Don Gavel: Keck NGAO meeting April 25, 2007 1 Some Comments on NGAO System Design and Specification Donald Gavel NGAO Team Meeting 6 April 25, 2007.

Slides:



Advertisements
Similar presentations
Subaru AO in future. Outline Overview of AO systems at Mauna Kea and in the world. Ongoing plan of AOS at Subaru and Mauna Kea. What’s in future.
Advertisements

RASC, Victoria, 1/08/06 The Future of Adaptive Optics Instrumentation David Andersen HIA.
NGAO Systems Engineering Status Team Meeting #3 (Video) R. Dekany 13 December 2006.
Why do astronomers need AO? Lick Observatory, 1 m telescope Long exposure image Short exposure image: “speckles” With adaptive optics Three images of a.
Science Group: Status, Plans, and Issues Claire Max Liz McGrath August 19, 2008.
The Project Office Perspective Antonin Bouchez 1GMT AO Workshop, Canberra Nov
AO188/LGS status AO188 development group(Subaru Telescope, NAOJ) (JST)
Trade Study Report: Fixed vs. Variable LGS Asterism V. Velur Caltech Optical Observatories Pasadena, CA V. Velur Caltech Optical Observatories Pasadena,
NGAO Companion Sensitivity Performance Budget (WBS ) Rich Dekany, Ralf Flicker, Mike Liu, Chris Neyman, Bruce Macintosh NGAO meeting #6, 4/25/2007.
W. M. Keck Observatory’s Next Generation Adaptive Optics Preliminary Design & Path Forward Peter Wizinowich, Sean Adkins, Rich Dekany, Don Gavel, Claire.
NGAO System Design Review Response Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting June 18, 2008.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max, Sean Adkins for NGAO Team SSC Meeting February 20, 2008.
Caltech Optical Observatories1 NGAO Point and Shoot Trade Study Status Richard Dekany, Caltech Chris Neyman, Ralf Flicker, W.M. Keck Observatory.
Low order wavefront sensor trade study Richard Clare NGAO meeting #4 January
The Need for Contiguous Fields NGAO Team Meeting, Waimea January 22, 2007 Claire Max.
WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. ~ March 20, 2009 February 5, 2009 DRAFT.
1 Laser Guide Star Wavefront Sensor Mini-Review 6/15/2015Richard Dekany 12/07/2009.
Object selection ideas for NGAO NGAO Meeting #6 Anna Moore April 26, 2007.
NGAO Trade Study : LOWFS type and architecture Stephan Kellner, Ralf Flicker NGAO Team meeting #4, WMKO Kamuela HI, 1/22/2007 Status report.
Keck Next Generation Adaptive Optics Team Meeting 6 1 Optical Relay and Field Rotation (WBS , ) Brian Bauman April 26, 2007.
The Path to NGAO Core Science Requirements Claire Max and Liz McGrath NGAO Team Meeting September 11-12, 2008.
NGAO Meeting #3 Introduction NGAO Meeting #3 Peter Wizinowich December 13, 2006.
AO opto-mechanical design architectures Cost Impact Don Gavel NGAO Team Meeting #5 February 5, 2009.
WFS Preliminary design phase report I V. Velur, J. Bell, A. Moore, C. Neyman Design Meeting (Team meeting #10) Sept 17 th, 2007.
NGAO Instrumentation Cost Drivers and Cost Savings September 2008 Sean Adkins.
Demonstration of Science Observing Modes AOWG meeting Dec. 5, 2003 D. Le Mignant, A. Bouchez for the Keck AO team.
WBS 3.3 Laser Facility Jim Bell, Jason Chin, Erik Johansson, Chris Neyman, Viswa Velur Laser Architecture Meeting Oct 1 st, 2007.
Science Operations Replan NGAO - Meeting 6 D. Le Mignant W. M. Keck Observatory 04/25/2007.
NGAO System Design Phase Management Report - Replan NGAO Meeting #6 Peter Wizinowich April 25, 2007.
LGS wavefront sensor : Type and number of sub-apertures NGAO Team Meeting #4 V. Velur Caltech Optical Observatories 01/22/2007.
NGAO Status R. Dekany January 31, Next Generation AO at Keck Nearing completion of 18 months System Design phase –Science requirements and initial.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team (with input from Sean Adkins, Matthew Britton, Ralf.
Don Gavel: Keck NGAO meeting April 25, Keck NGAO Project Replan: AO and Laser Systems Donald Gavel NGAO Team Meeting 6 April 25, 2007.
The Future of AO at Keck Sept 2004 Mike Brown, for the AOWG and Keck AO team.
Don Gavel: Keck NGAO meeting April 25, LAO Activities Relevant To Keck NGAO Donald Gavel NGAO Team Meeting 6 April 26, 2007.
1 Keck NGAO Project Replan: Science Cases and Requirements Claire Max NGAO Team Meeting 6 April 25, 2007.
NGAO System Design Phase System & Functional Requirements Documents NGAO Meeting #6 Peter Wizinowich April 25, 2007.
NGAO Team Meeting Management Peter Wizinowich March 19, 2009.
High Redshift Galaxies: Encircled energy performance budget and IFU spectroscopy Claire Max Sept 14, 2006 NGAO Team Meeting.
NGAO Meeting #5 Introduction NGAO Meeting #5 Peter Wizinowich March 7, 2007.
WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. December 2, 2008 DRAFT.
W. M. Keck Observatory’s Next Generation Adaptive Optics (NGAO) Facility Peter Wizinowich, Sean Adkins, Rich Dekany, Don Gavel, Claire Max for NGAO Team:
WMKO Next Generation Adaptive Optics: AO System Design Impact of Cost Savings Ideas Don Gavel December 19, 2008.
Black Holes in Nearby Galaxies Claire Max NGAO Team Meeting March 7, 2007.
Throughput and Emissivity for Alternatives to the Baseline AO Layout Don Gavel NGAO Telecon January 28, 2009.
Plan to develop system requirements through science cases Claire Max Sept 14, 2006 NGAO Team Meeting.
Trade Study Report: NGAO versus Keck AO Upgrade NGAO Meeting #5 Peter Wizinowich March 7, 2007.
Build to Cost Meeting: Major NGAO system cost savings ideas Don Gavel NGAO Team Meeting September 11-12, 2008.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max, Sean Adkins for NGAO Team SSC Meeting November 6, 2007.
What Requirements Drive NGAO Cost? Richard Dekany NGAO Team Meeting September 11-12, 2008.
NGAO Wavefront Error Performance Budgets R. Dekany 13 May 2010.
The Gemini MCAO System (EPICS Meeting, SLAC, April 2005) 1 The Gemini MCAO System Andy Foster Observatory Sciences Ltd.
NGAO Controls Team Kickoff Meeting August 5, 2008 Erik Johansson.
A visible-light AO system for the 4.2 m SOAR telescope A. Tokovinin, B. Gregory, H. E. Schwarz, V. Terebizh, S. Thomas.
Adaptive Optics Nicholas Devaney GTC project, Instituto de Astrofisica de Canarias 1. Principles 2. Multi-conjugate 3. Performance & challenges.
Status report of AO188+LGS (+future AO) Yutaka Hayano (Subaru Telescope, NAOJ) S. Oya, M. Hattori, Y. Saito, Y. Minowa, M. Ito, H. Terada, T.S. Pyo, H.
1 MCAO at CfAO meeting M. Le Louarn CfAO - UC Santa Cruz Nov
March 31, 2000SPIE CONFERENCE 4007, MUNICH1 Principles, Performance and Limitations of Multi-conjugate Adaptive Optics F.Rigaut 1, B.Ellerbroek 1 and R.Flicker.
GLAO Workshop Leiden April 2005 Remko Stuik Leiden Observatory.
Overview Science drivers AO Infrastructure at WHT GLAS technicalities Current status of development GLAS: Ground-layer Laser Adaptive optics System.
AO4ELT, Paris A Split LGS/NGS Atmospheric Tomography for MCAO and MOAO on ELTs Luc Gilles and Brent Ellerbroek Thirty Meter Telescope Observatory.
Keck Next Generation AO Next Generation Adaptive Optics Meeting #2 Caltech November 14, 2006 P. Wizinowich for NGAO Executive Committee.
Introduction of RAVEN Subaru Future Instrument Workshop Shin Oya (Subaru Telescope) Mitaka Adaptive Optics Lab Subaru Telescope Astronomical.
Tip/tilt options Trade Study Report on Stand-alone T/T vs. DM on T/T Stage (WBS ) Brian Bauman December 12, 2006.
Page 1 Lecture 15 The applications of tomography: LTAO, MCAO, MOAO, GLAO Claire Max AY 289 March 3, 2016.
Robo-AO: Demo Period Nicholas Law.
Science Priorities and Implications of Potential Cost Savings Ideas
NGAO System Design Project Plans and Schedule
Trade Study Report: Fixed vs. Variable LGS Asterism
NGAO Trade Study GLAO for non-NGAO instruments
Presentation transcript:

Don Gavel: Keck NGAO meeting April 25, Some Comments on NGAO System Design and Specification Donald Gavel NGAO Team Meeting 6 April 25, 2007

Don Gavel: Keck NGAO meeting April 25, We need to be careful when writing specifications SRD = System Requirements DocumentSRD = System Requirements Document Make the specifications traceable, either:Make the specifications traceable, either: Science case driverScience case driver Engineering selection based on performanceEngineering selection based on performance or Costor Cost In particular, what is driving the wide field? Science or Technical consideration (e.g. capturing TT stars)? Critique of the present SRDCritique of the present SRD Implicitly assumes a single AO system will be built, when there is at least 2, maybe 4 under considerationImplicitly assumes a single AO system will be built, when there is at least 2, maybe 4 under consideration (on-axis, dMOAO, interferometer, contiguous wide-field)

Don Gavel: Keck NGAO meeting April 25, Big Trade Items High Strehl –or- High Sky Coverage?High Strehl –or- High Sky Coverage? Fixed #LGS (or laser power)Fixed #LGS (or laser power) Fixed #DMsFixed #DMs These are cost limitsThese are cost limits High Strehl –and- High Sky CoverageHigh Strehl –and- High Sky Coverage Requires both more LGS and more DMs, alwaysRequires both more LGS and more DMs, always This is “architecture” neutral – doesn’t depend whether it’s MCAO or MOAOThis is “architecture” neutral – doesn’t depend whether it’s MCAO or MOAO It isn’t cost or risk neutralIt isn’t cost or risk neutral MCAO DMs are either not cheap or force more optical spacesMCAO DMs are either not cheap or force more optical spaces MOAO DMs need to run in open loopMOAO DMs need to run in open loop “Cheap(er)” solutions don’t work either, i.e. one DM in a wide field relay will force open loop WF sensing“Cheap(er)” solutions don’t work either, i.e. one DM in a wide field relay will force open loop WF sensing AND NOTE: throughput/emissivity is not architecture neutral eitherAND NOTE: throughput/emissivity is not architecture neutral either

Don Gavel: Keck NGAO meeting April 25, Case in point: thinking outside the box for the solutions driven purely by technical considerations There are no science cases, save hi-Z galaxies/AGNs (which want dIFUs), that want a large field - at most 20 arcsec for galactic centerThere are no science cases, save hi-Z galaxies/AGNs (which want dIFUs), that want a large field - at most 20 arcsec for galactic center So: Here is a suggested improvement (credit: Brian Bauman) for narrow field AO that might improve sky coverage at lower costSo: Here is a suggested improvement (credit: Brian Bauman) for narrow field AO that might improve sky coverage at lower cost Science Field Tip/Tilt Star LGS Technical Field Movable LGS Fixed LGS asterism