Industrial Avionics Working Group 18/04/07 Assessing the Safety Case Architecture Optimising the Design Architecture and Safety Case Architecture.

Slides:



Advertisements
Similar presentations
© 2010 Experian Information Solutions, Inc. All rights reserved. 1 Moody’s CreditCycle™ Plus powered by Experian Overview  A comprehensive loss forecasting,
Advertisements

Rational Unified Process
Industrial Avionics Working Group 18/04/07 Modular Certification Basic Concepts.
Industrial Avionics Working Group 18/04/07 Propose Safety Case Architecture.
Industrial Avionics Working Group 19/04/07 Modular Certification Developing Safety Case Modules.
Recall The Team Skills 1. Analyzing the Problem (with 5 steps) 2. Understanding User and Stakeholder Needs 3. Defining the System 4. Managing Scope 5.
Industrial Avionics Working Group 19/04/07 The Relationship Between the Design and Safety Domains in IAWG Modular Certification What are DGRs and How are.
Industrial Avionics Working Group 13/09/06 Incremental Certification Phil Williams – General Dynamics (UK) Ltd Representing the Industrial Avionics Working.
Industrial Avionics Working Group 18/04/07 Application Integration.
Industrial Avionics Working Group 19/04/07 Architecture Integration.
Industrial Avionics Working Group 18/04/07 Modular Certification Safety Case Contracts.
Industrial Avionics Working Group 18/04/07 Defining the Safety Case Architecture IAWG Modular Certification.
Annex I: Methods & Tools prepared by some members of the ICH Q9 EWG for example only; not an official policy/guidance July 2006, slide 1 ICH Q9 QUALITY.
Sept EE24C Digital Electronics Project Design of a Digital Alarm Clock.
® IBM Software Group © 2006 IBM Corporation PRJ480 Mastering the Management of Iterative Development v2 Module 3: Phase Management - Inception.
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
Utvärderingsenheterna 1 MDH HVV (School of Health, Care and Social Welfare) Health and Welfare 8 sub groups IDT (School of Innovation, Design and Engineering)
Assurance Case Approach TECNALIA Inspiring Business Novara November, 2013 TRIAL WS.
Slide 1 Using Models Introduced in ISA-d Standard: Security of Industrial Automation and Control Systems (IACS) Rahul Bhojani ISA SP99 WG4 Meeting.
1DMG Confidential. Background: Key Problem Areas  Scalability Ingest and export processes not able to handle burst traffic loads Exponential growth in.
Layers of Protection Analysis
Technology New York State Learning Standards for Grades 7 & 8.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
ERP Implementation Fundamentals Richard Byrom Oracle Consultant, Speaker and Author
Safety Self-Assessments Assessing opportunities to improve Workers’ Compensation best practices within an organization.
CONCLUSION The conclusion of this work is that it is possible to develop a problem-solving method providing evolutionary computational support to general.
Formative assessment of the Engineering Design process Review questions in handout Write brief, informal answers to each question.
CSE 303 – Software Design and Architecture
Testing Maturity Model (TMM). Introduction For the past decade, the software industry has put substantial effort in improving the quality of its products.
Software Project Management1 Technical Assessment Functionality against hardware and software The strategic IS plan of the organization any constraints.
Satellite MAS Position Statement FOSE-MAS 2008 – Danny Weyns.
Smart Home Technologies
1 Text Layout Introduction (1-4) Team Skill 1 – Analyzing the problem (5-7) Team Skill 2 – Understanding User and Stakeholder Needs (8-13) Team Skill 3.
Integration integration of all the information flowing through a company – financial and accounting, human resource information, supply chain information,
Proposals and projects in FP7 Challenge 7 Information day Brussels January 2007 Coordination and Support Actions.
Supporting further and higher education E-learning Framework and Tools Tish Roberts JISC Programme Manager.
Bunker Refueling Planning and Onboard Fuel Inventory Mgmt Software.
IAEA International Atomic Energy Agency Monika Kinker Radioactive Waste and Spent Fuel Management Unit Division of Radiation, Transport and Waste Safety.
Software Engineering Lecture 10: System Engineering.
Industrial Avionics Working Group 18/04/07 Design for Safety IAWG Modular Certification.
4 th Workshop, Amsterdam, 23 rd -25 th April 2007 ASAS-SEP Applications Airborne Implementation Overall Architectural Considerations.
“AIRborne information for Emergency situation Awareness and Monitoring” AIRBEAM Project Kaci Bourdache.
DARSHANA RAGHU MANAGEMENT. Risk Management Risk management is the identification, assessment, and prioritization of risks followed by coordinated and.
Reducing maintenance costs by including imperfect inspections J. Driessen*, Eindhoven University of Technology February, 2014 / School of Industrial Engineering.
Eurostat Overview of the project Meeting of the Expert Group on the integration of the European social surveys January 2015.
Human-mimetic approach to the integrated monitoring, management and optimization of a symbiotic cluster of smart production units Project Coordinator:
Development of Assessments Laura Mason Consultant.
Title of proposal Smart Spaces 2015 Proposers (name, organization, )  … Description of idea  …
Key Principles of Multi-Echelon Optimization (MEO)
Layers of Protection Analysis
Role and Potential of TAs for Industrial Scheduling Problems
Energy Management System (EnMS) Management Review
CRISC Exam Certified in Risk and Information Systems Control (CRISC)
Strategy document for LHCC – Run 4
Recall The Team Skills Analyzing the Problem (with 5 steps)
"IT principles" Context, roadmap
Chapter 5 Designing the Architecture Shari L. Pfleeger Joanne M. Atlee
SISAI STATISTICAL INFORMATION SYSTEMS ARCHITECTURE AND INTEGRATION
Unit 09 – LO3 - Be able to Implement and Test Products
Engineering design is the process of devising a system, component, or process to meet desired needs. It is a decision-making process in which the basic.
Application Portfolio Management Meeting the challenge of reducing requirements churn in projects Pat Loughran OSS PROJECT OFFICE MANAGER ERICSSON.
What to do with legacy designs?
Avoiding failure when implementing an enterprise system
Coordination and Support Actions
Status of the IAEA safety standards and Relation to the CRAFT project
Layers of Protection Analysis
CYnergy Kick-Off Meeting
Open Systems and Open Architecture – the benefits case
COMS BoF Addressing the Questions
Presentation transcript:

Industrial Avionics Working Group 18/04/07 Assessing the Safety Case Architecture Optimising the Design Architecture and Safety Case Architecture

Industrial Avionics Working Group 18/04/07 Assessing the Design Architecture & SCA Prioritise Change Scenarios based on probability, frequency, etc Assess candidate Software Designs and candidate Safety Case Architectures against change scenarios Recommend changes: –To the design, to improve change containment within the safety case, or –To the Safety Case Architecture, where external constraints prevent the optimal safety case architecture being used, –Or a combination of both Achieve mutually optimised solutions for both with respect to the impact of change

Industrial Avionics Working Group 18/04/07 An Optimised Safety Case Architecture Proposed SCA for IMS

Industrial Avionics Working Group 18/04/07 What is the scope of the Proposed SCA? Integrated Modular Systems Uses ASAAC-compatible three-layer stack May feature legacy products Arguments limited to those aspects which are ASAAC- compliant – scope of the Industrial Case Study May have wider applicability – terms and conditions apply.

Industrial Avionics Working Group 18/04/07 Proposed Safety Case Architecture

Industrial Avionics Working Group 18/04/07 Proposed Safety Case Architecture - Top

Industrial Avionics Working Group 18/04/07 Proposed Safety Case Architecture – Next Level