GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Elliott.

Slides:



Advertisements
Similar presentations
GLAST LAT Project Calibration and Analysis Meeting, 28 Nov 2005 E. Grove et al. 1 Proposed Flight Trigger Configuration: Engines and Scheduler Table J.
Advertisements

GLAST LAT Project Managers F2F Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test April.
GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 1 GLAST Large Area Telescope: EM1 Data Analysis and Calibration Summary Report Eduardo.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.31 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 Preliminary Studies on the dependence of Arrival Time distributions in the LAT using CAL Low Energy Trigger.
GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 1/31 Overview of End to End Runs Eduardo do Couto e Silva April 1, 2005 ( not it is not a joke, we finally.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.1 Ground Operations Software 1 Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 1 GLAST Large Area Telescope: I&T Integration Readiness.
GLAST LAT Project Integration and Test SVAC Peer Review 1 GLAST Large Area Telescope: I&T Integration Readiness Review SVAC Peer Review July 21,
A.Chekhtman1 GLAST LAT ProjectCalibration and Analysis group meeting, April, 3, 2006 CAL on-orbit calibration with protons. Alexandre Chekhtman NRL/GMU.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test J. Panetta 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
A.Chekhtman1 GLAST LAT ProjectInstrument Analysis meeting, June, 24, 2005 CAL retriggering study with SLAC data. Alexandre Chekhtman NRL/GMU Gamma-ray.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
GLAST LAT Project Managers F2F 5/11/ Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Project Technical/Cost/Schedule Review 03/31/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Gary.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project Instrument Analysis Meeting– Dec 9, 2005 Takuya Kawamoto, TKR Noisy Strip determination 1 Noisy Strip determination Takuya Kawamoto (Hiroshima.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 1/6 SVAC EM2 Goals Develop distributions for E2E tests that involve comparison of.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
Alex Moiseev NASA/GSFC 12/16/2005 Some ACD Calibration issues I.ACD mip peak monitoring 1. ACD mip peak monitoring requires the measurements to be done.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project Technical/Cost/Schedule Review 05/24/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Project Instrument Analysis Workshop #4, 14 July 2005 David Smith CAL calib at SLAC SVAC1 Stability of the CAL Calibrations Online script “suites”
GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 1/5 Final Proposal for Phase 1 and 2 SVAC, E2E Tests (hereafter LAT 70X, 80X) Eduardo,
GLAST Large Area Telescope:
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 8 - Page 1 GLAST Large Area Telescope: I & T Peer.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
Aa GLAST Particle Astrophysics Collaboration Instrument Managed and Integrated at SLAC/Stanford University The Gamma-ray Large Area Space Telescope (GLAST)
GLAST The GLAST Balloon Flight experiment was performed with the collaboration of NASA Goddard Space Flight Center, Stanford Linear Accelerator Center,
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
In high energy astrophysics observations, it is crucial to reduce the background effectively to achieve a high sensitivity, for the source intensity is.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT Project IFC Tour – Sep 5,2003 Larry Wai 1 GLAST Large Area Telescope: Integration and Facility Status Larry Wai SU-SLAC Integration and Facility.
1 Study of Data from the GLAST Balloon Prototype Based on a Geant4 Simulator Tsunefumi Mizuno February 22, Geant4 Work Shop The GLAST Satellite.
Gamma-ray Large Area Space Telescope -France -Germany -Italy -Japan -Sweden -USA Energy Range 10 keV-300 GeV. GLAST : - An imaging gamma-ray telescope.
GLAST LAT ProjectMini-Review, 30 January 2003 LAT-PR-#####-## 1 I & T Responsibility LAT I&T, Verification, and Calibration Flow VibeRandom vibrate/sine.
After integration and test at SLAC and GSFC, BFEM was shipped to the National Scientific Balloon Facility (NSBF) at Palestine, Texas. The experiment was.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/ Particle Test 1 GLAST Large Area Telescope: Particle Test “Roadmap to Integration”
Report of GLAST Balloon Flight October Annual meeting of Astronomical Society of Japan T. Mizuno and other GLAST Balloon Team
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
“minimum-ionisation” peak
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
Overview Goal Study GEM variables in SVAC ntuple
Mini Tower Preliminary Results
CR Photon Working Group
Integration and Test Organization Chart
GLAST Large Area Telescope: I&T Test Readiness Review
Eduardo do Couto e Silva Feb 28, 2006
Shaped Digital Readout Noise in CAL
Analysis of GLAST Balloon Experiment Data
GLAST Large Area Telescope: I&T Test Readiness Review
Presentation transcript:

GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Elliott Bloom I&T Manager Gamma-ray Large Area Space Telescope

GLAST LAT Project11/18/04 I&T Two Tower IRR 2 Status of Docs DocTitleIn LAT Docs In Sign Off All Signed LAT-TD Particle Test PlanXX LAT-TD Calibration of the VG Photon FluxXX LAT-TD VG Accelerator Safety/Operations Handbook (includes VG operation procedure) XXX LAT-TD VG and CR Data Runs for LAT IntegrationX LAT-PS Procedure to Take Simultaneous BGO and LAT DataXX X LAT-TD How to Set the LAT Timing RegistersXX LAT-TD How to Measure the LAT Trigger Jitter Using the Muon Telescope XX LAT-TD Muon Telescope (includes Muon Telescope operation procedure) XX LAT-TD Use of an Am241 Source for High Rate Triggering (includes source use procedure) X

GLAST LAT Project11/18/04 I&T Two Tower IRR 3 Status of Equipment –Van de Graaff External reliability upgrades done Internal reliability upgrades next time VG must be opened 12 weeks (~30 hrs of running) since last fix (Aug 25, 2004) VG is ready to deliver 17.6 MeV gammas for 1 and 2 towers –Old Muon Telescope Working and being used for EM2 timing measurements. Old telescope described in LAT-TD –New Muon Telescope Meets the new requirement added by consensus to E2E/SVAC for measuring the tower trigger efficiency. Only gives an external trig when muon passes through the tower New telescope described in LAT-TD (in sign off) Smaller scintillators being fabricated. New telescope will be operational by Dec 10.

GLAST LAT Project11/18/04 I&T Two Tower IRR 4 VG and BGO Monitor Description Van de Graaff EM1 + VG Target + BGO Photon Monitor 2 : 1 P (440 Kev) + Li 7 → Be 8 (1+)* → Be 8 +  (17.6 Mev and 14.6 Mev)

GLAST LAT Project11/18/04 I&T Two Tower IRR 5 Muon Telescope Description Old Muon Telescope Clean Room New Muon Telescope (Stand same as for Old Telescope)

GLAST LAT Project11/18/04 I&T Two Tower IRR 6 Use Am 241 Source as Fast Trigger for E2E Testing (In review) 7.5 mCurie Am 241 source (60 keV x-ray) at SLAC available for I&T use in Room 104 as needed. Accidental coincidences between Si layer x-ray hits make 6 in a row triggers. –Source at different distances from the center of a tower front face generates the high trig rates in the E2E Nominal Rate Cosmic runs. –The source is a 1 cm diameter disk. –LAT-TD includes the procedure for source use. (in review) –Trig rate vs. distance measured for EM2. Agrees with calculation for 7.5 mCurie source (see Figure below) Hz cm Tests TKR trigger Path directly by activating TKR 3-in- a-row trigger primitive. External pulser trigger is a separate trigger path in the GASU, and is not used in flight

GLAST LAT Project11/18/04 I&T Two Tower IRR 7 Two Tower E2E Particle Data Runs LAT-MD Ad Committee on End-to-End Testing (E2E) LAT-TD VG and CR Data Runs for LAT Integration Individual Tests: 75 runs each with its own script (schema file) = 82 hours 1) Baseline Comic Ray (CR) Test # of 1 hour Runs –Nominal (as in orbit) settings 1 2) Condition Scan CR Test –Volts, temp, delays, thresholds min/max 21 3) Baseline CR Trigger Subtests –Each trig (tkr, calL, calH) alone 3 4) Nominal Rate CR Test –Cosmics + Ext Trigs 1, 5, 10, 20 KHz 4 –Cosmics + Am 241 source 1, 5, 10, 20 KHz (In Review) 4 5) Nominal Rate Condition Scan CR Test –Same as (2) + Ext Trig 10 KHz 21

GLAST LAT Project11/18/04 I&T Two Tower IRR 8 Two Tower E2E Data Runs 6) CAL Nominal Rate CR Test # of 1 hour of Runs –Lower Cal Low thresh to give 1, 5, 10 KHz3 –Lower Cal High thresh to give 1, 5, 10 KHz 3 7) Baseline CR Data Volume Sub-Tests –Same as (1) but no zero suppression 1 8) Nominal Rate CR Data Volume Sub Tests –Cosmics + Ext Trigs 1, 5, 10, 20 KHz No zero suppress 4 –Cosmics + Ext Trigs 1, 5, 10, 20 KHz 4 range read 4 9) Van de Graaff (VG) Tests (Target centered at EM2 front face) –VG+Cosmics No zero suppress 1 –VG+Cosmics Zero suppress 1 –VG+Cosmics+Ext Trigs 1, 10 KHz 2 –VG into side above super GLAST. Horizontal 1 A) Muon Telescope – only external trig input opens trigger OR –Measure fraction of events with ACD, TKR, CAL in the trigger window 1 (8 hrs)

GLAST LAT Project11/18/04 I&T Two Tower IRR 9 Particle Test Runs (1) Total Time Currently is 3 weeks and 1 day at 100% efficiency. 67% efficiency is likely. Need to work on fitting required testing (E2E test report and SVAC tests) into 1 & 2 tower test schedule. For details see LAT-TD

GLAST LAT Project11/18/04 I&T Two Tower IRR 10 Particle Test Runs (2)

GLAST LAT Project11/18/04 I&T Two Tower IRR 11 Particle Test Runs (3)

GLAST LAT Project11/18/04 I&T Two Tower IRR 12 Particle Test Run Acceptance Criteria Each E2E trigger and data flow tests will have a Pass/Fail criteria. –System did not hang –No parity errors –No time outs –i.e. no transport errors Data quality monitoring for E2E SVAC offline (see next presentation). –Reconstructed angular distribution of cosmic rays