Stanford – Mar. 18-22, 2005 LCWS-2005 Norbert Meyners Upstream Polarimetry with 4-Magnet Chicane 1 Introduction & Overview O Compton polarimetry basics.

Slides:



Advertisements
Similar presentations
Polarimetry of Polarized Positrons K. Peter Schuler R&D polarimetry at or near source energies (5-50 MeV) Low-Energy Positron Polarimetry – general choices.
Advertisements

Fast and Precise Beam Energy Measurement at the International Linear Collider Michele Viti.
Design and Experimental Considerations for Multi-stage Laser Driven Particle Accelerator at 1μm Driving Wavelength Y.Y. Lin( 林元堯), A.C. Chiang (蔣安忠), Y.C.
Compton polarimetry for EIC Jefferson Lab Compton Polarimeters.
GUINEA-PIG: A tool for beam-beam effect study C. Rimbault, LAL Orsay Daresbury, April 2006.
1 Electron Beam Polarimetry for EIC/eRHIC W. Lorenzon (Michigan) Introduction Polarimetry at HERA Lessons learned from HERA Polarimetry at EIC.
E166 Collaboration J.C. Sheppard SLAC, October, 2003 E166 Background Test Simulations: Overview-what do we need J. C. Sheppard.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
K. LaihemE166 collaboration LCWS06 Bangalore March 12th 2006 The E166 experiment Development of a polarized positron source for the ILC. Karim Laihem on.
IPBI 6 April 05Ken Moffeit Polarimetry Design Updates - Dispersion in upstream chicane - 20mrad extraction line 0.75 mrad beam stay clear location of Synchrotron.
27 June 2006Ken Moffeit1 Comparison of 2mrad and 14/20 mrad extraction lines Ken Moffeit ILC BDS 27 June 06.
K. Moffeit 6 Jan 2005 WORKSHOP Machine-Detector Interface at the International Linear Collider SLAC January 6-8, 2005 Polarimetry at the ILC Design issues.
Background comparison between 20 mrad and 2 mr crossings Takashi Maruyama SLAC Machine-Detector Interface Workshop SLAC January 6-8, 2005.
20 March 2005Ken Moffeit LCWS1 Highlights from the MDI workshop Spin Rotation System for 2 IR’s Downstream polarimetry Ken Moffeit.
2 February 2005Ken Moffeit Spin Rotation scheme for two IRs Ken Moffeit SLAC.
F Specifications for the dark current kicker for the NML test facility at Fermilab S. Nagaitsev, M. Church, P. Piot, C.Y. Tan, J. Steimel Fermilab May.
M. Woods (SLAC) Beam Diagnostics for test facilities of i)  ii) polarized e+ source January 9 –11, 2002.
Photon Collider at CLIC Valery Telnov Budker INP, Novosibirsk LCWS 2001, Granada, Spain, September 25-30,2011.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
August 2005Snowmass Workshop IP Instrumentation Wolfgang Lohmann, DESY Measurement of: Luminosity (precise and fast) Energy Polarisation.
Beijing, Feb 3 rd, 2007 LEPOL 1 Low Energy Positron Polarimetry for the ILC Sabine Riemann (DESY) On behalf of the LEPOL Collaboration.
Status of the Beamline Simulation A.Somov Jefferson Lab Collaboration Meeting, May 11, 2010.
NEW COMMENTS TO ILC BEAM ENERGY MEASUREMENTS BASED ON SYNCHROTRON RADIATION FROM MAGNETIC SPECTROMETER E.Syresin, B. Zalikhanov-DLNP, JINR R. Makarov-MSU.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
Polarimetry at the LC Source Which type of polarimetry, at which energies for LC ? Sabine Riemann (DESY), LEPOL Group International Workshop on Linear.
Compton polarimetry for EIC Jefferson Lab Compton Polarimeters.
Synchrotron radiation at eRHIC Yichao Jing, Oleg Chubar, Vladimir N. Litvinenko.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
1 Options for low energy spin manipulation Ken Moffeit, SLAC 2009 Linear Collider Workshop of the Americas 29 September to 3 October 2009 K. Moffeit, D.
1 The Longitudinal Polarimeter at HERA Electron Polarization at HERA Laser System & Calorimeter Statistical and Systematic Precision Laser Cavity Project.
Electron Detection for Compton Polarimetry Michael McDonald Outline -Compton Effect -Polarimetry -Detectors -Diamond Results.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
19 July 2006Ken Moffeit1 Comparison of 2mrad and 14/20 mrad extraction lines Ken Moffeit (via Eric Torrence) VLCW06 19 July 06.
1 Overview of Polarimetry Outline of Talk Polarized Physics Machine-Detector Interface Issues Upstream Polarimeter Downstream Polarimeter Ken Moffeit,
Oct. 6, Summary of the Polarisation Session J. Clarke, G. Moortgat-Pick, S. Riemann 10 November 2006, ECFA Workshop, Valencia.
Spin Control and Transportation O. Adeyemi*, M. Beckmann**, V. Kovalenko*, L. Malysheva*, G. Moortgat-Pick*, S. Riemann**, A. Schälicke**, A. Ushakov**
BES-III Workshop Oct.2001,Beijing The BESIII Luminosity Monitor High Energy Physics Group Dept. of Modern Physics,USTC P.O.Box 4 Hefei,
EIC Compton detector update October 24 th 2014 Alexandre Camsonne.
A Short History of Nearly Everything Michele Viti.
Polarimetry Report Sabine Riemann on behalf of the DESY/HUB group January 24, 2008 EUROTeV Annual Meeting, Frascati.
Lecture 9: Inelastic Scattering and Excited States 2/10/2003 Inelastic scattering refers to the process in which energy is transferred to the target,
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Compton polarimetry for EIC. Outline Polarized electron beam Compton process Compton polarimeters at Jefferson Laboratory – Parity experiments at Jlab.
R.Chehab/ R&D on positron sources for ILC/ Beijing, GENERATION AND TRANSPORT OF A POSITRON BEAM CREATED BY PHOTONS FROM COMPTON PROCESS R.CHEHAB.
ILC EXTRACTION LINE TRACKING Y. Nosochkov, E. Marin September 10, 2013.
BDS Lattice Design : EDR plans GWP03 Meeting 04/12/2007.
Ken Moffeit SLAC LCWA09 1 Polarization Considerations for CLIC Ken Moffeit, SLAC 2009 Linear Collider Workshop of the Americas 29 September to 3 October.
The Luminosity Calorimeter Iftach Sadeh Tel Aviv University Desy ( On behalf of the FCAL collaboration ) June 11 th 2008.
1 First Results of the SLD Cerenkov Polarimeter at the DESY test beam Oleg Eyser Daniela K äfer, Christian Helebrant, Jenny List, Ulrich Velte*
Taikan SUEHARA et al., LCWS2007 & DESY, 2007/06/01 R&D Status of ATF2 IP Beam Size Monitor (Shintake Monitor) Taikan SUEHARA, H.Yoda, M.Oroku,
LCWS Paris – April 19-23, 2004 Polarimeter Issues K. Peter Schüler Polarimeter Issues 1 Polarimeter Studies for TESLA O General Considerations O.
MAIN DUMP LINE: BEAM LOSS SIMULATIONS WITH THE TDR PARAMETERS Y. Nosochkov E. Marin, G. White (SLAC) LCWS14 Workshop, Belgrade, October 7, 2014.
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
JLEIC MDI Update Michael Sullivan Apr 4, 2017.
A.P. Potylitsyn, I.S. Tropin Tomsk Polytechnic University,
M. Sullivan International Review Committee November 12-13, 2007
The Interaction Region
Analysis of 14/20 mrad Extraction Line Energy Chicane
Large Booster and Collider Ring
Overview of Polarimetry
AD & I : BDS Lattice Design Changes
ILC BDS Emittance Diagnostics: Design and Requirements
The PEP-II Interaction e+e- Factories Workshop
Electron Source Configuration
LHC (SSC) Byung Yunn CASA.
Interaction Region Design Options e+e- Factories Workshop
ILC Baseline Design: Physics with Polarized Positrons
Update on JLEIC Interaction Region Design
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Option 1: Reduced FF Quad Apertures
Presentation transcript:

Stanford – Mar , 2005 LCWS-2005 Norbert Meyners Upstream Polarimetry with 4-Magnet Chicane 1 Introduction & Overview O Compton polarimetry basics I, II, III O laser parameters O Tesla design & chicane design 4-Magnet Chicane O general layout & properties O movable laser beam O vacuum chambers O electron detector O some simulation results O synchr. radiation & emittance growth O remaining issues & homework Summary & Conclusion Upstream Polarimetry with 4-Magnet Chicane Vahagn Gharibyan, Norbert Meyners, Peter Schuler Mark Woodley IR1 IR2

Stanford – Mar , 2005 LCWS-2005 Norbert Meyners Upstream Polarimetry with 4-Magnet Chicane 2 Compton polarimetry basics I : Kinematics

Stanford – Mar , 2005 LCWS-2005 Norbert Meyners Upstream Polarimetry with 4-Magnet Chicane < P < < < + 1 Compton polarimetry basics II : cross sections, spin asymmetry, scattering angles e max = 2  o / m

Stanford – Mar , 2005 LCWS-2005 Norbert Meyners Upstream Polarimetry with 4-Magnet Chicane 4 Compton polarimetry basics III: luminosity for pulsed lasers f b = bunch crossings per sec N e, N  = no. of e,  per bunch g = geometry factor  x ,  y  = transverse laser beam size  z  = c  t  = laser pulse length  o = laser crossing angle  effectiveness of laser degrades with increasing pulse length & crossing angle

Stanford – Mar , 2005 LCWS-2005 Norbert Meyners Upstream Polarimetry with 4-Magnet Chicane 5 regen. multi-stage Nd:YLF ampl. (built by Max-Born-Inst.) operates at nominal pulse & bunch pattern of TESLA Laser for TTF injector gun  t = 8 ps S. Schreiber et al. NIM A 445 (2000) 427

Stanford – Mar , 2005 LCWS-2005 Norbert Meyners Upstream Polarimetry with 4-Magnet Chicane 6 Laser parameters for TESLA TDR (2001), we assumed TTF-style laser of variable wavelength:  green  IR  UV will employ same laser for ILC chicane polarimeter, but can operate with green line at all ILC beam energies

Stanford – Mar , 2005 LCWS-2005 Norbert Meyners Upstream Polarimetry with 4-Magnet Chicane 7 Tesla design V. Gharibyan, N. Meyners, K.P. Schüler, LC-DET minimal space & no special magnets need to change laser wavelength to UV for z-pole running

Stanford – Mar , 2005 LCWS-2005 Norbert Meyners Upstream Polarimetry with 4-Magnet Chicane 8 Chicane Design essential for downstream polarimetry (separates Compton electrons from low-energy disrupted beam background), but adventageous also for upstream polarimetry requires ~ 50 meters length same B-field at Z-pole, 250 GeV and 500 GeV running good acceptance of Compton spectrum at all energies without changing laser wavelength laser crossing (Compton IP) at mid-chicane K. Moffeit, M. Woods, W. Oliver (see ILC MDI workshop at SLAC, Jan. 2005)

Stanford – Mar , 2005 LCWS-2005 Norbert Meyners Upstream Polarimetry with 4-Magnet Chicane 9 4-Magnet Chicane: general layout

Stanford – Mar , 2005 LCWS-2005 Norbert Meyners Upstream Polarimetry with 4-Magnet Chicane 10 Chicane properties (see talk of W. Oliver, MDI workshop, SLAC, Jan. 2005) x x X max = 4  0 p T L / m²  position of Compton edge is independent of beam energy e.g. X max = 17.8 cm for  0 = 2.33 eV, P T = 0.25 GeV/c, L = 20 m

Stanford – Mar , 2005 LCWS-2005 Norbert Meyners Upstream Polarimetry with 4-Magnet Chicane 11 movable laser beam

Stanford – Mar , 2005 LCWS-2005 Norbert Meyners Upstream Polarimetry with 4-Magnet Chicane 12 Vacuum Chamber Overview chambers are tapered to minimize wake fields

Stanford – Mar , 2005 LCWS-2005 Norbert Meyners Upstream Polarimetry with 4-Magnet Chicane 13 Vacuum Chamber Detail laser beam crossing requires ~ 1 m long insertion/exit slots along z  will need detailed calculations with Mafia to determine wake fields

Stanford – Mar , 2005 LCWS-2005 Norbert Meyners Upstream Polarimetry with 4-Magnet Chicane 14 Electron Detector design similar to gas Cerenkov employed in SLD Compton polarimeter C 4 F 10 gas (~10 MeV threshold) detector will be immune against low-energy and diffuse background (syn. rad.) do not need explicit preradiator, due to high intrinsic event flux (less cross talk) 20 channels, 10 mm wide each, will cover a large fraction of the Compton spctr. E max / E 0 = 85%; 50%; 33% at E 0 = 45.6; 250; 500 GeV (with x min = 20 mm)

Stanford – Mar , 2005 LCWS-2005 Norbert Meyners Upstream Polarimetry with 4-Magnet Chicane 15 some simulation results I input parameters results 0.5 x 10^6 no. of Compton evt‘s per polarity random seed 2.33 laser photon energy (eV) 250. electron energy (GeV) 10. crossing angle (mrad) 1.50 luminosity (10^32 / cm² / sec) chicane transv. mom. kick (GeV/c) 2. magnet length (m) 20. cntr. dist. magnets 1&2 (3&4) (m) 10. cntr. distance magnets 2&3 (m) 0.7 dist. mag. 4 edge to det. ch. n (m) 20 no. of det. channels (max. 100) 10. det. channel x-size (hor.) (mm) 20. det. channel y-size (vert.) (mm) 150. det. channel length along z (mm) 20. distance det. ch. 1 to beam (mm) 50. z-dist. btw. det. channels (mm) 1. meas. time for stat. error (sec) 0.80 beam pol. to calculate stat. error E 0 = 250 GeV  0 = 2.33 eV (green laser) L = 1.5 x /cm²/sec Ch. # x [mm] N+ N- A Rate*A² Rate [MHz] dP/P [%] ,682 23, ,868 17, ,673 16, ,337 16, ,996 16, ,333 17, ,248 18, , ,881 20, ,815 21, ,246 21, ,849 22, ,479 23, ,385 23, ,346 24, , overall stat. error: dP/P = 0.082% for dT = 1 sec

Stanford – Mar , 2005 LCWS-2005 Norbert Meyners Upstream Polarimetry with 4-Magnet Chicane 16 some simulation results II

Stanford – Mar , 2005 LCWS-2005 Norbert Meyners Upstream Polarimetry with 4-Magnet Chicane 17 synchrotron radiation E  a  E / el.  E / bunch  / sec  total power  per magnet  (4 magnets) [GeV] [mrad] [mm] [MeV] [mJ] [kJ] [kW] (*) (**) (*) 2 x el./bunch (**) 5 x 2,820 = 14,100 bunches/sec

Stanford – Mar , 2005 LCWS-2005 Norbert Meyners Upstream Polarimetry with 4-Magnet Chicane 18 emittance growth from synchrotron radiation  beam E cm  x /  x [GeV] [GeV] [%] ,  acceptable scaled from figures obtained by N. Walker for energy measurement chicane by comparison, polarimeter chicane generates only 2/3 of synchr. rad. power at E cm = 1 TeV and 1/3 of emittance growth for polarimeter chicane,  scales as E³

Stanford – Mar , 2005 LCWS-2005 Norbert Meyners Upstream Polarimetry with 4-Magnet Chicane 19 remaining issues & homework wake field calculations with Mafia chicane bunch (de)compression effects alignment issues: BPM‘s, surveying techniques engineering of magnets, vacuum chambers, optics, etc what else?

Stanford – Mar , 2005 LCWS-2005 Norbert Meyners Upstream Polarimetry with 4-Magnet Chicane 20 summary & conclusion we have extended our upstream polarimeter study to the chicane spectrometer design the chicane has several important advantages so far, we have not found any serious problems with it, but our work is not yet finished it looks very much like „We should go for the chicane!“