DAPRPA Grand Challenge, Unfinished Business, November 2, 2005 The Finish 18:44 / 143 miles 2004 Grand Challenge Course.

Slides:



Advertisements
Similar presentations
Improving Exam Feedback for Student Learning Bryan D. Bradley, Ed.D. Brigham Young University Testing Center.
Advertisements

Prospect Eleven: Princeton Universitys Autonomous Vehicle Entry 2005 DARPA Grand Challenge Thursday, February 6, 2006 National Physical Laboratory Teddignton,
Princeton University Prospect Eleven Dec 08, 2005 Prospect Eleven: The Making, Testing and Running of Princeton’s Entry in the 2005 DARPA Grand Challenge.
GPS Tracks & Timings of Prospect Eleven’s Autonomous Run of DARPA’s 2005 Course October 31, 2005.
GPS Tracks & Timings of Prospect Eleven’s Autonomous Rerun of Beer Bottle Pass November 1, 2005.
DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 Cruisin’ Over the UP Mainline 8:27 / 9.1 miles 2005 Grand Challenge Course 8:27.
DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 The Finish 19:36 / 132 miles 2005 Grand Challenge Course 19:36.
Prospect Eleven Fixin’ One Line of Code UNLV October 30, 2005.
DAPRPA Grand Challenge, Unfinished Business, November 2, :50 11:08 10:50 / 43 miles 2004 Grand Challenge Course.
DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 Prospect Eleven As Rescue Vehicle, 11:56 / 48.6 miles 2005 Grand Challenge Course 11:56 11:33.
DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 Back by Primm 8:18 PST 2005 Grand Challenge Course 8:18.
DAPRPA Grand Challenge, Unfinished Business, November 2, :19 / 63 miles 2004 Grand Challenge Course 12:19.
National Qualifying Event (NQE) California Speedway, Fontana, CA September 27 – Oct 5, 2005.
Prospect Eleven’s Autonomous Run of DARPA’s 2005 Course October 31, 2005.
DAPRPA Grand Challenge, Unfinished Business, October 31, :53 / 11.8 miles 2005 Grand Challenge Course 8:53.
Senior Thesis and Senior Independent Research by ORFE Faculty Thursday, April 8, 2010.
DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 Cruisin’ Autonomously, 10:31 /36 miles 2005 Grand Challenge Course.
DAPRPA Grand Challenge Event, October 08, 2005 The Launch of Prospect Eleven 2005 Grand Challenge Event Launch Movie.
DAPRPA Grand Challenge, Unfinished Business, November 1, 2005 Beginning the Assent: 16:57 Rerun to Beer Bottle Pass.
DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 Dry Again Lake Bed 8:05 PST 2005 Grand Challenge Course 8:05.
DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 Approaching Beer Bottle Pass 19:02 / miles 2005 Grand Challenge Course 19:02.
DAPRPA Grand Challenge Event, October 07, 2005 The Day Before; “E-119” Garage 2005 Grand Challenge Event.
DAPRPA Grand Challenge, Unfinished Business, November 2, :22 / 77.2 miles 2004 Grand Challenge Course.
Prospect Eleven Testing in Princeton Prior to NQE August, 2005.
DAPRPA Grand Challenge, Unfinished Business, November 2, :08 / Start 2004 Grand Challenge Course 7:08.
DAPRPA Grand Challenge, Unfinished Business 2004 Grand Challenge Course 143 miles The ’04GC Team 2004 Grand Challenge Course.
DAPRPA Grand Challenge, Unfinished Business, November 2, : Grand Challenge Course.
DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 Dry Lake Bed 8:13 PST 2005 Grand Challenge Course 8:13.
DAPRPA Grand Challenge, Unfinished Business, October 31, 2005 Another Narrow Gate, 11:12 / 46 miles 2005 Grand Challenge Course 11:12.
DAPRPA Grand Challenge, Unfinished Business, November 1, 2005 Back & Forth Return to Beer Bottle Pass Route to/from Beer Bottle Pass from Start of 2005.
The Grand Challenge By SJSU Team ????. Objective Autonomous Vehicle Race Starts at Barstow, CA Crosses Mohawk Desert (250 miles) Finishes in Las Vegas.
DAPRPA Grand Challenge, October 8, 2005 Grand Challenge Event Autonomous Run, 9.4 miles Finish, 9.4 miles Start PassBy.
/t/ / I d/ /d/ Try Again Go on /t/ / I d/ /d/
Distance Learning Survey Fall Distance Learning Survey, De Anza College, Fall 2007 Andrew LaManque, PhD Supervisor, Institutional Research and Elena.
1 Entrepreneurship in IT Prof. Mark Harris. 2 Coordinates Prof. Mark Harris Prof. Mark Harris Intel Corp/ University of Sofia Intel Corp/ University of.
By Alain L. Kornhauser, PhD Professor, Operations Research & Financial Engineering Director, Program in Transportation Faculty Chair, PAVE (Princeton Autonomous.
Embedded Systems Development and Applications Terrence Mak The Chinese University of Hong Kong CENG4480 Fall 2014/15.
Monday 8 th September 2014 Welcome to Campbell College.
Princeton University Prospect Eleven Nov. 17, 2005 Prospect Eleven: Princeton University's Entry in the 2005 DARPA Grand Challenge Thursday, November 17,
Feeder Version UP from the file in the Installation Disc Serial Number Current System Version.
Urban Challenge Sponsored by DARPA November 3 rd, 2007.
GPS Tracks & Timings of Prospect Eleven’s Autonomous Run of DARPA’s 2004 Course November 2, 2005.
Smart Driving Cars: Looking Back to Princeton’s participation in the DARPA Challenges Alain L. Kornhauser, Ph.D. Professor, Operations Research & Financial.
Autonomous Vehicle Initiatives at Princeton University Alain L. Kornhauser Professor, Operations Research & Financial Engineering Director, Transportation.
36 x 2 = ? A) 36 B) 72 C) 48 D) 76.
C.E. King Cross Country Our # 1 goal is to represent C.E. King High School with Pride and Integrity through our work ethic in preparing for our race each.
Acrylamide - Regulatory and Industry Update
S.A.I.L.S. Sailing using An Intelligent Logistician System
Business Management Courses Gives Competitive Edge.
Karr_List_NYC_Trips Alain L. Kornhauser
Association of Computing Machinery Student Chapter University of Florida Industrial Advisory Board March 9, 2006.
فصل نهم از کتاب طراحی آموزشی تألیف :آر.ام گانیه
Senior Thesis and Senior Independent Research
Science Planner 2/21/17 WALT: understand the formation of the Grand Canyon. WU: If the Grand Canyon is around 5200 feet deep, then how many inches.
Alain Prost 1955-Present.
Control 3 Day /05/16 LING 3820 & 6820 Natural Language Processing
NLP 2 Day /07/16 LING 3820 & 6820 Natural Language Processing
Recognising and Recording Progress and Achievement Roadmap Use this roadmap to map your journey through your course and to self assess your progress every.
Machine Learning Course.
AATS 94th Annual Meeting    The Journal of Thoracic and Cardiovascular Surgery  Volume 146, Issue 5, Pages (November 2013) DOI: /S (13)
Closing Time Daily Agenda Work Ethic Log Finishing time
Warm-up November 2, 2017 ½ * 4/7 = 2/3 ÷ 1/6 = ¼ ÷ 3/8 =
. Arroyo Verde Elem. Course 1.0 miles Start Down grass
HYDROLOGICAL TOOLS FOR WATER MANAGEMENT
Mixed Up Multiplication Challenge
5th Grade No Calculator Lesson
August 31-September 3.
Data Analytics course.
Wednesday, November 7 Pick up an ‘Islam Crossword Puzzle’
(Princeton Autonomous Vehicle Engineering)
Presentation transcript:

DAPRPA Grand Challenge, Unfinished Business, November 2, 2005 The Finish 18:44 / 143 miles 2004 Grand Challenge Course

DAPRPA Grand Challenge, Unfinished Business, November 2, 2005 The Finish 18: Grand Challenge Course L2R: Prof. Alain Kornhauser*71 P03, Andrew Saxe’08, Bryan Cattle’07, Scott Schiffres’06

DAPRPA Grand Challenge, Unfinished Business, November 2, 2005 The Finish 18: Grand Challenge Course L2R: Prof. Alain Kornhauser*71 P03, Andrew Saxe’08, Bryan Cattle’07, Scott Schiffres’06

DAPRPA Grand Challenge, Unfinished Business, November 2, 2005 The Finish 18: Grand Challenge Course L2R: Prof. Alain Kornhauser*71 P03, Andrew Saxe’08, Bryan Cattle’07, Scott Schiffres’06

DAPRPA Grand Challenge, Unfinished Business, November 2, 2005 The Finish 18: Grand Challenge Course