. Document how long it takes each.
Health and Safety Induction for Managers. Introduction This induction supplements the Health and Safety Induction for Staff and should be viewed by all.
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
Turbomachinery Flow Visualization P08453
Concept Level Project Plan P08008 – ArcWorks Process Improvement
Failure mode and effect analysis
Introduction to New Product Development (Portfolio)
Xerox Bearing Tester Final Project Review
Multidisciplinary Capstone Design:
Kris Kidder | John Dolan | Shay Stanistreet | Anthony Miuccio
P07107: Mission Control Procedures Aerospace Systems and Technology
P15661 Reciprocating Friction Tester Base Subsystem
Xerox Bearing Tester Systems Level Design Review
Project Readiness Review P10029 – Air Muscle Artificial Limb
P11017 Tactile Navigation Interface
Wednesday, February 16, 4:00-6:00PM
Presentation transcript:

iGen Fuser Bearing Project P11511

Agenda Meeting Timetable Start Time Review Topic 2:20Introductions 2:25Project Description 2:35Customer Needs 2:40Risk Assessments 2:55Concept Selection 3:10Houses of Quality 3:20Timeline 3:30Discussion 3:45Meeting Adjourned

Project Team, Faculty, and Customer Project Team: – Project Lead: Kevin Argabright (ME) – Team Members: John Fitch Dean (ME) Mike Buonaccorso (ME) Justin Eichenberger (ME) – Project Guide: William Nowak (Xerox Corporation) Faculty: – Consultant Dr. Stephen Boedo Customer: – Xerox Corporation Erwin Ruiz Melissa Monahan

iGen Machine

Running Conditions of Fuser Xroller forces are 184lbs each Reaction force of 360lbs/bearing Fuser rotates at 79.8RPM Outer race of the fuser bearings experience a temperature of 230°F

Customer Needs Develop method to characterize physical properties of bearings over their physical life Collect data on bearing properties Correlate physical property to end of life Incorporate multiple sensors Characterize physical properties over the bearing's physical life Create failure criteria Document the procedure (Testing) Testing bearings is quick and easy to do Document the procedure (Collecting Data)

Weighted Customer Needs Used a pairwise comparison chart Most Important Needs: – Develop method to characterize physical properties of bearings over their physical life – Document the procedure for collecting data

Project Scope Create a measuring tool to aid Xerox Corporation’s engineering team in collecting necessary data for characterizing bearing life in the iGen Fuser Assembly

Engineering Specs

Bearing Life

Risks RiskCauseMitigationSeverityLikelihoodTotal Data does not correlate No relationship exists between physical metric and bearing life Try multiple methods of data collection (acoustic, mag, proximity, etc..)326 Bearing life fixtures breakUse, mechanical wear Ensure proper training and seek rapid repair224 Our testing apparatus breaks Design error, mechanical wear, user error Design robustly and be prepared with replacement parts224 Needed item's lead time goes outside of project time frameManufacturing delays Ask manufactures for an estimate for lead time and stay in contact for updates224 No easy method for bearing testing on manufacturing floor Data collection and analysis take to long to be feasible for the throughput of Xerox Try multiple methods and speak with manufacturing to understand needs224 Time to collect data is too slow Data logging too slow, accelerated wear is insufficient Seek accelerated wear and ensure data loggers are sensitive enough224 Project goes over budget Sensors, raw materials and tooling are more expensive than thought Before purchasing submit a proposed budget to Xerox224 Measurement system fails Xerox standards Not enough collected data or to much inherent noise Speak with Erwin and Melissa to ensure our measurement is up to spec313 Sensors are lost, stolen or damagedTheft, accidents, neglect.Keep equipment secured at Xerox or RIT313 Customer is unhappy with deliverablesPoor Communication Maintain communications with Xerox throughout the project313 Team member is seriously injured or illSickness, death in family, etc.. Be prepared to delegate that person's responsibilities across the team212 Software is lost or corruptedLoss of flash drive or virusKeep multiple, up to date copies212 Team arguments cause delaysPoor Communication Allow for time to discuss ideas and concerns212 Travel to Xerox is prevented Weather, Xerox emergency, RIT emergency. Leave room in project timeline so that project does not hinge on any single day at Xerox111

Concept Generation

Concept Selection

Design chosen – Fixed Outer Race – Camshaft – DC motor – Conduction to outer surface – Belt – Accelerometer – Thermistor – Microcontroller – Labview

House of Quality

System Level Drawing

Timeline

Questions?

P11511 Senior Design Review Thank you for attending!